Method for charging raw materials into blast furnace
11680748 · 2023-06-20
Assignee
Inventors
Cpc classification
F27D3/10
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
F27B1/20
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
International classification
F27B1/20
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
Abstract
A method for charging raw materials into a blast furnace is provided. The blast furnace includes a bell-less charging device that includes a plurality of main hoppers and an auxiliary hopper. The auxiliary hopper has a smaller capacity than the main hoppers. The method includes discharging ore charged in at least one of the plurality of main hoppers and then sequentially charging the ore from a furnace center side toward a furnace wall side by using a rotating chute. After charging of the ore is started, only the ore is charged from the rotating chute at least until charging of 15 mass % of the ore is completed based on a total amount of the ore to be charged per batch; then discharging of small-size coke charged in the auxiliary hopper is started; and then, the small-size coke is charged together with the ore from the rotating chute.
Claims
1. A method for charging raw materials into a blast furnace, the blast furnace including a bell-less charging device that includes a plurality of main hoppers and an auxiliary hopper at a furnace top portion, the auxiliary hopper having a smaller capacity than the main hoppers, the method comprising discharging ore charged in at least one of the plurality of main hoppers into a rotating chute through a collecting hopper and then sequentially charging the ore from a furnace center side toward a furnace wall side by using the rotating chute, wherein after charging of the ore is started, only the ore is charged from the rotating chute at least until charging of 15 mass % of the ore is completed based on a total amount of the ore to be charged per batch; then, at a point in time, discharging of small-size coke charged in the auxiliary hopper into the rotating chute through the collecting hopper is started such that the small-size coke is charged together with the ore from the rotating chute for a time period.
2. The method for charging raw materials into a blast furnace according to claim 1, wherein the small-size coke is discharged in batches from the auxiliary hopper.
3. The method for charging raw materials into a blast furnace according to claim 2, wherein, for a portion or all of a time period from a point in time at which charging of 27 mass % of the ore is completed to a point in time at which charging of 46 mass % of the ore is completed, based on the total amount of the ore to be charged per batch, a rate of discharge of the small-size coke to be discharged from the auxiliary hopper is increased compared with a rate of discharge employed outside of the time period.
4. The method for charging raw materials into a blast furnace according to claim 3, wherein, for a portion or all of the time period from the point in time at which charging of 27 mass % of the ore is completed to the point in time at which charging of 46 mass % of the ore is completed, based on the total amount of the ore to be charged per batch, the rate of discharge of the small-size coke to be discharged from the auxiliary hopper is set to be 1.5 to 2 times the rate of discharge employed outside of the time period.
5. The method for charging raw materials into a blast furnace according to claim 2, wherein a gas composition distribution in a furnace radial direction within the blast furnace is measured to determine a distribution of a CO gas utilization ratio associated with the furnace radial direction, and, for a region in the furnace radial direction in which the CO gas utilization ratio is greater than or equal to an average value of the CO gas utilization ratio associated with the furnace radial direction, the rate of discharge of the small-size coke to be discharged from the auxiliary hopper is set to be 1.5 to 2 times the rate of discharge employed outside of the region in the furnace radial direction.
6. The method for charging raw materials into a blast furnace according to claim 1, wherein the auxiliary hopper has a hopper body and an outlet, and the auxiliary hopper is provided at a position such that central axes of the hopper body and the outlet coincide with a central axis of a furnace body of the blast furnace.
7. The method for charging raw materials into a blast furnace according to claim 2, wherein the auxiliary hopper has a hopper body and an outlet, and the auxiliary hopper is provided at a position such that central axes of the hopper body and the outlet coincide with a central axis of a furnace body of the blast furnace.
8. The method for charging raw materials into a blast furnace according to claim 3, wherein the auxiliary hopper has a hopper body and an outlet, and the auxiliary hopper is provided at a position such that central axes of the hopper body and the outlet coincide with a central axis of a furnace body of the blast furnace.
9. The method for charging raw materials into a blast furnace according to claim 4, wherein the auxiliary hopper has a hopper body and an outlet, and the auxiliary hopper is provided at a position such that central axes of the hopper body and the outlet coincide with a central axis of a furnace body of the blast furnace.
10. The method for charging raw materials into a blast furnace according to claim 5, wherein the auxiliary hopper has a hopper body and an outlet, and the auxiliary hopper is provided at a position such that central axes of the hopper body and the outlet coincide with a central axis of a furnace body of the blast furnace.
11. A method for charging raw materials into a blast furnace, the blast furnace including a bell-less charging device that includes a plurality of main hoppers and an auxiliary hopper at a furnace top portion, the auxiliary hopper having a smaller capacity than the main hoppers, the method comprising discharging ore charged in at least one of the plurality of main hoppers into a rotating chute through a collecting hopper and then sequentially charging the ore from a furnace wall side toward a furnace center side by using the rotating chute, wherein discharging of small-size coke charged in the auxiliary hopper into the rotating chute through a collecting hopper is started simultaneously with the ore or at a point in time after the start of the ore, and then the small-size coke is charged together with the ore from the rotating chute; and charging of the small-size coke is stopped at least before a point in time at which charging of 90 mass % of the ore is completed based on a total amount of the ore to be charged per batch.
12. The method for charging raw materials into a blast furnace according to claim 11, wherein the small-size coke is discharged in batches from the auxiliary hopper.
13. The method for charging raw materials into a blast furnace according to claim 12, wherein, for a portion or all of a time period from a point in time at which charging of 54 mass % of the ore is completed to a point in time at which charging of 83 mass % of the ore is completed, based on the total amount of the ore to be charged per batch, a rate of discharge of the small-size coke to be discharged from the auxiliary hopper is increased compared with a rate of discharge employed outside of the time period.
14. The method for charging raw materials into a blast furnace according to claim 13, wherein, for a portion or all of the time period from the point in time at which charging of 54 mass % of the ore is completed to the point in time at which charging of 83 mass % of the ore is completed, based on the total amount of the ore to be charged per batch, the rate of discharge of the small-size coke to be discharged from the auxiliary hopper is set to be 1.5 to 2 times the rate of discharge employed outside of the time period.
15. The method for charging raw materials into a blast furnace according to claim 12, wherein the gas composition distribution in the furnace radial direction within the blast furnace is measured to determine the distribution of the CO gas utilization ratio associated with the furnace radial direction, and, for a region in the furnace radial direction in which the CO gas utilization ratio is greater than or equal to the average value of the CO gas utilization ratio associated with the furnace radial direction, the rate of discharge of the small-size coke to be discharged from the auxiliary hopper is set to be 1.5 to 2 times the rate of discharge employed outside of the region in the furnace radial direction.
16. The method for charging raw materials into a blast furnace according to claim 11, wherein the auxiliary hopper has a hopper body and an outlet, and the auxiliary hopper is provided at a position such that central axes of the hopper body and the outlet coincide with a central axis of a furnace body of the blast furnace.
17. The method for charging raw materials into a blast furnace according to claim 12, wherein the auxiliary hopper has a hopper body and an outlet, and the auxiliary hopper is provided at a position such that central axes of the hopper body and the outlet coincide with a central axis of a furnace body of the blast furnace.
18. The method for charging raw materials into a blast furnace according to claim 13, wherein the auxiliary hopper has a hopper body and an outlet, and the auxiliary hopper is provided at a position such that central axes of the hopper body and the outlet coincide with a central axis of a furnace body of the blast furnace.
19. The method for charging raw materials into a blast furnace according to claim 14, wherein the auxiliary hopper has a hopper body and an outlet, and the auxiliary hopper is provided at a position such that central axes of the hopper body and the outlet coincide with a central axis of a furnace body of the blast furnace.
20. The method for charging raw materials into a blast furnace according to claim 15, wherein the auxiliary hopper has a hopper body and an outlet, and the auxiliary hopper is provided at a position such that central axes of the hopper body and the outlet coincide with a central axis of a furnace body of the blast furnace.
Description
BRIEF DESCRIPTION OF THE DRAWINGS
(1)
(2)
(3)
(4)
(5)
(6)
(7)
(8)
(9)
(10)
(11)
(12)
DETAILED DESCRIPTION OF EMBODIMENTS OF THE INVENTION
(13) Mixing small-size coke into ore layers is effective for improving the gas permeability of the burden layer in a furnace. In this case, however, it is necessary to prevent deterioration of the furnace conditions that may be caused by small-size coke remaining in a deadman portion. Since small-size coke mixed with ore serves to promote a reaction of the ore, it is desirable that a region having a large ore layer thickness have an increased coke mixing ratio, as will be described later. Accordingly, in a case where small-size coke is to be mixed into an ore layer, it is desirable that the small-size coke be charged into the furnace in a manner that satisfies the conditions mentioned above.
(14) In a case where a raw material charging device of the related art is used, small-size coke is to be mixed with ore in a main hopper in advance and thereafter discharged into a blast furnace. In this case, at an initial stage of raw material charging, only ore is charged into the main hopper, and subsequently, raw materials including small-size coke are charged into the main hopper, to prevent the small-size coke from being discharged at an initial stage of discharging. However, in the main hopper, segregation occurs due to a difference in density between the ore and the small-size coke. In addition, since the raw materials are discharged from the main hopper in a funnel flow, the raw materials that are discharged has a small-size coke mixing ratio different from the small-size coke mixing ratio at the time when the small-size coke is charged into the main hopper. Consequently, controlling the small-size coke in a manner such that a preferred mixed state, such as that described above, is achieved is difficult.
(15) In accordance with aspects of the present invention, a bell-less charging device including a plurality of main hoppers and an auxiliary hopper at a furnace top portion is used. The auxiliary hopper has a smaller capacity than the main hoppers. Ore is charged into at least one of the plurality of main hoppers, and an amount of small-size coke for a plurality of charges is charged into the auxiliary hopper. An amount of the ore per charge is discharged in batches from the main hoppers, and an amount of the small-size coke per charge is discharged in batches from the auxiliary hopper. In such raw material charging, a ratio of mixing of the small-size coke can be varied by adjusting the amounts of the raw materials to be discharged from the main hopper and the auxiliary hopper, and, therefore, the small-size coke can be easily controlled in a manner such that a preferred mixed state is achieved.
(16) In accordance with aspects of the present invention, the term “small-size coke” refers to lumps of coke having small particle diameters, which are separated by sieving when lumps of coke to be used in a blast furnace are obtained from coke produced in a chamber-type coke furnace. Typically, the small-size coke has an average particle diameter (D50) of approximately 5 to 25 mm.
(17) In accordance with aspects of the present invention, the term “ore” refers to one or more of sintered ore, lump ore, pellets, and the like, which are iron sources. In a case where one or more auxiliary raw materials (e.g., limestone, silica stone, serpentinite, and the like), which are used mainly for the purpose of slag component adjustment, are mixed with the ore, the ore includes such auxiliary raw materials.
(18) In an operation of a blast furnace, raw materials are charged from a furnace top portion in a manner such that ore layers and coke layers are alternately formed within the blast furnace. In a case where small-size coke is to be mixed into an ore layer, an amount of ore to be used and an amount of small-size coke to be used to form one such ore layer are referred to as an amount of ore per charge and an amount of small-size coke per charge. The amount of ore per charge and the amount of small-size coke per charge are to be charged in batches. According to aspects of the present invention, methods for charging raw materials into a blast furnace are concerned with methods for charging ore and small-size coke that are charged on a per-batch basis.
(19) If the particle diameter of the raw materials that are charged on a per-batch basis varies, the gas flow within the furnace may become unstable. Accordingly, it is preferable to ensure that the downward flow of the raw materials within the auxiliary hopper is a mass flow, thereby enabling the raw materials charged in the auxiliary hopper to be discharged from the auxiliary hopper in the order in which the raw materials are charged. It is preferable that a diameter d2 of a hopper body of the auxiliary hopper satisfy d1<d2≤1.5×d1, where d1 is a diameter of an outlet of the auxiliary hopper, and d2 is the diameter of the hopper body. This configuration ensures that the downward flow of the raw materials within the auxiliary hopper is a mass flow.
(20)
(21)
(22) In the above-described bell-less charging devices 1a and 1b of the embodiments, the ore discharged from the main hoppers 2 and the small-size coke discharged from the auxiliary hopper 3 are charged into the blast furnace from a rotating chute 4 by way of a collecting hopper 5. In
(23) Details of methods for charging raw materials according to aspects of the present invention will now be described with reference to examples, in which the bell-less charging device 1a or 1b described above is used.
(24) Non Patent Literature 1 states that raw materials charged into a region defined by a blast furnace dimensionless radius of 0.12 or less reach a deadman (the blast furnace dimensionless radius is a dimensionless radius of a furnace determined assuming that a start point is a furnace center and designated as 0, and an end point is a furnace wall and designated as 1.0). Accordingly, when a raw material having a small particle diameter is charged into a region defined by a dimensionless radius of 0.12 or less, the fine raw material reaches the deadman and, consequently, may interfere with the gas permeability of a deadman portion. This phenomenon can be avoided by charging small-size coke to a region outside of the dimensionless radius of 0.12 (on the furnace wall side).
(25)
(26) A raw material deposition surface in a top of a blast furnace has a mortar-like shape such that a central portion of the furnace is located at a minimum height. A charge center position is defined as any of the positions on which the raw materials from the rotating chute 4 fall, on the sloping surface. A range in which the raw materials spread from the charge center position toward the furnace center and the furnace wall and are deposited is designated as the charged range. In a case where the rotating chute 4 is moved from the furnace center side toward the furnace wall side, the charging of raw materials begins from a lower position of the sloping surface having a mortar-like shape, and, therefore, spreading of the raw materials toward the furnace center is inhibited. Accordingly, the charged range is narrower in a case where raw materials are charged by moving the rotating chute 4 from the furnace center side toward the furnace wall side than in a case where raw materials are charged by moving the rotating chute 4 from the furnace wall side toward the furnace center side. In
(27)
(28) As can be seen from
(29) Based on the above results, a preferred region into which small-size coke is to be mixed is a region defined by a charge ratio of 0.15 or greater in a case where raw materials are sequentially charged from the furnace center side toward the furnace wall side and is a region defined by a charge ratio of 0.9 or less in a case where raw materials are sequentially charged from the furnace wall side toward the furnace center side.
(30) Accordingly, in accordance with aspects of the present invention, in a case where the ore charged in a main hopper 2 is discharged and then sequentially charged from the furnace center side toward the furnace wall side by using the rotating chute 4 (a first method for charging raw materials according to aspects of the present invention), only the ore is charged from the rotating chute 4 after the charging of the ore is started, at least until charging of 15 mass % of the ore is completed based on the total amount of the ore to be charged per batch; then, at a point in time, the charging of the small-size coke charged in the auxiliary hopper 3 is started; and then, the small-size coke is charged together with the ore from the rotating chute 4 for a time period. The time at which the discharging of the small-size coke is to be started may be the point in time at which the charging of 15 mass % of the ore is completed based on the total amount of the ore to be charged per batch or may be some point in time after a certain time period elapses after the charging of 15 mass % of the ore is completed based on the total amount of the ore to be charged per batch. The charging of the small-size coke may be performed until the charging of the total amount of the ore is completed or may be stopped before the charging of the total amount of the ore is completed. The time at which the charging of the small-size coke is to be started and the time period during which the charging of the small-size coke is to be performed may be determined in accordance with the small-size coke mixed state that is required.
(31) In a case where the ore charged in a main hopper 2 is discharged and then sequentially charged from the furnace wall side toward the furnace center side by using the rotating chute 4 (a second method for charging raw materials according with aspects of the present invention), the charging of the small-size coke charged in the auxiliary hopper 3 is started simultaneously with the start of the charging of the ore or at a point in time after the start of the charging, then the small-size coke is charged together with the ore from the rotating chute 4, and the charging of the small-size coke is stopped at least before the point in time at which charging of 90 mass % of the ore is completed based on the total amount of the ore to be charged per batch. In this case, too, the time at which the charging of the small-size coke is to be started and the time period during which the charging of the small-size coke is to be performed may be determined in accordance with the small-size coke mixed state that is required.
(32)
(33) In the case where raw material charging in which the rate of discharge of the small-size coke is increased in a region defined by specific dimensionless radii (region defined by specific charge ratios) such as that described above is to be performed, it is necessary to ensure that the charge center position is within the specified range (the region defined by specific dimensionless radii) as indicated by a heap a.sub.1 of charged raw materials illustrated in
(34)
(35) Accordingly, in accordance with aspects of the present invention, in a case where the ore charged in a main hopper 2 is discharged and then sequentially charged from the furnace center side toward the furnace wall side by using the rotating chute 4 (the first method for charging raw materials according to aspects of the present invention), it is preferable that, for a portion or all of the time period from the point in time at which charging of 27 mass % of the ore is completed to the point in time at which charging of 46 mass % of the ore is completed, based on the total amount of the ore to be charged per batch, the rate of discharge of the small-size coke to be discharged from the auxiliary hopper 3 be increased compared with the rate of discharge employed for a different time period. In the case where the ore is sequentially charged from the furnace center side toward the furnace wall side, the time period from the point in time at which charging of 27 mass % of the ore is completed to the point in time at which charging of 46 mass % of the ore is completed, based on the total amount of the ore to be charged per batch, corresponds to a region in which the thickness of the deposited ore is large within the furnace, and, therefore, it is expected that mixing a large amount of small-size coke into this region promotes the reduction reaction of ore. In this case, it is preferable that the rate of discharge of the small-size coke be 1.5 to 2 times the rate of discharge employed for a different time period. When the rate of discharge of the small-size coke is 1.5 times or greater the rate of discharge employed for a different time period, the reduction reaction of ore is noticeably promoted. On the other hand, it is not preferable to increase the rate of discharge of the small-size coke to greater than 2 times the rate of discharge employed for a different time period because in such a case, the progressing rate of the reduction reaction of ore saturates.
(36) In a case where the ore charged in a main hopper 2 is discharged and then sequentially charged from the furnace wall side toward the furnace center side by using the rotating chute 4 (the second method for charging raw materials according to aspects of the present invention), it is preferable that, for a portion or all of the time period from the point in time at which charging of 54 mass % of the ore is completed to the point in time at which charging of 83 mass % of the ore is completed, based on the total amount of the ore to be charged per batch, the rate of discharge of the small-size coke to be discharged from the auxiliary hopper 3 be increased compared with the rate of discharge employed for a different time period. In the case where the ore is sequentially charged from the furnace wall side toward the furnace center side, the time period from the point in time at which charging of 54 mass % of the ore is completed to the point in time at which charging of 83 mass % of the ore is completed, based on the total amount of the ore to be charged per batch, corresponds to a region in which the thickness of the deposited ore is large within the furnace, and, therefore, it is expected that mixing a large amount of small-size coke into this region promotes the reduction reaction of ore. In this case, too, for a reason similar to that described above, it is preferable that the rate of discharge of the small-size coke be 1.5 to 2 times the rate of discharge employed for a different time period.
(37) In accordance with aspects of the present invention, it is preferable that a gas composition distribution in a furnace radial direction within the blast furnace be measured at the furnace top portion or at a shaft upper portion to determine a distribution of a CO gas utilization ratio associated with the furnace radial direction, and, for a region in the furnace radial direction in which the CO gas utilization ratio is greater than or equal to an average value of the CO gas utilization ratio associated with the furnace radial direction, the rate of discharge of the small-size coke to be discharged from the auxiliary hopper 3 be increased compared with a rate of discharge employed for a different region in the furnace radial direction. A region in which the CO gas utilization ratio associated with the furnace radial direction is high corresponds to a region that has a large ore layer thickness and, therefore, has a high ore reduction load. Accordingly, it is expected that mixing a large amount of small-size coke into such a region promotes the reduction reaction of ore. In this case, too, for a reason similar to that described above, it is preferable that the rate of discharge of the small-size coke be set to be 1.5 to 2 times the rate of discharge employed for a different region in the furnace radial direction.
(38) The CO gas utilization ratio is defined by equation (1) below, according to the composition of the gas within the furnace.
CO gas utilization ratio=100×(volume percentage of CO.sub.2)/[(volume percentage of CO)+(volume percentage of CO.sub.2)] (1)
(39) At the blast furnace top portion or the shaft upper portion, a furnace top gas probe or a shaft gas probe is inserted in the furnace radial direction, and the gas within the furnace is sampled in 5 or greater and 10 or less locations in the furnace radial direction. The samples are then subjected to gas analysis to determine the compositions of the gas of the locations in the furnace radial direction. From the compositions of the gas of the locations in the furnace radial direction, the gas utilization ratio of each of the locations in the furnace radial direction and a distribution of the CO gas utilization ratio associated with the furnace radial direction can be determined. The average value of the CO gas utilization ratio is an arithmetic mean of the CO gas utilization ratios of all the measurement locations.
(40) In a case where the bell-less charging device 1a of
(41) In accordance with aspects of the present invention, an amount of small-size coke for a plurality of charges is charged into the auxiliary hopper 3, and, from the auxiliary hopper 3, an amount of the small-size coke per charge is discharged in batches. Accordingly, the pressure adjustment time associated with the discharging of raw materials can be reduced, and as a result, the production volume of a blast furnace can be maintained even in a case where a small-amount raw material is to be charged into the blast furnace by using a discrete auxiliary hopper.
EXAMPLES
(42) A charging test for ore and coke was conducted by using a 1/20-scale model testing device.
(43)
(44) With the model testing device, a charge test was conducted in association with a case in which raw materials are sequentially charged from the furnace center side toward the furnace wall side by using a rotating chute, and the ratio of the small-size coke in the discharged raw materials (mixed coke rate) was measured in the manner described above.
(45) As can be seen from
(46) In contrast, in Invention Examples 1 to 3, the small-size coke was discharged when or after the charge ratio reached 0.15, and in addition, the amount of the small-size coke discharged from the auxiliary hopper could be controlled; thus, in Invention Example 1, the mixed coke rate was substantially uniform throughout the whole time period during which the small-size coke was discharged. In Invention Examples 2 and 3, the mixed coke rate was increased particularly in an intermediate period of the discharging, which was associated with a large ore layer thickness.
(47) A charge test, such as that described above, was conducted in association with a case in which raw materials are sequentially charged from the furnace wall side toward the furnace center side by using a rotating chute, and the ratio of the small-size coke in the discharged raw materials (mixed coke rate) was measured in the manner described above.
(48) As can be seen from
(49) Table 1 summarizes the results of an evaluation of the operation conditions of Examples and Comparative Examples, which was conducted by using a blast furnace operation prediction model. As shown in Table 1, Invention Examples 1 to 5 had a lower reduction agent rate and a lower pressure drop of the burden layer than Comparative Examples 1 to 3. These results demonstrate that charging ore and small-size coke as in any of Invention Examples 1 to 5 results in improved mixing characteristics of small-size coke, which in turn improves gas permeability and reducibility and, consequently, lowers the reduction agent rate of a blast furnace.
(50) All of Invention Examples 1 to 3, in which raw materials were sequentially charged from the furnace center side toward the furnace wall side by using a rotating chute, had improved gas permeability and reducibility compared with Comparative Example 1. In particular, the gas permeability and reducibility improving effect was pronounced in Invention Examples 2 and 3. In these examples, a large amount of small-size coke was charged into a region defined by charge ratios of approximately 0.3 to 0.7, which was associated with a large ore layer thickness, and an amount of the small-size coke was maintained also in a region defined by a charge ratio of approximately 1.0, in which the raw materials were charged into a portion near the blast furnace periphery. In particular, the reduction agent rate was lowest in Invention Example 3, in which the greatest amount of small-size coke was charged into a region defined by charge ratios of 0.27 to 0.46, in which the ore layer thickness was large.
(51) Both of Invention Examples 4 and 5, in which raw materials were sequentially charged from the furnace wall side toward the furnace center side by using a rotating chute, had improved gas permeability and reducibility compared with Comparative Examples 2 and 3. It is seen that compared with Comparative Example 2, in which it was difficult to drastically change the mixed coke rate, in Invention Examples 4 and 5, gas permeability and reducibility were improved, which was achieved by mixing small-size coke into a region between the furnace wall side and a region defined by a charge ratio of 0.9 near the furnace center. In particular, the reduction agent rate was significantly low in Invention Example 5, in which the amount of small-size coke was increased in a region defined by charge ratios of 0.54 to 0.83, in which the ore layer thickness was large. On the other hand, in Comparative Example 3, in which small-size coke was mixed consistently uniformly from the furnace wall side to the furnace center side, some small-size coke reached a blast furnace axial central region, and as a result, some small-size coke remained within the furnace, and, therefore, no gas permeability improving effect was observed.
(52) The results described above confirm that charging small-size coke into an appropriate region within a furnace with high precision results in improved gas permeability and reducibility within the blast furnace, which, consequently, lowers the reduction agent rate of the blast furnace.
(53) TABLE-US-00001 TABLE 1 Invention Invention Invention Invention Invention Comparative Comparative Comparative Example 1 Example 2 Example 3 Example 4 Example 5 Example 1 Example 2 Example 3 Tapping ratio 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 (t/m.sup.3/day) Reduction agent 499 496 495 501 497 506 507 507 rate (kg/t) Coke rate 351 348 347 353 349 358 359 359 (kg/t) Pulverized coal 148 148 148 148 148 148 148 148 rate (kg/t) Gas utilization 49.9 50.3 50.5 49.5 50.3 48.7 48.6 48.6 ratio (%) Pressure drop of 20.8 20.6 20.6 21.8 20.6 25.0 26.2 25.5 burden layer (kPa/(Nm.sup.3/min))
REFERENCE SIGNS LIST
(54) 1a Bell-less charging device 1b Bell-less charging device 2 Main hopper 3 Auxiliary hopper 3a Hopper body 3b Outlet 4 Rotating chute 5 Collecting hopper 6 Blast furnace body 7 Charging belt conveyor