Method and apparatus for controlling a turbogenerator system
09831811 · 2017-11-28
Assignee
Inventors
- John Lyons (Southamptom, GB)
- Stephen Cusworth (Southamptom, GB)
- Jonathon McGuire (Southamptom, GB)
- Shinri Szymko (Southamptom, GB)
- Toby King (Southamptom, GB)
Cpc classification
H02P9/10
ELECTRICITY
International classification
F02D29/06
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
H02P9/00
ELECTRICITY
H02P9/10
ELECTRICITY
H02P9/04
ELECTRICITY
Abstract
An apparatus for controlling a turbogenerator system when a power electronics circuit of the turbogenerator system is unable to provide a sufficient load on the turbogenerator to prevent the turbogenerator from accelerating uncontrollably is described. The apparatus includes a monitor including a first sensing device operable to detect a condition of the turbogenerator, and a brake controller responsive to a turbogenerator detection output from the first sensing device to issue a first brake control signal for operating a brake circuit to prevent the turbogenerator from accelerating uncontrollably and a second brake control signal for operating the brake circuit to permit resumption of normal operation of the turbogenerator.
Claims
1. An apparatus for controlling a turbogenerator in a turbogenerator system when a power electronics circuit of the turbogenerator system is unable to provide a sufficient load on the turbogenerator to prevent the turbogenerator from accelerating uncontrollably, the apparatus comprising: a monitor including a first sensing device operable to detect a condition of the turbogenerator, wherein the first sensing device is arranged to monitor at least one of the speed and the output voltage of the turbogenerator with respect to predetermined upper and lower thresholds respectively for generating a turbogenerator detection output, and wherein the turbogenerator is configured to recover waste energy from an engine, and a brake controller responsive to the turbogenerator detection output from the first sensing device to issue a first brake control signal for operating a brake to prevent the turbogenerator from accelerating uncontrollably and a second brake control signal for operating the brake to permit resumption of normal operation of the turbogenerator, wherein the brake is a brake circuit.
2. The apparatus according to claim 1, wherein the power electronics circuit is deactivated during a grid disturbance, further comprising a second sensing device operable to detect a condition of the grid, and a trigger circuit responsive to a grid detection output from the second sensing device indicating a cessation of the grid disturbance to reactivate the power electronics unit and begin exporting power to the grid.
3. The apparatus according to claim 2, wherein the trigger circuit is responsive to a grid detection output from the second sensing device indicating a grid disturbance to de-activate the power electronics unit.
4. The apparatus according to claim 1, wherein the brake controller comprises a rectifier circuit arranged to rectify an AC output from the turbogenerator and to supply the rectified output to the brake circuit, and a switching device operable by the output from the first sensing device for respectively issuing the first and second brake control signals for controlling the supply of the rectified output to the brake circuit.
5. The apparatus according to claim 1, wherein the upper and lower thresholds are hysteresis thresholds, and wherein the first sensing device is responsive to the hysteresis thresholds to generate the turbogenerator detection output to cause the brake controller cyclically to generate the first and second brake control signals.
6. The apparatus according to claim 2, wherein the power electronics unit comprises a convertor circuit for generating an AC output and a contactor circuit for supplying a power output in synchronization with the grid, and wherein the trigger circuit is arranged to respond to the grid detection output from the second sensing device indicating a cessation of the grid disturbance by activating the convertor circuit and the contactor circuit and by initiating a re-synchronization with the grid.
7. The apparatus according to claim 2, wherein the second sensing device is arranged to monitor at least one of grid frequency, grid voltage and grid current with respect to predetermined upper and lower thresholds for generating the detection output.
8. A method for controlling a turbogenerator in a turbogenerator system when a power electronics circuit of the turbogenerator system is unable to provide a sufficient load on the turbogenerator to prevent the turbogenerator from accelerating uncontrollably, the method comprising: detecting a condition of the turbogenerator employing a first sensing device, wherein the first sensing device is arranged to monitor at least one of the speed and the output voltage of the turbogenerator with respect to predetermined upper and lower thresholds respectively for generating a turbogenerator detection output; and responsive to the turbogenerator detection output from the first sensing device, issuing a first brake control signal for switching on a brake to prevent the turbogenerator from accelerating uncontrollably and a second brake control signal for switching off the brake to permit resumption of normal operation of the turbogenerator, wherein the turbogenerator is configured to recover waste energy from an engine and the brake is a brake circuit.
9. The method according to claim 8, wherein the power electronics circuit is deactivated during a grid disturbance, the method further comprising detecting a condition of the grid employing a second sensing device, and responsive to a grid detection output from the second sensing device which indicates a cessation of the grid disturbance, activating the power electronics unit and beginning to export power to the grid.
10. The method according to claim 9, further comprising de-activating the power electronics unit responsive to a further grid detection output from the second sensing device indicating a grid disturbance.
11. The method according to claim 8, further comprising operating the brake by means of an output from a rectifier circuit arranged to rectify an AC output from the turbogenerator, and employing a switching device for respectively issuing the first and second brake control signals and controlling the supply of the rectified output to a brake circuit.
12. The method according to claim 8, wherein the upper and lower thresholds are hysteresis thresholds, and comprising responding to the hysteresis thresholds to generate the turbogenerator detection output cyclically for producing the first and second brake control signals.
13. The method according to claim 9, wherein the power electronics unit comprises a convertor circuit for generating an AC output and a contactor circuit for supplying a power output in synchronization with the grid, and further comprising responding to the grid detection output from the second sensing device indicating a cessation of the grid disturbance by activating the convertor circuit and the contactor circuit and by initiating a re-synchronization with the grid.
14. The method according to claim 9, further comprising monitoring at least one of grid frequency, grid voltage and grid current with respect to predetermined upper and lower thresholds for generating the grid detection output.
Description
(1) The invention will be described further, by way of example, with reference to the accompanying drawings in which:
(2)
(3)
(4)
(5)
(6)
(7)
(8)
(9)
(10) Referring to the drawings,
(11) The speed of the turbogenerator 20 is controlled by adjusting the load on the high speed electrical generator 26 by means of the power electronics unit 22, which exports variable amounts of power to the local electrical grid to hold the speed of the turbogenerator 20 at a predetermined value. The power electronics unit 22 includes a speed control unit 28 able to detect a speed signal representing the speed of the turbogenerator 20 received therein and to compare the actual speed with an internally preset speed set point to produce a speed error signal. The speed control unit 28 has programmed therein a speed control algorithm, which uses the speed error signal to generate a current demand signal for controlling the speed of the turbogenerator 20. The speed control unit 28 is a conventional proportional/integral controller, which calculates a speed error, and then proportional and integral gain values, and which then applies these gain values to calculate a current demand. Since the unit is conventional, further description is not given.
(12) Referring to
(13) The DC link voltage is applied to a PWM inverter, comprising a converter circuit 34 and a contactor circuit 36, which produces a three-phase AC output for supply to the local electrical grid. Typically, the converter circuit 34 comprises three parallel DC/AC converters 34a, 34b, 34c, each programmed to produce a sine wave output. The converters 34 provide three switching channels connected across the voltage bus and each including an upper and a lower switching device in the form of an IGBT switch and an anti-parallel diode (not shown). The output voltages generated by the converters 34 generally contain a large content of high-frequency ripple associated with the switching action of the IGBT switches in the converters 34. Therefore, an EMC or three-phase series-inductance/parallel-capacitance (L-C) output filter 38 is connected to the output of the contactor 36 to remove the majority of the high-frequency ripple.
(14) In addition, the boost converter 32 includes the speed control unit 28, and the current demand signal from the speed control unit 28 is passed to the converters 34a, 34b, 24c of the PWM inverter 34, 36, which is set up to act as a current source, for controlling the speed of the turbogenerator 20.
(15) According to the invention, a braking arrangement is provided for the high speed electrical generator 26 of the turbogenerator 20. The braking arrangement comprises a brake controller 40 connected to a brake circuit 42, shown in greater detail in
(16) Referring to
(17) The monitor circuit 48 is provided for controlling the operation of the switch 46, as shown in
(18) In normal operation of the generator 26, the switch 46 is maintained in the open state and power is supplied to the turbogenerator 20 from the power electronics unit 22 of
(19) The monitor circuit 48 comprises a turbogenerator detector 74 arranged to monitor the state of the turbogenerator 20. The turbogenerator detector 74 includes the speed control unit 28 and based on a simple algorithm in the speed control unit 28 is responsive to the outputs from a pair of sensors respectively (not shown) for detecting by means of the speed control unit 28 the speed of the turbogenerator 20 and the voltage output by the turbogenerator 20, and thence for generating detection signals accordingly. In the event that the turbogenerator 20 is operating normally, these sensors will each generate a “normal operation” signal for supply to the turbogenerator detector 74, and the turbogenerator detector 74 will output a “high” signal to maintain the switch 46 in an open condition. On the other hand, if one of the sensors detects an abnormal state in the turbogenerator 20, for example that the speed or voltage output exceed a predetermined threshold, such sensor will provide an “abnormal operation” signal to the turbogenerator detector 74, which will in turn output a “low” signal that will close the switch 46. As a result, the resistors 52 will be brought into circuit to apply a load to the generator 26 and brake the same.
(20) The monitor circuit 48 further includes a fault detector 76 arranged to detect predetermined internal or external events that will affect the operation of the turbogenerator 20 and to issue a signal to shut down the engine 12 in response to such events. For this purpose, the fault detector 76 is responsive to a series of sensors (not shown) for detecting such events. For example, one of these sensors may be arranged to detect failures in the electrical supply. Alternatively, or in addition, one of the sensors might be a pressure transmitting device arranged to detect impending engine compressor surge, or an accelerometer arranged to detect excessive vibration. Other possibilities for the sensors include sensors for the detection of internal currents or voltages of the turbogenerator system, the detection of the temperature of a heat sink of the turbogenerator, the detection of software errors, the detection of loss of communications between the various circuit elements 32, 34, or the detection of failure of an internal memory of the electrical processing system for the turbogenerator 20.
(21) Usually, the sensors associated with the fault detector 76 will generate a “normal” signal, and the monitor circuit 48 will provide a “high” output signal maintaining the engine 12 in a normal operating state. However, in response to the detection of an abnormal condition, such as one of those listed above, the associated sensor will generate a corresponding “abnormal” signal, and the fault detector 76 of the monitor circuit 48 will in turn will issue a “low” output signal for triggering a set of events to shut down the engine 12.
(22) Thus, as described with reference to
(23) In normal operation, all of the sensor signals are monitored by the monitoring circuit 48, as shown in step 90 in
(24) More especially, when a fault is detected within the monitoring circuit 48 in step 94, then the power electronics unit 22 inspects the outputs of all the sensors associated with the two detectors 74, 76 and the grid monitor 78 and establishes whether or not the fault is due to a grid disturbance. If the fault is due to a failure of the grid, then the grid monitor 78 issues a grid disturbance signal to the control unit 80, which responds by shutting down the power electronics unit 22 by disabling the converters 32 and 34 and temporarily placing them in a standby condition, and by opening the contactor 36. As a result, the turbogenerator 20 will no longer be loaded by the power electronics system 22 and will begin to accelerate. Accordingly, the speed of the turbogenerator 20, and the voltage output, will soon exceed a predetermined threshold, which will be detected by the associated sensors. The outputs from the sensors will be received by the turbogenerator detector 74, which will generate an output to switch on the brake 46. The monitoring system 48 will move to step 98.
(25) On the other hand, an inspection of the sensors by the fault detector 76 may show that the fault lies elsewhere and is not due to a grid disturbance. In this instance, the monitoring system 48 moves from step 96 to step 100, and sends out a shutdown command to shut down the engine 12 immediately. This ensures that the engine is shut down as a precaution, in the event of faults, such as overheating, that may lead to internal damage and expense. The engine 12 typically has inputs that can accept signals from external devices, and one such input (not shown) is configured to accept a shutdown signal from the monitoring system 48. Receipt of this signal by the engine 12 will initiate an engine shut down sequence. The shutdown signal is also applied via the control unit 80 to the converters 32 and 34 to disable the same and shut down the power electronics unit 22, thus leading to acceleration of the turbogenerator 20. This will then be detected by the monitor circuit 74, which will operate the brake 42. At the same time, therefore, the braking arrangement for the turbogenerator 20 will be brought into action, due to acceleration of the turbogenerator 20, to stop the turbogenerator 20 as quickly as possible.
(26) The process that is initiated with step 98 will now be described. At this point, the monitoring system 48 is monitoring the speed and voltage of the turbogenerator 20, employing the turbogenerator detector 74, as well as the frequency and voltage of the grid, employing the grid monitor 78.
(27) The effect of the grid fault that has occurred is to remove the load on the turbogenerator 20, which immediately begins accelerating. As soon as the turbogenerator detector 74 detects that the speed of the turbogenerator 20 has exceeded a predetermined hysteresis threshold, or that the turbogenerator voltage output has exceeded a predetermined hysteresis threshold, the monitoring system 48 signals the brake controller 40 and activates the switch 46 to switch on the brake 42. Accordingly, the turbogenerator 20 decelerates, and its speed and voltage output drop. When these drop below further hysteresis thresholds, the monitoring system 48 again detects the situation and this time sends a signal to the brake controller 40 to switch off the switch 46 and the brake 42. The turbogenerator 20 begins accelerating again. These steps may be repeated a number of times in a cycle during the course of step 98 over a waiting period to be described below with reference to
(28) Whilst the turbogenerator speed and voltage are being monitored by the turbogenerator detector 74, the grid frequency and voltage are being monitored by the grid monitor 78, in order to detect the state of the grid and the moment when the grid disturbance ceases and the grid returns to a healthy condition. As described above the DC/DC converter circuit 32 and the DC/AC converters 34 are temporarily disabled at this time. However, during this time, the boost converter, i.e. the DC/DC circuit 32 and the DC/AC converters 34, is held in readiness to start again, as shown in step 102 in
(29)
(30) As shown in the first portion of
(31) Furthermore, in the conventional arrangement, responsive to the continuance of the fault for more than a brief preset period, a shutdown request is issued at time T3, causing the power output by the generator 18 to ramp down and also reducing the power to the turbogenerator 20. At time T4, the speed of the turbogenerator 20, and likewise its voltage output, drops below a hysteresis threshold, and this is detected by the turbogenerator detector 74. Accordingly, the brake 46 is switched off and the turbogenerator 20 begins accelerating again. This cycle of alternately switching on and off the brake 46 is repeated until time T5, when the engine 12 is no longer producing enough exhaust gas to power the turbogenerator 20. At this point, the turbogenerator 10 shuts down.
(32) Turning now to
(33) Furthermore, again by contrast with the prior art, at time T4, the monitoring system 48 notes from the grid monitor 78 that the grid disturbance has been removed and that the grid has returned to normal, thereby removing the fault detected in the power electronics unit 22. The monitoring system 48 then issues a grid healthy signal in order to re-activate the inverter circuit, comprising the DC/DC converters 34 and the contactor 36, to generate a sine wave output again and to close the contactor 36 to begin ramping up the power output from the turbogenerator 22, and to reconnect to the grid at time T5. The process of re-activating the inverter circuit is described above.
(34) The above described embodiments use an electrically resistive (Ohmic) brake. Such a brake uses electrical resistance rather than mechanical friction in order to slow down the turbogenerator. As such, the brake circuit does not suffer from wear and tear in the way of the mechanical brake. Furthermore, it may be faster acting, and may allow energy to be dissipated in a more controlled manner than a mechanical brake. Nonetheless, it will be appreciated that the present invention need not be limited to an electrically resistive brake, and may instead make use of a physical brake which is responsive to the first and second brake control signals to apply and remove respectively a braking force to control the speed of the turbogenerator. Such mechanical brakes are well known, and are not described further herein.
(35) As explained above, the present invention is applicable in any situation in which the power electronics circuit is unable to export enough power to form a sufficient load on the turbogenerator to prevent the turbogenerator from accelerating uncontrollably. The above example is that of where this is caused by a grid disturbance, which leads to the deactivation of the power electronics circuit, but the problem may arise under other circumstances as outlined previously. Where the problem is not due to a disturbance in the grid, then the power electronics circuit may not need to be deactivated, but instead may be used in combination with the brake to regulate the speed of the turbogenerator. It will be understood that the brake is activated in dependence on the condition (e.g. speed or output voltage) of the turbogenerator, which will exceed allowable bounds only in the event that the power electronics circuit is unable to regulate the turbogenerator speed unaided. There is no requirement to monitor the performance of the power electronics circuit directly. It will also be appreciated that, even where the brake is intended to regulate the turbogenerator speed in the event of a disturbance in the grid, then other techniques (i.e. in the alternative to deactivation of the power electronics circuit) could be used to isolate the power electronics circuit from the grid.