Barrier testing method
09835023 · 2017-12-05
Assignee
Inventors
Cpc classification
E21B43/103
FIXED CONSTRUCTIONS
E21B47/117
FIXED CONSTRUCTIONS
E21B47/007
FIXED CONSTRUCTIONS
E21B43/10
FIXED CONSTRUCTIONS
International classification
E21B43/10
FIXED CONSTRUCTIONS
Abstract
The present invention relates to a barrier testing method for testing a production casing in a borehole (4). The method is applied before initiating production in a well and comprises the steps of connecting a drill pipe (10) with a first end (20) of a first production casing having annular barriers (17), which annular barriers (17) comprise a tubular part forming part of the casing and an expandable sleeve circumferenting the tubular part, thereby defining an expandable space; inserting the drill pipe (10) and the first production casing (3) via a drill head (6) arranged at a top (7) of the well into an intermediate casing (11) extending in a first part (18) of the borehole (4) closest to the top of the well and at least part of the first production casing into a second part (19) of the borehole; sealing a second end (21) of the first production casing (3); pressurizing the first production casing (3) from within and expanding one or more of the expandable sleeves (22) of the annular barriers (17) to abut a wall of the borehole; pressurizing the first production casing (3) from within to a predetermined pressure; and testing the first production casing (3) after expansion by measuring if the predetermined pressure is kept constant during a predetermined time period. Furthermore, the invention relates to a completion system for oil production from a well and to an oil production facilitated by the method barrier testing method.
Claims
1. A barrier testing method for testing a production casing in a borehole, the method being applied before initiating production in a well, the method comprising: connecting a drill pipe with a first end of a first production casing having annular barriers, which annular barriers comprise a tubular part forming part of the casing and an expandable sleeve circumferenting the tubular part, thereby defining an expandable space, inserting the drill pipe and the first production casing via a drill head arranged at a top of the well into an intermediate casing extending in a first part of the borehole closest to the top of the well and at least part of the first production casing into a second part of the borehole, sealing a second end of the first production casing, pressurising the first production casing from within and expanding one or more of the expandable sleeves of the annular barriers to abut a wall of the borehole, pressurising the first production casing from within to a predetermined pressure, and testing the first production casing after expansion by measuring if the predetermined pressure is kept constant during a predetermined time period, while the second end of the first production casing is sealed.
2. A barrier testing method according to claim 1, further comprising: setting a first barrier packer between the first production casing and the intermediate casing, disconnecting the drill pipe, pressurising the first production casing and the intermediate casing from within to a second predetermined pressure, and testing the first barrier packer by measuring if the second predetermined pressure is kept constant during a predetermined time period.
3. A barrier testing method according to claim 2, further comprising: inserting a second production casing into the well, the second production casing having a plug arranged within a second production casing and a downhole safety valve arranged within the second production casing closer to the top of the well than the plug, setting a second barrier packer in an annular space between the second production casing and the intermediate casing, pressurising the annular space from within to a third predetermined pressure, and testing the second barrier packer by measuring if the third predetermined pressure is kept constant during a predetermined time period.
4. A barrier testing method according to claim 3, further comprising: opening the downhole safety valve, pressurising the second production casing from within to a fourth predetermined pressure, and testing the plug by measuring if the fourth predetermined pressure is kept constant during a predetermined time period.
5. A barrier testing method according to claim 4, further comprising: closing the downhole safety valve, pressurising the second production casing above the downhole safety valve from within to a fifth predetermined pressure, and testing the downhole safety valve by measuring if the fifth predetermined pressure is kept constant during a predetermined time period.
6. A barrier testing method according to claim 5, further comprising: replacing the drill head with a well head, pressurising the annular space from within to a sixth predetermined pressure, and testing the second barrier packer by measuring if the sixth predetermined pressure is kept constant during a predetermined time period.
7. A barrier testing method according to claim 6, further comprising: pressurising the second production casing above the downhole safety valve from within to a seventh predetermined pressure, and testing the downhole safety valve by measuring if the seventh predetermined pressure is kept constant during a predetermined time period.
8. A barrier testing method according to claim 1, wherein cement is provided between the intermediate casing and the borehole and the intermediate casing comprises at least two annular barriers, and before the first production casing is arranged in the well, the annular barriers of the intermediate casing are expanded to abut the wall of the borehole, thereby displacing the non-cured cement so that a pressure increase is created between the annular barriers, the method further comprising testing the annular barriers by monitoring the pressure increase for a period of time.
9. A barrier testing method according to claim 7, wherein the intermediate casing comprises an annular barrier, and before the first production casing is arranged in the well, the annular barriers of the intermediate casing are expanded to abut a second intermediate casing arranged outside the intermediate casing, whereby a second annular space is provided above and between the intermediate barriers and the second intermediate barrier, the method comprising: pressurising the second annular space from within to an eighth predetermined pressure, and testing the annular barrier by measuring if the eighth predetermined pressure is kept constant during a predetermined time period.
10. A barrier testing method according to claim 1, further comprising rotating the first production casing while inserting the same.
11. A barrier testing method according to claim 1, wherein, before sealing the second end of the first production casing is initiated, the first production casing is pressurised with a flushing fluid so that the flushing fluid is injected from the second end of the first production casing for flushing drilling mud outside the first production casing.
12. A barrier testing method according to claim 1, wherein pressurising the first production casing from within to a predetermined pressure is performed by pressurising fluid into the well from the top of the well.
13. A barrier testing method according to claim 1, wherein sealing the second end of the first production casing is performed by dropping a ball into the first production casing, the ball being adapted to seal off an opening provided at the second end of the first production casing.
14. A barrier testing method according to claim 1, further comprising providing apertures in the first production casing to allow fluid communication between the borehole and the casing.
15. A barrier testing method according to claim 14, further comprising injecting stimulation fluid out through the apertures into the borehole to perform stimulation of the borehole.
16. A completion system for oil production from a well, adapted for carrying out the method according to claim 1.
Description
BRIEF DESCRIPTION OF THE DRAWINGS
(1) The invention and its many advantages will be described in more detail below with reference to the accompanying schematic drawings, which for the purpose of illustration show some non-limiting embodiments and in which
(2)
(3)
(4)
(5)
(6)
(7)
(8)
(9)
(10)
(11)
(12)
(13) All the figures are highly schematic and not necessarily to scale, and they show only those parts which are necessary in order to elucidate the invention, other parts being omitted or merely suggested.
DETAILED DESCRIPTION OF THE INVENTION
(14)
(15) Subsequently, the annular barriers 17 are expanded to abut against the inner wall 9 of the borehole 4, as illustrated in
(16) In
(17) After testing the first production casing 3, the drill pipe 10 must be disconnected, but before doing so, a first barrier packer 31 is set between the first production casing and the intermediate casing 11, as shown in
(18) In another embodiment, the intermediate casing 11 is pressurised from within to a second predetermined pressure so that the annular space 32 between the intermediate casing 11 and the drill pipe 10 is pressurised to the second predetermined pressure for a period of time, and the first barrier packer 31 is tested by measuring if the second predetermined pressure is kept constant during a predetermined time period.
(19) In known well completion technology, packers and other “barriers” are set, but they are not tested, and it is therefore uncertain whether they are in fact barriers.
(20) After confirming that the first barrier packer 31 is in fact a barrier, a second production casing 33 having a plug 34 and a downhole safety valve 36 is inserted into the well, as shown in
(21) When it has been confirmed that the second barrier packer 35 is a barrier, the downhole safety valve 36 is opened and the second production casing 33 is pressurised from within to a fourth predetermined pressure, and the plug 34 is tested by measuring if the fourth predetermined pressure is kept constant during a predetermined time period. If the pressure is maintained during the predetermined period of time, it means that the plug 34 is a tight barrier. Subsequently, the downhole safety valve 36 is closed again, and now, five barriers have been tested.
(22) After closing the downhole safety valve 36, the second production casing 33 above the downhole safety valve 36 is pressurised from within to a fifth predetermined pressure, and the downhole safety valve 36 is tested by measuring if the fifth predetermined pressure is kept constant during a predetermined time period and thus if the downhole safety valve 36 is tight and consequently a barrier.
(23) A downhole safety valve 36 proven to be a barrier closes the well sufficiently to replace the drill head with the well head which is to be used during production, as shown in
(24) Subsequently, the second production casing 33 above the downhole safety valve 36 is pressurised from within to a seventh predetermined pressure, and the downhole safety valve 36 is tested by measuring if the seventh predetermined pressure is kept constant during a predetermined time period. If both the sixth and the seventh pressure are maintained during the corresponding predetermined period of time, it means that the well head 37 has been successfully connected, as shown in
(25) In
(26) At least one annular barrier 17 may also be arranged between the intermediate casing 11 and a second intermediate casing 41. In
(27) The well has now been completed and the components and their mutual connections have been tested to confirm that the barriers are in fact barriers, and the well is now ready for initiating production, as shown in
(28) When access has been provided to the annulus 16 and thus the formation, the well may need to be stimulated before being able to produce properly. The stimulation of the well is performed by injecting stimulation fluid out through the apertures 38 and into the borehole 4. The stimulation fluid may be a fracking fluid used to provide fractures in the formation, and the fracking fluid may comprise proppants. The stimulation fluid may also be an acid.
(29) As shown in
(30) Furthermore, the first end 20 of the first production casing 3 may have an enlarged diameter (not shown), enabling the end of the second production casing 33 to fit inside the first end of the first production casing. The end of the second production casing may thus be “snuck-fitted” into the first production casing 3. Having such a fitted connection between the production casings prevents a tool, e.g. a tool connected with a downhole tractor, submerged in later operation from getting stuck in the gap between the two production casings, as shown in
(31) Before sealing the second end 21 of the first production casing 3, a flushing fluid may be injected from the second end of the first production casing 3 to perform a clean-out by flushing most of the drilling mud outside the first production casing 3 along the outside of the first production casing 3 and along the outside of the drill pipe.
(32) The second end 21 of the first production casing 3 may also be sealed by inserting a plug, such as a swellable plug or another type drop device, into the opening at the second end 21 of the first production casing 3.
(33) The intermediate casing 11 and the first and second production casings 3, 33 are made of metal like the annular barriers 17. The first and/or second barrier packers 31, 35 may be an expandable annular barrier 17.
(34) To document the overall integrity of the well before production, the data obtained during testing of the first production casing 3, the first barrier packer 31, the second barrier packer 35, the plug 34, the downhole safety valve 36 and the annular barriers 17, respectively, are stored.
(35) The well shown in
(36) By fluid or well fluid is meant any kind of fluid that may be present in oil or gas wells downhole, such as natural gas, oil, oil mud, crude oil, water, etc. By gas is meant any kind of gas composition present in a well, completion, or open hole, and by oil is meant any kind of oil composition, such as crude oil, an oil-containing fluid, etc. Gas, oil, and water fluids may thus all comprise other elements or substances than gas, oil, and/or water, respectively.
(37) By a casing is meant any kind of pipe, tubing, tubular, liner, string etc. used downhole in relation to oil or natural gas production.
(38) In the event that the tool is not submergible all the way into the casing, a downhole tractor can be used to push the tool all the way into position in the well. The downhole tractor may have projectable arms having wheels, wherein the wheels contact the inner surface of the casing for propelling the tractor and the tool forward in the casing. A downhole tractor is any kind of driving tool capable of pushing or pulling tools in a well downhole, such as a Well Tractor®.
(39) Although the invention has been described in the above in connection with preferred embodiments of the invention, it will be evident for a person skilled in the art that several modifications are conceivable without departing from the invention as defined by the following claims.