Cloud control power socket device with dual indicators
09843224 ยท 2017-12-12
Assignee
Inventors
Cpc classification
H02J13/0005
ELECTRICITY
Y04S10/40
GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
Y02B70/3225
GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
Y04S20/222
GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
H02J13/00001
ELECTRICITY
International classification
Abstract
A cloud control power socket device includes a housing, a power plug, a first switch device, a second switch device, a socket and a cloud control circuit. The power plug has first and second conductive wires. The first switch device is arranged on the housing. The second switch device is arranged in the housing and has a first end, a second end, and a control end. The socket is connected to the second end of the second switch device and the second conductive wire. The cloud control circuit is connected to the control end of second switch device. The first switch device includes an AC switch; a first indicator having two ends connected to the AC switch and the second conductive wire; and a second indicator having two ends connected to the second conductive wire and the second switch device.
Claims
1. A cloud control power socket device with dual indicators, comprising: a housing; a power plug connected to the housing and having a first conductive wire and a second conductive wire for being plugged into a utility power socket; a first switch device arranged on the housing; a second switch device arranged in the housing and having a first end, a second end, and a control end; at least one socket arranged on the housing and having two inserting holes connected to the second end of the second switch device and the second conductive wire, respectively; and a cloud control circuit arranged in the housing and connected to the control end of second switch device, wherein the first switch device includes: an AC switch having a first end and a second end, the first end being connected to the first conductive wire; a first indicator having two ends connected to the second end of the AC switch and the second conductive wire, respectively; and a second indicator having two ends connected to the second conductive wire and the second end of the second switch device, respectively.
2. The cloud control power socket device with dual indicators as claimed in claim 1, wherein the first switch device is a manual switch having a light-penetrable shell, and the first indicator and the second indicator are disposed such that light of the first indicator and the second indicator can penetrate the light-penetrable shell.
3. The cloud control power socket device with dual indicators as claimed in claim 1, wherein the second switch device is a relay, which is controlled by the cloud control circuit to be turned on or turned off.
4. The cloud control power socket device with dual indicators as claimed in claim 1, wherein the first indicator and the second indicator are each a neon lamp or an LED lamp.
5. The cloud control power socket device with dual indicators as claimed in claim 4, wherein the first indicator and the second indicator are provided with different colors.
6. The cloud control power socket device with dual indicators as claimed in claim 4, wherein the first indicator and the second indicator are arranged at different positions of the housing.
7. The cloud control power socket device with dual indicators as claimed in claim 1, further comprising a power adaptor circuit having an input connected to the first conductive wire and the second conductive wire, and an output connected to the cloud control circuit, so as to supply power to the cloud control circuit.
8. A cloud control power socket device with dual indicators, comprising: a housing; a power plug connected to the housing and having a first conductive wire and a second conductive wire for being plugged into a utility power socket; a cloud control circuit arranged in the housing; a plurality of cloud control power socket units, each including: a first switch device arranged on the housing; a second switch device arranged in the housing and having a first end, a second end, and a control end connected to the cloud control circuit; and a socket arranged on the housing and having two inserting holes connected to the second end of the second switch device and the second conductive wire, respectively, wherein the first switching device includes: an AC switch having a first end and a second end, the first end being connected to the first conductive wire; a first indicator having two ends connected to the second end of the AC switch and the second conductive wire, respectively; and a second indicator having two ends connected to the second conductive wire and the second end of the second switch device, respectively.
9. The cloud control power socket device with dual indicators as claimed in claim 8, wherein the first switch device is a manual switch having a light-penetrable shell, and the first indicator and the second indicator are disposed such that light of the first indicator and the second indicator can penetrate the light-penetrable shell.
10. The cloud control power socket device with dual indicators as claimed in claim 8, wherein the second switch device is a relay, which is controlled by the cloud control circuit to be turned on or turned off.
11. The cloud control power socket device with dual indicators as claimed in claim 8, wherein the first indicator and the second indicator are each a neon lamp or an LED lamp.
12. The cloud control power socket device with dual indicators as claimed in claim 11, wherein the first indicator and the second indicator are provided with different colors.
13. The cloud control power socket device with dual indicators as claimed in claim 8, further comprising a power adaptor circuit having an input connected to the first conductive wire and the second conductive wire, and an output connected to the cloud control circuit, so as to supply power to the cloud control circuit.
Description
BRIEF DESCRIPTION OF THE DRAWINGS
(1)
(2)
(3)
(4)
(5)
(6)
(7)
(8)
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENT
(9) With reference to
(10) The power plug 52 is connected to the housing 51 and has a first conductive wire 521 and a second conductive wire 522. The power plug 52 is provided to be inserted into a utility power socket.
(11) The second switch device 54 is arranged in the housing 51. The second switch device 54 is preferably a relay, which is controlled by the cloud control circuit 56 to be turned on or turned off. The second switch device 54 has a first end 541, a second end 542, and a control end 543.
(12) The first switch device 53 is arranged on the housing 51. Preferably, the first switch device 53 is a manual switch and has a light-penetrable shell. The AC switch 531 of first switch device 53 has a first end and 5311 a second end 5312, wherein the first end 5311 is connected to the first conductive wire 521 of power plug 52, and the second end 5312 is connected to the first end 541 of second switch device 54.
(13) In this embodiment, the first indicator 532 of first switch device 53 is arranged in the light-penetrable shell thereof so that the light of first indicator 532 can penetrate the light-penetrable shell. The first indicator 532 is preferably a neon lamp or an LED lamp, and the two ends thereof are respectively connected to the second end 5312 of the AC switch 531 and the second conductive wire 522.
(14) The two ends of the second indicator 533 of the first switch device 53 are respectively connected to the second conductive wire 522 and the second end 542 of the second switch device 54. In this embodiment, the second indicator 533 is also arranged in the light-penetrable shell of the first switch device 53, so that the light of the second indicator 533 can penetrate the light-penetrable shell. The second indicator 533 is preferably a neon lamp or an LED lamp. In order to clearly identify the first indicator 532 and the second indicator 533, preferably, the first indicator 532 and the second indicator 533 are provided with different colors, or the first indicator 532 and the second indicator 533 are disposed at different positions of the housing 51. For example, the second indicator 533 is arranged in a corresponding opening of the housing 51, so that the light thereof can penetrate the housing 51.
(15) The at least one socket 55 is arranged on the housing 51, and the two inserting holes 551 and 552 thereof are connected to the second end 542 of the second switch device 54 and the second conductive wire 522, respectively. The cloud control circuit 56 is arranged in the housing 51 and connected to the control end 543 of second switch device 54. The input of the power adaptor circuit 57 is connected to the first conductive wire 521 and the second conductive wire 522 and the output thereof is connected to the cloud control circuit 56, so that the utility power can be applied to the power adaptor circuit 57 for being converted into DC power and supplied to the cloud control circuit 56. As a result, the cloud control circuit 56 is able to turn on or off the second switch device 54 in response to commands received from the external network access point (AP).
(16) With the aforementioned cloud control power socket device with dual indicators, when the power plug 52 is plugged into a utility power socket and the first switch device 53 is pressed to cause the two ends 5311 and 5312 of the AC switch 531 to be conducted with each other, the first indicator 532 is lighted on due to current flowing through, which only indicates that the cloud control power socket device with dual indicators has been connected to the utility power. At this moment, if the cloud control circuit 56 turns on the second switch device 54, the utility power is conducted to the at least one socket 55 for supplying power to at least one electric appliance, and the second indicator 533 is also lighted on due to current flowing through, such that users on the scene can be aware of the at least one socket 55 being powered on by observing that the first indicator 532 and the second indicator 533 are both lighted on. On the contrary, if the cloud control circuit 56 turns off the second switch device 54, the utility power cannot be conducted to the at least one socket 55 and thus, at this moment, the second indicator 533 is not lighted on as there is no current flowing through, so that users can be aware of the at least one socket 55 being powered off by observing that the second indicator 533 is extinguished.
(17) With reference to
(18) Each of the cloud control power socket units 75 includes: a first switch device 751, a second switch device 752, and a socket 753, wherein the first switch device 751 includes an AC switch 7511, a first indicator 7512, and a second indicator 7513.
(19) The second switch device 752 is arranged in the housing 71. The second switch device 752 is preferably a relay, which is controlled by the cloud control circuit 73 to be turned on or off The second switch device 752 has a first end 7521, a second end 7522, and a control end 7523.
(20) The first switch device 751 is arranged on the housing 71. Preferably, the first switch device 751 is a manual switch and has a light-penetrable housing. The AC switch 7511 of first switch device 751 has a first end 75111 and a second end 75112. The first end 75111 is connected to the first conductive wire 721 of the power plug 72, and the second end 75112 is connected to the first end 7521 of second switch device 752.
(21) In this embodiment, the first indicator 7512 of first switch device 751 is arranged in the light-penetrable shell, so that the light of first indicator 7512 can penetrate the light-penetrable shell. The first indicator 7512 is preferably is a neon lamp or an LED lamp, and the two ends thereof are connected to the second end 75112 of the AC switch 7511 and the second conductive wire 722, respectively.
(22) The two ends of the second indicator 7513 of first switch device 751 are connected to the second conductive wire 722 and the second end 7522 of the second switch device 752, respectively. In this embodiment, the second indicator 7513 is also arranged in the light-penetrable shell of the first switch device 751 and thus the light of second indicator 7513 can penetrate the light-penetrable shell. The second indicator 7513 is preferably a neon lamp or an LED lamp. In order to clearly identify the first indicator 7512 and the second indicator 7513, preferably, the first indicator 7512 and the second indicator 7513 are provided with different colors, or the first indicator 7512 and the second indicator 7513 are disposed at different positions of the housing 71. For example, the second indicator 7513 is arranged in a corresponding opening of the housing 71, so that the light thereof can penetrate the housing 71.
(23) The socket 753 is arranged on the housing 71, and the two inserting holes 7531 and 7532 thereof are connected to the second end 7522 of the second switch device 752 and the second conductive wire 722, respectively.
(24) The cloud control circuit 73 is connected to the control end 7523 of the second switch device 752 of each cloud control power socket unit 75. The cloud control circuit 73 turns on or off the second switch device 752 in response to commands received from the external network access point (AP).
(25) With the aforementioned cloud control power socket device with dual indicators, when the power plug 72 is plugged into a utility power socket and the first switch device 751 is pressed to cause the two ends 75111 and 75112 of the AC switch 7511 to be conducted with each other, the first indicator 7512 is lighted on due to current flowing through, which only indicates that the cloud control power socket device with dual indicators has been connected to the utility power. At this moment, if the cloud control circuit 56 turns on the second switch device 752, the utility power is conducted to the corresponding socket 753 for supplying power to at least one electric appliance, and the second indicator 7513 is also lighted on due to current flowing through, such that users on the scene can be aware of the corresponding socket 753 being powered on by observing that the first indicator 7512 and the second indicator 7513 are both lighted on. On the contrary, if the cloud control circuit 73 turns off the second switch device 752, the utility power cannot be conducted to the corresponding socket 753 and thus, at this moment, the second indicator 7513 is not lighted on as there is no current flowing through, so that users can be aware of the corresponding socket 753 being powered off by observing that the second indicator 7513 is extinguished.
(26) In view of the forgoing, it is known that, in the present invention, there are indicators arranged on the cloud control power socket to respectively indicate the on/off status of the manual switch and the cloud control switch, so that users can be clearly aware of the power supply status of the socket without the possibility of making misjudgment, so as to achieve convenience and safety in electricity power usage.
(27) Although the present invention has been explained in relation to its preferred embodiment, it is to be understood that many other possible modifications and variations can be made without departing from the spirit and scope of the invention as hereinafter claimed.