Abstract
A method for determining individual fuel consumption characteristics of different generator units of an electricity generating assembly, includes an acquisition of operation data including, for several acquisition times, a measurement of a total fuel flow rate consumed by the generating assembly, and measurements of the respective load rates of the different generator units, and a determination of the individual fuel consumption characteristics of these different generator units, from these acquired operation data.
Claims
1. A method for determining individual fuel consumption characteristics of different generator units of an electricity generating assembly, the individual consumption characteristics associated with each generator unit being representative of a specific fuel consumption of the generator unit considered, for different load rates of the generator unit, the different generator units of said generating assembly being supplied with fuel by a same fuel source provided with a flow meter which delivers a measurement of a total fuel flow rate consumed by all of the generator units of said generating assembly, each generator unit being provided with a sensor which delivers a measurement of a load rate of the considered generator unit, the method comprising the following steps: a) acquiring operation data which, for different acquisition times distributed over a given acquisition period, gather: the measurement of the total fuel flow rate consumed, at the considered acquisition time, and for each generator unit of the generating assembly, the measurement of the load rate of the generator unit considered, at the acquisition time considered, and b) determining the individual consumption characteristics of the different generator units of the generating assembly, by a procedure for minimising a cumulative difference that takes into account a set of instantaneous differences associated respectively with the different acquisition times, each instantaneous difference being a difference, for the acquisition time considered, between: on one hand, the measurement of the total fuel flow rate, and on the other hand, an estimation of the total fuel flow rate consumed by said electricity generating assembly, the estimation of the total fuel flow rate being equal to a sum of estimated individual flow rates, associated respectively with the different generator units of the generating assembly, each estimated individual flow rate being determined on the basis: of the measurement of the load rate of the generator unit considered, at the acquisition time considered, and of the individual fuel consumption characteristics of the generator unit considered, said acquisition period comprising several distinct operating periods, a total electric power generated by the generating assembly being distributed between the generator units of the generating assembly in different manners during these different operating periods.
2. The method according to claim 1, wherein the individual consumption characteristics of the different generator units of said generating assembly determined during said minimisation procedure are determined according to the following constraint: for each generator unit, the specific fuel consumption of the generator unit is decreasing as a function of the load rate of the generator unit, over at least one interval which extends from a first load rate threshold up to a second load rate threshold.
3. The method according to claim 2, wherein the first load rate threshold is less than or equal to 10%, and wherein the second load rate threshold is comprised between 70% and 95%.
4. The method according to claim 1, wherein the cumulative difference is equal or proportional to the sum of said instantaneous differences.
5. The method according to claim 1, wherein each estimated individual flow rate is determined by: determining a specific fuel consumption corresponding to the measurement of the load rate of the generator unit considered, at the acquisition time considered, by interpolation, from the individual consumption characteristics of the generator unit considered, then by multiplying said specific fuel consumption by said measurement of the load rate and by a maximum rated power of the generator unit considered.
6. The method according to claim 1, wherein the different operating periods of said acquisition period are at least as numerous as the generator units of the generating assembly.
7. The method according to claim 1, wherein said acquisition period lasts for one day at least.
8. The method according to claim 1, wherein said acquisition period lasts for several days and wherein at least some of said operating periods each last for one day or more.
9. The method according to claim 1, wherein, for each generator unit of said electricity generating assembly: during at least one of said operating periods, the generator unit considered operates with a load rate less than 50%, and during another of said operating periods, the generator unit considered operates with a load rate greater than 70%.
10. Method for driving an electricity generating assembly which comprises several generator units, the method comprising: determining individual fuel consumption characteristics, for the different generator units of the electricity generating assembly, according to the method for determining according to claim 1, and driving said generator units so that they operate with respective load rates that are determined based on the individual fuel consumption characteristics previously determined.
11. Method for detecting a need for maintenance of one or more generator units of an electricity generating assembly comprising several generator units, the method comprising: 1) determining individual fuel consumption characteristics for the different generator units of the electricity generating assembly, according to the method for determining of claim 1, and 2) identifying, among said generator units one or more generator units for which a difference between: the individual consumption characteristics of the generator unit considered, determined at step 1), and individual reference characteristics is greater than a given threshold, said generator unit or units being then identified as requiring maintenance.
12. The method for detecting a need for maintenance according to claim 11, wherein the individual reference characteristics are equal, for each generator unit, to: an average of the individual consumption characteristics having been determined, at step 1), for the other generator units of said electricity generating assembly, or to an average of the individual consumption characteristics having been determined, at step 1), for all of the generator units of said electricity generating assembly, or to individual consumption characteristics of the generator unit considered, provided by a manufacturer of the generator unit, or to individual consumption characteristics of the generator unit considered, which have been determined just after having installed this generator unit or just after an operation of maintenance of this generator unit, or instead during a preceding temporal period that is not separated from said acquisition period by a maintenance operation, and which have been saved to next serve as individual consumption reference characteristics for this generator unit.
13. A device for monitoring an electricity generating assembly, the generating assembly comprising several generator units being supplied with fuel by a same fuel source provided with a flow meter which delivers a measurement of a total fuel flow rate consumed by all of the generator units of said generating assembly, each generator unit being provided with a sensor which delivers a measurement of a load rate of the generator unit considered, the device for monitoring comprising at least one acquisition module, a memory and a calculation module comprising a processor, the device for monitoring being programmed to determine individual fuel consumption characteristics of the different generator units of the generating assembly, the individual consumption characteristics, associated with each generator unit being representative of a specific fuel consumption of the generator unit considered, for different load rates of the generator unit, the monitoring device being programmed to determine said individual characteristics by executing the following steps: a) acquiring, by the acquisition module, operation data which, for different acquisition times distributed over a given acquisition period, gather: the measurement of the total fuel flow rate consumed, at the considered acquisition time, and for each generator unit of said generating assembly, the measurement of the load rate of the generator unit considered, at the acquisition time considered, and saving the acquired operation data in said memory, and b) determining, by the calculation module, the individual consumption characteristics of the different generator units of said generating assembly, by a procedure for minimising a cumulative difference that takes into account a set of instantaneous differences associated respectively with the different acquisition times, each instantaneous difference being a difference, for the acquisition time considered, between: on one hand, the measurement of the total fuel flow rate, and on the other hand, an estimation of the total fuel flow rate consumed by said electricity generating assembly, the estimation of the total fuel flow rate being equal to a sum of estimated individual flow rates, associated respectively with the different generator units of the electricity generating assembly, each estimated individual flow rate being determined on the basis: of the measurement of the load rate of the generator unit considered, at the acquisition time considered, and of the individual fuel consumption characteristics of the generator unit considered, said acquisition period comprising several distinct operating periods, a total electric power generated by the generating assembly being distributed between the generator units of the generating assembly in different manner during these different operating periods.
Description
BRIEF DESCRIPTION OF THE FIGURES
(1) The figures are described for indicative purposes and in no way limit the invention.
(2)
(3)
(4)
(5)
DETAILED DESCRIPTION
(6)
(7) Generator unit is here taken to mean a device comprising an internal combustion engine, supplied with fuel and which actuates an alternator or an electrical generator in such a way as to generate an electric power P.sub.1, P.sub.i, P.sub.n.
(8) The different generator units G.sub.1, . . . , G.sub.i, . . . , G.sub.n of the generating assembly 10 are supplied with fuel by a same fuel source 1 (source which is constituted of one or more fuel tanks). The fuel source 1 is provided with a measurement means 2, realised in the form of a flow meter, and which delivers a measurement of a total flow rate of fuel D.sub.mes,k consumed, at a given acquisition time t.sub.k, by all of the generator units G.sub.1, . . . , G.sub.i, . . . , G.sub.n of the generating assembly 10.
(9) Each generator unit G.sub.i is furthermore provided with a sensor C which delivers a measurement, LR.sub.mes,i,k, of a load rate of the generator unit considered, at the acquisition time t.sub.k.
(10) As indicated in the foreword, the load rate of any one of the generator units of the generating assembly is equal to the electric power P.sub.i,k generated by this generator unit, G.sub.i, at the time t.sub.k considered, divided by its maximum rated power P.sub.nom,i.
(11) The maximum rated power P.sub.nom,i of the generator unit G.sub.i is the maximum electric power that it can generate, such as specified by the manufacturer or the distributor of the generator unit. It is the maximum electric power that the generator unit can generate without premature wear or deterioration, and without heating up beyond the maximum operating temperature for which it has been designed.
(12) The measurement LR.sub.mes,i,k of the load rate of the generator unit G.sub.i is representative of this load rate. It may be, as here, a value, expressed in the form of a percentage, directly equal to the load rate in question, at the considered time t.sub.k. In an alternative, this measurement could however be equal to the electric power P.sub.i,k generated by the generator unit G.sub.i at the considered time t.sub.k (since this power is, to a multiplication factor or so, equal to the load rate in question).
(13) The generating assembly 10 further comprises a management unit 3 which controls the different generator units G.sub.n. The management unit 3 may control the shutting down and the starting up of each generator unit. It may further control each unit to operate with a given load rate. The management unit may be realised in the form of an electronic system which notably comprises a processor, a memory and a communication module to send instructions to the generator units.
(14) The measurements delivered by the flow meter 2 and by the sensors C are transmitted to the monitoring device 20. This monitoring device 20 may comprise: an acquisition module 21, configured to acquire the measurements in question in order to gather together the operation data relative to the operation of the generating assembly, a memory 22 where, among others, these operation data are saved, and a calculation module 23 comprising at least one processor.
(15) The monitoring device 20, which enables the monitoring of the operation of the generating assembly 10, may, as here, be integrated in this generating assembly. In an alternative, the monitoring device could however be delocalised, the monitoring device then being remote (by several kilometres) from the generating assembly, the aforementioned measurements then being transmitted to the monitoring device through a telecommunications network such as the Internet. In a further alternative, the monitoring device could be partially delocalised, the calculation module being delocalised, but not the other elements of this device, for example.
(16) The monitoring device 20 is programmed to determine individual fuel consumption characteristics of the different generator units G.sub.1, . . . , G.sub.i, . . . , G.sub.n of the generating assembly 10, while executing the determination method described in detail below.
(17) And the management unit 3 is here configured to manage the different generator units G.sub.1, . . . , G.sub.i, . . . , G.sub.n of the generating assembly 10 while taking account of these individual fuel consumption characteristics.
(18) The monitoring device 20 may for example be programmed, each time that it determines new individual consumption characteristics, to transmit these updated characteristics to the management device 3 (so that the management device takes account of them while managing the generator units). The monitoring device could also be programmed, each time that it determines individual consumption characteristics, to save these updated characteristics in a remotely accessible memory (for example via the Internet), this memory playing the role of data server, which the management device 3 regularly interrogates.
(19) Whatever the case, the individual fuel consumption characteristics of the different generator units G.sub.1, . . . , G.sub.i, . . . , G.sub.n of the generating assembly 10 are determined, by the monitoring device 20, on the basis of operation data of the electricity generating assembly 10, in accordance with the determination method which will now be described.
(20) This determination method comprises the following steps (see
(21) Each estimated individual flow rate d.sub.sim,i,k being determined on the basis: of the measurement of the load rate LR.sub.mes,i,k of the considered generator unit G.sub.i, at the considered acquisition time t.sub.k, and of individual fuel consumption characteristics SFC.sub.i,1, . . . , SFC.sub.i,j, . . . , SFC.sub.i,m of the considered generator unit G.sub.i, which are estimated characteristics, the values of which are adjusted to minimise the cumulative difference in question.
(22) As explained in the section entitled “Summary”, for each generator unit of the generating assembly, the individual consumption characteristics of the considered generator unit G.sub.i, . . . , SFC.sub.i,j, . . . , SFC.sub.i,m, are representative of the specific fuel consumption of this generator unit G.sub.i, and for different load rates LR.sub.1, . . . , LR.sub.j, . . . , LR.sub.m.
(23) Here, for each generator unit, the individual consumption characteristics SFC.sub.i,1, . . . , SFC.sub.i,j, . . . , SFC.sub.i,m are directly equal to the specific fuel consumption values of this generator unit G.sub.i corresponding respectively to the different load rates LR.sub.1, . . . , LR.sub.j, . . . , LR.sub.m.
(24) For each generator unit, the individual characteristics in question thus group together several pairs of values (LR.sub.j, SFC.sub.i,j), each pair grouping together a load rate LR.sub.j, value and a corresponding specific fuel consumption SFC.sub.i,j value which is equal to the specific fuel consumption of the generator unit G.sub.i when this generator unit operates with a load rate having this value LR.sub.j.
(25) Each of these pairs of values is marked by an integer index j comprised between 1 and m, where m is the number of different load rate values taken into account to characterise the energy consumption of the generator unit. Here, for example, m is equal to 25 and the 25 load rate LR.sub.1, . . . , LR.sub.j, . . . , LR.sub.m values are spread out between 0% (LR.sub.1=0%) and 87% (LR.sub.m=87%). The upper value LR.sub.m of the load rates for which the individual consumption characteristics SFC.sub.i,1, . . . , SFC.sub.i,j, . . . , SFC.sub.i,m is determined is equal to 87%, here, because it is the largest load rate value measured over the course of the acquisition period. But this upper value LR.sub.m could be greater, or smaller, depending on the load rate values for which the generator units have operated, during the acquisition period (it could be equal to 90%, for example, if one at least of the generator units actually operates with such a high load rate, during the acquisition period).
(26) Step a)
(27) The acquisition period, throughout which the total flow rate D.sub.mes,k and load rate LR.sub.mes,i,k measurements are acquired, comprises several distinct operating periods. The total electric power P.sub.tot,k generated by the generating assembly 10 is spread out in different ways between the generator units G.sub.1, . . . , G.sub.i, . . . , G.sub.n of the generating assembly 10 over the course of these different operating periods. Put another way, the generator units of the generating assembly operate with load rates that vary with respect to each other, from one operating period to the other.
(28) As explained in the section entitled “Summary”, varying the manner in which the total load is spread out, from one operating period to the other, favours a precise determination of the individual fuel consumption characteristics of the different generator units.
(29) Here, the acquisition period comprises at least as many different operating periods as generator units. And, for each generator unit: over the course of one at least of said operating periods, the generator unit considered operates with a load rate less than 50% (the generator unit could even be shut down during this operating period), whereas over the course of another of said operating periods, the considered generator unit operates with a load rate greater than 70%.
(30) As an example, for an electricity generating assembly comprising three different generator units, the acquisition period could comprise three distinct operating periods, over the course of which a first, a second, then respectively a third of these generator units is shut down whereas the two others generate the electric power to provide. As already indicated, this type of operation, with an alternation between generator units, favours a precise determination of the individual consumption characteristics of the different generator units of the generating assembly.
(31) The acquisition period may for example last for one day, or more. This is interesting because the total electric power that such an electricity generating assembly has to supply generally varies quite markedly over the course of one day. Acquiring measurements over one day or more thus makes it possible to have available operation data corresponding to quite varied load rate values, which, here again, favours a precise determination of the individual consumption characteristics of the different generator units.
(32) It may even be provided that the acquisition duration lasts for several days, and that the different operating periods each last for one day, or more.
(33) On the other hand, it is desirable that the acquisition duration does not last for more than two months. Indeed, if the acquisition period is too long, one or more of the generator units is liable to undergo ageing over the course of the acquisition period, making the individual characteristics obtained more difficult to interpret.
(34) An acquisition period of which the duration is comprised between one week and 8 weeks is thus well suited.
(35) As for the time step Δt, it may for example be comprised between 1 and 30 minutes, or, better, between 3 and 15 minutes. This time step Δt is equal to the duration that separates two successive acquisition times t.sub.k and t.sub.k+1 (Δt=t.sub.k+1−t.sub.k). The acquisition period comprises a total number of acquisition times t.sub.k which is noted p. The integer index k that marks each acquisition time t.sub.k is thus comprised between 1 and p, here.
(36) As an example, for the results presented below with reference to
(37) Step b)
(38) Here, the cumulative difference Obj, which is minimised to determine the individual consumption characteristics of the different generator units, is equal to the sum of said instantaneous differences EC.sub.k, as indicated by the formula F1 below:
(39)
(40) In an alternative, the cumulative difference Obj could take account of these different instantaneous differences EC.sub.k in another manner, for example in the form of a square root of a sum of the squares of these instantaneous differences. But calculating this cumulative difference as the sum of the instantaneous differences is nevertheless simpler and thus facilitates the minimisation procedure implemented at step b) (especially since the integer p has a relatively high value, typically greater than 1000).
(41) Furthermore, each individual difference EC.sub.k is equal, here, to the absolute value of the difference, between, on the one hand, the measurement of the total flow rate of fuel D.sub.mes,k consumed by the electricity generating assembly, at the considered acquisition time t.sub.k, and, on the other hand, the estimation of the aforementioned total fuel flow rate D.sub.sim,k, i.e.:
EC.sub.k=|D.sub.mes,k−D.sub.sim,k| (F2).
(42) In an alternative, the instantaneous difference EC.sub.k could nevertheless be calculated in another manner, as a function of the difference D.sub.mes,k−D.sub.sim,k (this difference being able for example to be equal to the square, or to the cube of the absolute value of this difference).
(43) As already indicated, the estimation of the total flow rate D.sub.sim,k is equal to the sum of the estimated individual flow rates d.sub.sim,i,k, associated respectively with the different generator units G.sub.i of the generating assembly 10:
(44)
(45) And, here, each estimated individual flow rate d.sub.sim,i,k is determined by: determining a specific fuel consumption SFC_interpol corresponding to the measurement of the load rate LR.sub.mes,i,k of the considered generator unit G.sub.i at the considered acquisition time t.sub.k, by interpolation, from the individual consumption characteristics SFC.sub.i,1, . . . , SFC.sub.i,j, . . . , SFC.sub.i,m of the considered generator unit G.sub.i, then by multiplying said specific fuel consumption SFC_interpol by said measurement of the load rate LR.sub.mes,i,k, and by the maximum rated power P.sub.nom,i of the considered generator unit G.sub.i.
(46) Here, each estimated individual flow rate d.sub.sim,i,k is thus determined in accordance with the following formula F4:
d.sub.sim,i,k=P.sub.nom,i×LR.sub.mes,i,k×SFC_interpol(SFC.sub.i,1, . . . ,SFC.sub.i,m;LR.sub.mes,i,k) (F4).
(47) The interpolation in question makes it possible to gain precision, during the determination of the individual consumption characteristics. Indeed, the measurement of the load rate LR.sub.mes,i,k, acquired at the time t.sub.k, is not necessarily equal to one of the discrete load rate values, LR.sub.1, . . . , LR.sub.j, . . . , LR.sub.m associated with the specific consumption values to determine SFC.sub.i,1, . . . , SFC.sub.i,j, . . . , SFC.sub.i,m.
(48) The interpolation in question is for example a linear interpolation. In this case, when the load rate LR.sub.mes,i,k measurement is comprised between two successive load rate LR.sub.j′ and LR.sub.j′+1 values, the specific fuel consumption SFC_interpol may then be determined in accordance with the following formula F5:
(49)
(50) The individual consumption characteristics SFC.sub.i,1, . . . , SFC.sub.i,j, . . . , SFC.sub.n,m of the different generator units G.sub.1, . . . , G.sub.i, . . . , G.sub.n of the generating assembly 10 are determined, over the course of the aforementioned minimisation procedure, while respecting the following constraint: for each generator unit G.sub.i, the specific fuel consumption of the generator unit is decreasing as a function of the load rate of the generator unit, over at least one interval which extends from a first load rate threshold LR.sub.T1 up to a second load rate threshold LR.sub.T2.
(51) This constraint, noted Cstr, is translated by the following formula F6:
Cstr:{SFC.sub.i,j≥SFC.sub.i,j+1Λjϵ[j1:j2],Λiϵ[1:n]} (F6)
(52) where the integers j1 and j2 correspond respectively to the first and to the second load rate thresholds LR.sub.T1 and LR.sub.T2: LR.sub.j1=LR.sub.T1 and LR.sub.j2=LR.sub.j2=LR.sub.T2.
(53) The interest of taking into account this constraint, during the procedure for minimising the cumulative difference Obj, has been described in detail in the section relative to “Summary”.
(54) Here, the first and second load rate thresholds LR.sub.T1 and LR.sub.T2, which define the range over which the specific fuel consumption of the generator unit decreases, depend on the considered generators and may for example be chosen as follows: LR.sub.T1=0% (i.e. j1=1), and LR.sub.T2=87% (i.e. j2=m). Indeed, for the type of generator units of this electricity generating assembly used as example, a decrease in the specific fuel consumption is expected, as a function of the load rate, over this entire load rate range (and, next, a rise in the specific fuel consumption, over the load rate range 87%-100%, a range which is generally avoided).
(55) The aforementioned minimisation procedure thus consists, here, in searching for the individual consumption characteristics SFC.sub.i,1, . . . , SFC.sub.i,j, . . . , SFC.sub.n,m which, for the acquired operation data, make it possible to minimise, or at least to reduce, the cumulative difference Obj, while respecting the constraint Cstr.
(56) The minimisation procedure may be carried out by any technique for minimising under constraint (in this instance under linear inequality constraint) a non-linear function of several variables known to those skilled in the art (the variables in question being the individual consumption characteristics of the different generator units). As an example, this minimisation procedure may be implemented using a “fmincon” function of the “Matlab” script language developed by the “MathWorks®” company.
(57) The individual consumption characteristics have given values, initially, before launching the minimisation procedure. In other words, this minimisation starts from given initial values. These initial values may correspond for example to values supplied by a manufacturer of the generator units. They may also be equal to the last known values for these individual characteristics, obtained during a prior execution of the determination method and saved in a memory of the monitoring device 20.
(58) It will be noted that the minimisation procedure in question may lead to a cumulative difference Obj value which is not necessarily an absolute minimum, or even necessary a local minimum, but which is in any case smaller than that which would be obtained without adjustment of the individual consumption characteristics of the generator units (that is to say on the basis of the initial values of these characteristics, without executing step b). Optionally, the minimisation procedure in question could stop when the cumulative difference Obj becomes less than a threshold value, this threshold value being for example equal to 1% of the sum, from k=1 to p, of the flow rate D.sub.mes,k measurements (the individual consumption characteristics obtained at this stage then being considered as reliable, even if the value of the cumulative difference is not strictly minimal).
(59)
(60) In
(61) Each of these curves gathers together, for the considered generator unit, all of the specific consumption SFC.sub.i,1, . . . , SFC.sub.i,m values obtained at the end of the determination method. As an example, the first point of the curve SFC.sub.2 is a coordinates point (LR.sub.1; SFC.sub.2,1), the second point of this curve is a coordinates point (LR.sub.2, SFC.sub.2,2), and so on (see
(62) In
(63) In this example, the 3 generator units G.sub.1, G.sub.2 and G.sub.3 are of the same model, have been installed at the same date, and have operated, since their installation, for comparable total durations.
(64) It is however observed that their individual fuel consumption characteristics, here their specific consumption curves SFC.sub.1, SFC.sub.2 and SFC.sub.3, are indeed different from each other.
(65) The first generator unit G.sub.1 has in fact a specific fuel consumption considerably greater than the two other generator units G.sub.2 and G.sub.3. For example, for a load rate of 50%, it is observed that the first generator unit G.sub.1 has a specific fuel consumption of 260 g/kWh whereas the two other units have specific consumptions of 230 g/kWh and 224 g/kWh respectively.
(66) This example illustrates one of the interests that there is in thus carrying out a type of monitoring, in place, of the specific fuel consumptions of the generator units of the generating assembly. Indeed, once obtained, the individual consumption characteristics of these units make it possible, as here, to detect that one of the generator units (here the first unit G.sub.1) has an abnormally high specific consumption, which notably shows that a maintenance operation could be desirable for this generator unit.
(67) For this example, after minimisation (minimisation at the end of which the curves SFC.sub.1, SFC.sub.2, SFC.sub.3 have been obtained), the value obtained for the cumulative difference Obj is less than 0.1%. For this example, the acquisition period lasts for 19 days, as indicated above. And over the course of this same acquisition period, for short durations, less than around 2 hours, an average difference less than 1% has been obtained (the individual characteristics in question remaining equal to those obtained by minimising the overall cumulative difference in question). Moreover, once these specific fuel consumptions SFC.sub.1, SFC.sub.2, SFC.sub.3 have been determined (by minimisation) and fixed, it turns out that the cumulative difference between the measurement of the total flow rate and the estimation of this flow rate, remains less than around 2% for a period, later, of around 19 days, whereas the specific consumptions in question then conserve fixed values, which shows that the specific consumptions thus obtained have a predictive value, and thus indeed correspond to the actual (real) specific consumptions of the generator units, such as they could be measured by removing each set from the generating assembly to carry out consumption tests.
(68) It will be noted that to determine the individual consumption characteristics of the generator units with good precision it has been necessary to consider that these generator units could have different individual characteristics, even though they are generator units of the same model and which have been installed at the same date, which appears particularly surprising a priori.
(69) It will furthermore be noted that the individual consumption characteristics of the different generator units are here considered as independent of each other (those associated with one generator unit are independent of those associated with another generator unit), during the minimisation procedure, and this is so even if the generator units in question are of a same model, and have been installed at the same date. In other words, there is a different set of individual characteristics for each generator unit of the generating assembly, and during the minimisation procedure, the number of sets of different individual characteristics, which are adjusted during the minimisation procedure, is equal to the number n of generator units of the generating assembly 10.
(70) The monitoring device 20 is furthermore programmed to execute the method for detecting a need for maintenance described below.
(71) In the course of this method, the monitoring device 20 executes the following steps (
(72) In practice, the threshold in question may for example be equal to 5%, in relative value, or to 10% or instead 20%. In practice, a detection based on a threshold of 10% proves to be both sensitive and reliable.
(73) The difference between the individual consumption characteristics of the generator unit G.sub.i considered, and its individual reference characteristics SFC.sub.ref,i, may, like here, be a cumulated difference, obtained by summation (by integration) over all of the considered load rates.
(74) The individual reference characteristics SFC.sub.ref,i of the generator unit G.sub.i may be equal to an average of the individual consumption characteristics which were determined previously, at step 1), for the other generator units of the electricity generating assembly (that is to say for the units other than the unit G.sub.i, for which it is sought to determine if it has to undergo a maintenance operation).
(75) Determining the individual reference characteristics SFC.sub.ref,i in this way would lead for example, for the situation corresponding to the example described above with reference to
(76) In an alternative, the individual reference characteristics SFC.sub.ref,i in question could, for each generator unit G.sub.i, be equal to an average of the individual consumption characteristics which were determined previously, at step 1), for all of the generator units G.sub.1, . . . , G.sub.i, . . . , G.sub.n of the generating assembly 10 (in which case the individual reference characteristics SFC.sub.ref,i are the same whatever the generator unit).
(77) The individual reference characteristics SFC.sub.ref,i could also be characteristics supplied by a manufacturer of the generator unit.
(78) For each generator unit of the generating assembly, the individual reference characteristics SFC.sub.ref,i, could also be equal to the individual consumption characteristics of the generator unit G.sub.i considered that have been determined, for example by means of the determination method described above, just after having installed the generator unit G.sub.i considered, or just after an operation of maintenance of this generator unit, or instead during a preceding temporal period not separated from the acquisition period by a maintenance operation (which would make it possible to detect a drift of the performances of the generator unit), and that have been saved (for example in the memory 22 of the monitoring device) to next serve as reference individual characteristics for this generator unit.
(79) “Just after” is taken to mean more precisely within a maximum time limit of 3 weeks after the installation or the maintenance of the generator unit.
(80) Furthermore, as indicated above, the management device 3 is programmed to manage the different generator units G.sub.1, . . . , G.sub.i, . . . , G.sub.n while taking account of the individual fuel consumption characteristics of these different generator units, determined previously thanks to the determination method which has been described above.
(81) This management is carried out more particularly in such a way that the generator units operate with respective load rates that are determined on the basis of the individual fuel consumption characteristics of these generator units (determined beforehand).
(82) It is possible for example to provide to determine, at each time, the respective load rates at which the different generator units are to be managed, in such a way as to supply a total power demand while minimising the total fuel consumption of the generating assembly 10. In order to be able to minimise this total consumption, this determination is based on the individual consumption of these different generator units (characteristics obtained previously, thanks to the determination method described above). This determination may for example be carried out in accordance with the method described in the patent application EP19207140, not yet published on the date of filing of the present patent application, and belonging to the applicant.
(83) In an alternative, or as a complement, the management device 3 could be programmed to maintain shut down as far as possible any generator unit for which a need for maintenance has been detected (thanks to the detection method described above). In this case, as long as the total electric power demand may be supplied by the other generator units (i.e.: those which do not require maintenance), the generator unit(s) requiring maintenance remain shut down.