POWER PRODUCTION FORECAST BASED WIND TURBINE CONTROL
20230193874 · 2023-06-22
Inventors
- Mu WEI (Solbjerg, DK)
- Thair Mahmoud (Williams Landing, AU)
- Jacob Quan Kidmose (Risskov, DK)
- Manas Patankar (Glen Huntly, AU)
- Hugh McKenzie (Middle Park, AU)
- Antonio Martinez (Oakleigh South, AU)
Cpc classification
H02J3/004
ELECTRICITY
Y02E10/72
GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
F03D7/0284
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
International classification
F03D7/02
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
H02J3/38
ELECTRICITY
Abstract
A method is provided for determining a power production capacity of at least one wind turbine connected to a power grid. The method includes receiving, e.g. from a power grid control center, a power production forecast for the at least one wind turbine, and then monitoring an actual grid frequency of the power grid. Based on the actual grid frequency and a nominal grid frequency, a frequency support power reserve is determined. The power production capacity is then determined in dependence of the determined frequency support power reserve and the power production forecast
Claims
1. A method of determining a power production capacity for at least one wind turbine connected to a power grid, the method comprising: receiving a power production forecast for the at least one wind turbine; monitoring an actual grid frequency of the power grid; determining a frequency support power reserve in dependence of a nominal grid frequency and the actual grid frequency; and determining the power production capacity in dependence of the determined frequency support power reserve and the power production forecast.
2. The method of claim 1, further comprising controlling the at least one wind turbine in accordance with the determined power production capacity.
3. The method of claim 1, wherein the frequency support power reserve is increased when the actual grid frequency is below the nominal grid frequency or reduced when the actual grid frequency is above the nominal grid frequency.
4. The method of claim 1, wherein the frequency support power reserve is further determined in dependence of a rate of change of the actual grid frequency.
5. The method of claim 1, further comprising monitoring R an actual power production of the at least one wind turbine and adjusting the received power production forecast in dependence of the actual power production.
6. The method of claim 5, comprising determining a power forecasting error based on a comparison of the received power production forecast and the actual power production, and adjusting the received power production forecast in dependence of the power forecasting error.
7. The method of claim 6, further comprising determining a rate of change of the power forecasting error, and adjusting the received power production forecast in dependence of the rate of change of the power forecasting error.
8. The method of claim 7, wherein the rate of change of the power forecasting error is determined as an accumulated change of the power forecasting error over a number of time intervals.
9. The method of claim 1, wherein the determining the power production capacity employs a fuzzy logic algorithm.
10. The method of claim 1, wherein the power production capacity comprises a lower power production limit and an upper power production limit.
11. The method of claim 1, wherein the power production capability is forwarded to a grid operator.
12. The method of claim 11 wherein the grid operator generates a power reference based on the power production capability and wherein the at least one turbine is controlled in accordance with the power reference.
13. (canceled)
14. (canceled)
15. A power plant controller for controlling operation of at least one wind turbine connected to a power grid, the power plant controller, comprising: a communication interface; one or more processors configured to perform an operation, comprising: receiving, via the communication interface, a power production forecast for the at least one wind turbine; monitoring an actual grid frequency of the power grid; determining a frequency support power reserve in dependence of a nominal grid frequency and the actual grid frequency; and determining the power production capacity in dependence of the determined frequency support power reserve and the power production forecast.
16. The claim 15, the operation further comprising controlling the at least one wind turbine in accordance with the determined power production capacity.
17. A wind farm, comprising: at least one wind turbine; and a power plant controller operatively connected to the at least one wind turbine and comprising: a communication interface; and one or more processors configured to perform an operation, comprising: receiving, via the communication interface, a power production forecast for the at least one wind turbine; monitoring an actual grid frequency of the power grid; determining a frequency support power reserve in dependence of a nominal grid frequency and the actual grid frequency; and determining the power production capacity in dependence of the determined frequency support power reserve and the power production forecast.
Description
BRIEF DESCRIPTION OF THE DRAWINGS
[0011] Embodiments of the invention will now be described by way of example with reference to the accompanying drawings, in which:
[0012]
[0013]
DETAILED DESCRIPTION
[0014]
[0015] A central wind farm controller 20, is operatively coupled to the individual wind turbine controllers to centrally gather operational data from the individual wind turbines 10 and to align the control strategies of the individual wind turbines 10 in the wind farm 100. Such alignment is needed to ensure that the total supply of electric power by the wind farm 100 matches the demand, also in the event of varying wind conditions or mechanical failure at one or more of the wind turbines 10 in the wind farm 100. The wind farm controller 20 may be physically located in or at one of the individual wind turbines 10, or in a separate building located at the same geographical site as the wind farm 100 itself. Alternatively, the wind farm controller 20 may be located remotely or its functionality may be distributed over multiple locations.
[0016] If located at the wind farm 100 itself, the wind farm controller 20 may be coupled to a central wind sensor 30 for monitoring the wind speed and direction at the location of the wind farm.
[0017] As an alternative or in addition thereto, wind turbines 10 may each have their own wind sensors for allowing even more accurate monitoring of real-time wind conditions.
[0018] The wind farm controller 20 is further operatively coupled to a central power grid controller 40 that may be located anywhere in the power grid. The central power grid controller 40 communicates with wind farm controllers 20 of multiple wind farms 100 at different locations, with the objective to match the total supply of and demand for electric power from the wind farms 100 connected to the power grid. As described in, e.g., WO 2019/238185 A1, a power grid controller 40 may use weather forecasts and information about the wind turbines 10 in the wind farms 100 in order to generate a power production forecast for the respective wind farm 100. The wind farm controller 20 receives this power production forecast and controls the wind farm 100 accordingly, with the aim to deliver the amount of electric power expected by the power grid controller. When the wind farm 100 delivers less power, this will lead to reduced revenue and the stability of the grid may be compromised. When the wind farm 100 delivers more power, this will reduce the stability of the grid too and penalty payments may have to be paid to the network operator or other authorities.
[0019] Wind farm specific data, gathered at the wind turbines 10 and/or at the wind farm controller 20 may be used to adjust the power production forecast as received from a third party forecast provider, such as the central power grid controller 40. For example, when local wind speed data shows that the wind turbines 10 can produce more electric power than expected, one or more of the wind turbines 10 may be temporarily downrated. When one of the wind turbines 10 produces less power than expected, e.g. due to mechanical problems, the other wind turbines 10 may be instructed to temporarily produce more electric power, such that the total power supplied by the wind farm keeps in line with the original power production forecast.
[0020]
[0021] The method starts with a central forecast 210 made by the central power grid controller 40 or some other third party forecast provider. Information about the wind farm 100, such as the number and type of wind turbines 10, historic power production data and maintenance schedules is combined with weather forecasts for the geographical location of the wind farm, in order to make an as accurate as possible estimation of the amount of electric power the wind farm 100 will be able to produce in an upcoming time window of, e.g. 5 minutes, 10 minutes, 1 hour or a full day. Based on the combined power production forecasts of all the wind farms 100 on the power grid, the central power grid controller 40 can then also make a forecast of the total amount of electric power that can be produced by all the wind turbines 10 on the power grid together. This information may then be used to come up with a strategy to match the supply and demand of electric power on the power grid as a whole. Wind farms 100 and other power plants connected to the grid are then instructed to deliver their share of the required electric power.
[0022] In a forecast receiving step 220, the wind farm controller 20 receives the power production forecast that has just been submitted by the power grid controller 40. In most situations, the power production forecast will correspond to the amount of electric power the wind farm 100 is expected to produce in the relevant time frame. Based on this power production forecast, the wind farm controller 20 will determine a power production capacity that may be used as a target for controlling the power delivery by the wind turbines 10 in the wind farm 100. In times of low demand, the wind farm controller 20 may further receive a power dispatch reference from the power grid controller 40, such an externally provided power dispatch reference can, e.g., be expressed as a percentage (typically ≤100%) of the power production forecast. Additionally, an upper and lower power delivery limit may be received, representing a range of power output values that will ensure that electric power demands are met and power grid stability can be maintained. Alternatively, such upper and lower power delivery limits may be fixed percentages or amounts of kilowatt hours that the provided power is allowed to differ from the power production forecast or power dispatch reference.
[0023] Then, while power production continues, the wind farm controller 20 monitors the wind farm operation in monitoring step 230. Aspects of the wind farm operation that may be monitored include the power production of each of the wind turbines 10, variations in local wind speed, and power grid frequency. The data needed for this monitoring step 230 is primarily obtained by sensors of the wind turbines 10, but may also come from functional equipment that is part of the wind farm 100 and shared by multiple wind turbines 10. For example, weather stations may monitor weather conditions for all or a subset of the wind turbines 10 and the wind farm controller itself may be directly coupled to a sensor for monitoring the grid frequency.
[0024] All this locally gathered monitoring data is then used to determine the power production capacity and/or to adjust the power production forecast received from the central power grid controller 40, in a production capacity determining step 240. Preferably, this step is performed continuously or periodically at a frequency that is higher than the frequency with which new power production forecasts are provided by the central power grid controller 40.
[0025] For example, the central power production forecasts are generated and communicated every 10 minutes and the wind farm controller 20 locally adjusts the power production capacity every 1 or 2 minutes to ensure that the wind farm 100 can be controlled in such a way that it will produce electric power in accordance with the forecasts and delivery targets provided by the central power grid controller 40.
[0026] When, e.g., wind speeds are higher than expected and it is established that the wind farm 100 produces more electric power than would have been expected in view of the centrally provided power production forecast, the power production capacity may locally exceed the forecast. In a subsequent control step 250, one or more of the wind turbine 10 may then be downrated in order to ensure that the wind farm 100 will not overload the grid.
[0027] For a quicker and more accurate response to changes in the power production capacity of the wind farm, the wind farm controller preferably monitors not just the difference between the forecasted and the actual power production (P.sub.error=P.sub.forecast−P.sub.measured), but also the rate of change of this forecasting error (dP.sub.error/df). For example, when the actual power production is below the original forecast, but the rate of change of the forecasting error is such that the forecasted power production can be expected to increase soon, there may be no need to temporarily overrate one or more of the wind turbines 10. However, if the rate of change of the forecasting error indicates that the forecasting error may be growing, it may be useful to temporarily overrate one or more of the wind turbines 10.
[0028] The rate of change of the forecasting error may be calculated in different ways. For example, at the moment t=T.sub.N, the rate of change of the forecasting error (P.sub.error) may just be the average change of the forecasting error since the previous measurement at t=T.sub.N-1:
[0029] Alternatively, a trend in the change of the forecasting error at the moment t=T.sub.n may be established by considering an accumulated change and direction over a number of time periods, since receiving the central power production forecast at t=T.sub.0:
[0030] In addition to the forecasting error and its development over time, also the grid frequency is used as an input parameter for determining the power production capacity. For the operation of a stable power grid, it is important that the grid frequency is kept within a narrow grid frequency bandwidth around the nominal grid frequency that is typically 50 or 60 Hz. The actual grid frequency is typically measured by integrating the grid frequency over a predetermined time interval and dividing the integrated value by the duration of the time interval to obtain an average grid frequency. When the actual grid frequency drops below the nominal grid frequency, it is even more important for the wind farm 100 not to deliver less electric power than the power production forecast, in order to contribute to the grid stability and avoid additional penalty payments. Similarly, when the actual grid frequency significantly exceeds the nominal grid frequency, delivering power in excess to the power production forecast is to be avoided. Depending on the size and course of the grid frequency error (f.sub.error=f.sub.measure−f.sub.nominal), the determined power production capacity may then be adjusted and production targets may be adapted to ensure that both the power production and the frequency support of the wind farm 100 meet the requirements defined by the network operator. The grid frequency error is typically measured by sampling the grid frequency at 4 second intervals and averaging the measured frequency over a 1 minute period, but other measurement strategies may be used as well.
[0031] In an embodiment of the invention, the wind farm controller 20 monitors the actual grid frequency and possible also the rate of change of the actual grid frequency and determines a frequency support power reserve which may be added to the original or previously adjusted power production forecast in order to ensure that the wind farm 100 can play its role in the power grid frequency stabilisation. The frequency support power reserve may either be positive or negative and its size may depend on the size and the course of the grid frequency error. When additional power may be needed for grid frequency control, the power production forecast is adjusted downward. With a negative frequency support power reserve, the power production forecast can be adjusted upward. Like with the actual power production, responsiveness and accuracy may be improved by further taking into account a rate of change of the frequency error (df.sub.error/df).
[0032] The determining of the power production capacity and the adjustment of the power production forecast based on multiple input parameters may be realised using a linear function with predetermined gain factors for each of the input parameters taken into account. Alternatively, more complex mathematical function may be used. Another suitable method for determining or adjusting the power production capacity and the power production forecast is the use of fuzzy logic algorithms. Such fuzzy logic algorithms use fuzzy membership functions to relate the input parameter values to corresponding classified levels. A rule based system and a further fuzzy membership function then translates the classified levels of the input signals to an output value that can be multiplied by a gain factor to determine the power production capacity or the adjusted power production forecast.
[0033] When the power production capacity has been determined, the wind turbines 10 in the wind farm 100 are controlled accordingly in control step 250. For example, a power production capacity that exceeds the power production forecast may lead to a downrating of one or more of the wind turbines 10.
[0034] Optionally, when due to changing circumstances the amount of electrical power that can be delivered deviates from the originally received power production forecast, adjusted power production forecasts are communicated to the central power grid controller 40. The power grid controller 40 may then use this information for improving the accuracy of any future forecasts. Significant downward adjustments of the power production forecast may trigger the central power grid controller 40 to instruct other power plants to produce additional power in order to compensate for the expected decline in power production at the wind farm 100.