METHOD FOR OPERATING A MOVABLE COMPACTION DEVICE DURING MATERIAL COMPACTION WORK
20230175211 · 2023-06-08
Inventors
Cpc classification
E01C21/00
FIXED CONSTRUCTIONS
E01C19/288
FIXED CONSTRUCTIONS
E01C23/01
FIXED CONSTRUCTIONS
International classification
E01C23/01
FIXED CONSTRUCTIONS
E01C21/00
FIXED CONSTRUCTIONS
Abstract
In the method for operating a movable compaction device (10) during material compaction work the moisture content of the material to be compacted is monitored. The method comprises the steps of defining a compaction performance index for the material (100) to be compacted, said compaction performance index being an electromagnetic character correlating with the volumetric moisture content of the material, determining the compaction performance index value in a number of survey points of the material to be compacted during compaction work using electromagnetic measurement device and controlling the operation on the compaction device based on determined compaction performance index values. Determination of the compaction performance index includes sending at east one wideband electromagnetic pulse to the material to be compacted with a ground penetrating radar, receiving a reflected signal, measuring the power spectral density and peak to peak amplitude from the reflected signal and calculating the compaction performance index by using the measured density and amplitude.
Claims
1. A method for operating a movable compaction device during material compaction work, in which method the moisture content of the material to be compacted is monitored, said method comprising steps of defining a compaction performance index for the material to be compacted, said compaction performance index being an electromagnetic character correlating with the volumetric moisture content of the material, determining the compaction performance index value in number of survey points of the material to be compacted during compaction work using movable electromagnetic measurement device and controlling the operation on the compaction device during compaction work based on determined compaction performance index values, wherein the determination of the compaction performance index on each survey point includes sending at least one wideband electromagnetic pulse to the material to be compacted with a ground penetrating radar (GPR), receiving a reflected signal, measuring Power spectral density (PSDm) and Peak to Peak Amplitude (PTPm) from the reflected signal, and calculating the compaction performance index by using the measured Power spectral density (PSDm) and Peak to Peak Amplitude (PTPm), said method further comprises steps of defining a Power spectral density reference (PSDr) and Peak to Peak amplitude reference (PTPr) by calibrating the ground penetrating radar (GPR) in the air or in the soil and calculating the compaction performance index by equation
2. The method according to claim 1, wherein the method further comprises steps of determining a location of each survey point, and storing the determined location and the corresponding compaction performance index value to a computer readable medium.
3. The method according to claim 2, wherein the locations of the survey points are determined using satellite positioning system, such as GPS (global positioning system), which satellite positioning system is arranged to said movable compaction device.
4. The method according to claim 1, wherein the electromagnetic measurement device is arranged to said movable compaction device, and the determination of the compaction performance index value is done real-time continuously or periodically during movement of the compaction device.
5. The method according to claim 1, the wideband electromagnetic pulses are sent to the material to be compacted within 30 cm movement of the compaction device.
6. The method according to claim 1, wherein the method further comprises a step of defining an optimum value or range for the compaction performance index, which optimum value or range corresponds to an optimum gravimetric moisture content, optimum volumetric moisture content or optimum saturation degree of the material to be compacted.
7. The method according to claim 6, wherein the method further comprises steps of comparing the determined compaction performance index values of the material layer to be compacted and the optimum value or range of the compaction performance index and adjusting the operation of the movable compaction device, if when the determined compaction performance index values differ from the optimum value or range of the compaction performance index.
8. The method according to claim 7, wherein the movable compaction device is a roller compactor and the comparison of the determined compaction performance index values of the material to be compacted and the optimum value or range of the compaction performance index is done on the compaction work site by an operator of the roller compactor.
9. the method according to claim 7, wherein the determined compaction performance index values of the material to be compacted and the optimum value or range of the compaction performance index are transmitted to a remote location, preferably to a construction site project office, the comparison of the determined compaction performance index values of the material to be compacted and the optimum value or range of the compaction performance index is done in the remote location and instructions to adjust the operation of the movable compaction device are transmitted from the remote location to the operator of the movable compaction device.
10. The method according to claim 1, wherein a number of passes of the compaction device over a compacted area is calculated and the number of passes and the determined compaction performance index values over the compacted area are stored to a computer readable medium.
Description
BRIEF DESCRIPTION OF THE DRAWINGS
[0028] In the following the invention will be described in detail, by way of examples, with reference to the accompanying drawings in which,
[0029]
[0030]
DETAILED DESCRIPTION
[0031] In
[0032] The compaction moisture monitoring means further comprise data transfer means 18, which may operate in a wireless data transfer network, such as 4G, 5G or WIFI-network and a GPS-unit 16 (global positioning system-unit). The separate devices belonging to or being connected to the compaction moisture monitoring means are installed to the roller compactor. The driver of the roller compactor can see a parameter correlating with the moisture content of the material from the display of the data processing unit in real time while driving the roller compactor on the material layer, preferably soil layer, being compacted.
[0033] In
[0034] In the method a compaction performance index for the material layer to be compacted is defined. The compaction performance index used in the method is a measurable electromagnetic character correlating with the volumetric moisture content of the material. The compaction performance index value is determined in a number of survey points of the material to be compacted during compaction work using electromagnetic measurement device and the operation on the compaction device is controlled during compaction work based on determined compaction performance index values.
[0035] The method is implemented in field conditions with compaction moisture monitoring means of
[0036] Determination of the compaction performance index on each survey point in done by sending at wideband electromagnetic pulse to the material to be compacted with a ground penetrating radar GPR and receiving signals reflected from the material. A power spectral density and peak to peak amplitude are measured from the reflected signals. The compaction performance index by calculated based on the measured power spectral density and peak to peak amplitude.
[0037] The compaction performance index is calculated by equation
[0038] In the method a reference value for the power spectral density and peak to peak amplitude is first determined by calibrating the ground penetrating radar in the air. When the compaction performance index is calculated by using calibration value of the direct wave in the air, the calculated index provides a map of relative change in compaction and moisture.
[0039] Alternatively, the in the method a reference value for the power spectral density and for the peak to peak amplitude can be determined by calibrating the ground penetrating radar in the soil sample having known moisture content. When using the calibration value of the direct wave from a soil sample having an optimal moisture/compaction level, a more clear map of locations were the moisture of the material is optimum or less optimum for compaction is provided.
[0040] The power spectral density may not contribute equally to the compaction performance index. Therefore, the weight of these parameters can be adjusted using multiplying factors, i.e. frequency factor and amplitude factor, to get a one parameter making more contribution that the other. The purpose of using these factors is to reach an optimal representation of change in volumetric moisture content during the compaction. Preferably, frequency factor FF is 0,5-0,9 and the amplitude factor AF is 0,1-0,5. The sum of frequency factor FF and amplitude factor AF is one.
[0041] The compaction performance index of the material layer is determined in several survey points either continuously or periodically while the compaction device is moving on the area to be compacted. Simultaneously, the GPS-unit defines the position of the survey points. The received electromagnetic signals are recorded and the data processing unit calculates from time domain and frequency domain components of these signals a compaction performance index of the layer being compacted. The position and the calculated compaction performance index in each survey point is stored to the memory of the data processing unit 14.
[0042] The specific power spectral density of the received signals is calculated from a set number of measurements (scans) in specified ground penetrating radar (GPR) time window using Fourier transform. GPR comprises a low frequency antenna with a center frequency ranging between 300 to 500 MHz coupled to the material layer to be compacted. The monitored frequency ranges between −8% and +16% around the center frequency of the antenna and calculated at a time window of −2 ns before the max amplitude of the direct wave to +4 ns after the max amplitude of the direct wave.
[0043] An initial measurement of the direct wave in the air is made first to characterize the antenna. The initial measurement value is used to normalize the power spectral density measurements when the antenna is coupled to the material. The percentage loss of power spectral density at the monitored frequency range in the material (relative to the air) can be calculated from at least 3 scans performed within 30 cm distance, i.e. within 30 cm movement of the roller compactor.
[0044] The power spectral density PSD discloses the distribution of a signal power as a function of frequency. Therefore, PSD allows the power distribution analysis and characterization of a signal over the studied frequency range. The PSD is commonly used in the signal processing and communications industry and well documented in the academic publishing.
[0045] The evaluation of the moisture content of the soil by measuring the specific power spectral density and peak to peak amplitude is based on the lowpass effect of the soil on the direct wave. It has been found, that the volumetric moisture content of the soil is proportional to the dielectric properties of the soil, whereby changes in the volumetric moisture content result changes also in the lowpass effect. Therefore, by calculating specific power spectral densities and peak to peak amplitudes of a direct wave, relative moisture change in the unbound layer during compaction can be estimated. Thickness of the monitored material layer can be between 20 to 60 cm measured from the surface of the material layer.
[0046] So instead of focusing on one dielectric property such as the dielectric value, in the invention it is focused to measurable changes of the electromagnetic wave properties by tracking the amplitude and frequency changes across the compacted field. Assuming that the material mix, used in compaction, is the same, then these changes are affected by the volumetric moisture and compaction degree in the field. The measured parameter can be either relative to a reference compacted material sample or relative to the air.
[0047] The determined compaction performance index reflects the change of the received electromagnetic signal properties caused by moisture variation in the measured soil under compaction and highlight critical locations of high loss of the power spectral density percentage that correlate with high probabilities of excessive level of moisture.
[0048] In the method an optimum value or range for the compaction performance index is defined. The optimum value or range corresponds to the optimum gravimetric moisture content, optimum volumetric moisture content or optimum saturation degree of the material to be compacted. The driver of the compaction device monitors the compaction performance index and compares the determined compaction performance index values of the material layer to the optimum value or range of the compaction performance index. Based on this comparison the driver can adjust the operation of the movable compaction device, if necessary. For example, if the determined compaction performance index value shows, that the volumetric moisture content of the material layer is below the optimum value, the driver may decide to execute supplementary compaction device passes over the area to be compacted. Alternatively, the driver may delay the compaction work and order the material layer to be wetted. On the other hand, if the determined compaction performance index value shows, that the volumetric moisture content of the material layer is above the optimum value, which may cause loss of strength of the material layer, the driver may decide to reduce the compaction passes or delay the compaction work until the material layer is dried.
[0049] Compaction performance index information can be sent with data transfer means to a remote location, for example to a project office, where an authorized person can make decision how to operate the compaction device. Instructions for the operation are then sent back to driver of the compaction device with the same data transfer means. The data processing unit calculates how many passes the compaction device has made over the whole area to be compacted and stores this information to the memory of the data processing unit to ensure—and to prove when needed-proper compaction coverage.
[0050] Some preferred embodiments of method according to the invention has been disclosed above. The invention is not limited to the solutions explained above, but the invention can be applied in different ways within the limits set by the patent claims.