REFRIGERATION CYCLE APPARATUS
20230175744 · 2023-06-08
Inventors
Cpc classification
F25B2313/02742
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
F25B13/00
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
F25B41/26
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
F25B41/20
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
International classification
F25B13/00
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
Abstract
A refrigeration cycle apparatus includes a compressor, a first heat exchanger, a decompressing device, a second heat exchanger, a first switching valve, a second switching valve, and a controller. The first switching valve is switched to one of a first state and a second state. The second switching valve is switched to one of a third state, a fourth state, and a fifth state. When switching to a second cooling operation to bring the first and second switching valves into the second and fourth states respectively, is requested during a first cooling operation to bring the first and second switching valves into the first and third states, respectively, the controller performs a first switching operation to bring the first switching valve into the second state and bring the second switching valve into the fifth state, and thereafter switches the first switching operation to the second cooling operation.
Claims
1. A refrigeration cycle apparatus switchable between a first operation and a second operation, the first operation being an operation in which refrigerant circulates in order of a compressor, a first heat exchanger, a decompressing device, and a second heat exchanger, and the second operation being an operation in which the refrigerant circulates in order of the compressor, the second heat exchanger, the decompressing device, and the first heat exchanger, the refrigeration cycle apparatus comprising: a first switching valve connected to a discharge port of the compressor, one port of the first heat exchanger, one port of the second heat exchanger, and one port of the decompressing device; a second switching valve connected to a suction port of the compressor, the other port of the first heat exchanger, the other port of the second heat exchanger, and the other port of the decompressing device; and a controller configured to control the first switching valve and the second switching valve; wherein the first switching valve is configured to be switchable to one of a first state and a second state, in the first state, the discharge port of the compressor is connected to the one port of the first heat exchanger, and the one port of the second heat exchanger is connected to the one port of the decompressing device, and in the second state, the discharge port of the compressor is connected to the one port of the second heat exchanger, and the one port of the first heat exchanger is connected to the one port of the decompressing device, the second switching valve is configured to be switchable to one of a third state, a fourth state, and a fifth state, in the third state, the other port of the first heat exchanger is connected to the other port of the decompressing device, and the other port of the second heat exchanger is connected to the suction port of the compressor, in the fourth state, the other port of the second heat exchanger is connected to the other port of the decompressing device, and the other port of the first heat exchanger is connected to the suction port of the compressor, and in the fifth state, the other port of the decompressing device is connected to the suction port of the compressor, and the other port of the first heat exchanger is disconnected from the other port of the second heat exchanger, the controller is configured to set the first switching valve to the first state and set the second switching valve to the third state during the first operation, and set the first switching valve to the second state and set the second switching valve to the fourth state during the second operation, and when switching to the second operation is requested during the first operation, the controller is configured to perform a first switching operation to bring the first switching valve into the second state and bring the second switching valve into the fifth state, and switch an operation of the refrigeration cycle apparatus to the second operation after performing the first switching operation.
2. The refrigeration cycle apparatus according to claim 1, wherein when switching to the first operation is requested during the second operation, the controller is configured to perform a second switching operation to bring the first switching valve into the first state and bring the second switching valve into the fifth state, and switch the operation of the refrigeration cycle apparatus to the first operation after performing the second switching operation.
3. The refrigeration cycle apparatus according to claim 2, further comprising an air blower configured to be capable of blowing air to the first heat exchanger and the second heat exchanger, wherein the controller is configured to control the air blower to stop bloc blowing air to the first heat exchanger and the second heat exchanger during the first switching operation and the second switching operation.
4. The refrigeration cycle apparatus according to claim 3, wherein the air blower comprises a first air blower configured to be capable of switching a supply destination of indoor air to be cooled to one of the first heat exchanger and the second heat exchanger, and the controller is configured to control the first air blower to set the supply destination of the indoor air to the second heat exchanger during the first operation, and set the supply destination of the indoor air to the first heat exchanger during the second operation.
5. The refrigeration cycle apparatus according to claim 4, wherein the air blower comprises a second air blower configured to be capable of switching a supply destination of outdoor air not to he cooled to one of the first heat exchanger and the second heat exchanger, and the controller is configured to control the second air blower to set the supply destination of the outdoor air to the first heat exchanger during the first operation, and set the supply destination of the outdoor air to the second heat exchanger during the second operation.
6. The refrigeration cycle apparatus according to claim 4, further comprising a second decompressing device and a third heat exchanger that are disposed between the second switching valve and the suction port of the compressor.
7. The refrigeration cycle apparatus according to claim 6, wherein the indoor air is blown in order of the second heat exchanger and the third heat exchanger during the first operation, and blown in order of the first heat exchanger and the third heat exchanger during the second operation.
8. The refrigeration cycle apparatus according to claim 7, wherein the first heat exchanger and the second heat exchanger each have a surface onto which an adsorbent serving to adsorb moisture in air is applied.
9. The refrigeration cycle apparatus according to claim 6, further comprising a fourth heat exchanger disposed between the discharge port of the compressor and the first switching valve.
Description
BRIEF DESCRIPTION OF DRAWINGS
[0012]
[0013]
[0014]
[0015]
[0016]
[0017]
[0018]
[0019]
[0020]
[0021]
[0022]
[0023]
[0024]
[0025]
[0026]
[0027]
[0028]
[0029]
[0030]
[0031]
[0032]
[0033]
[0034]
[0035]
DESCRIPTION OF EMBODIMENTS
[0036] The following describes embodiments of the present disclosure in detail with reference to the accompanying drawings. While a plurality of embodiments will be described below, it has been originally intended at the time of filing of the present application to appropriately combine the configurations described in the embodiments. In the accompanying drawings, the same or corresponding components are denoted by the same reference characters, and description thereof will not be repeated.
First Embodiment
[0037] [Description of Configuration]
[0038]
[0039] In refrigerant circuit RC, compressor 10, first heat exchanger 20, decompressing device 30, and second heat exchanger 40 are connected by pipes 51 to 58, first switching valve 60, and second switching valve 70 to thereby form a circulation flow path through which refrigerant circulates. Inside refrigerant circuit RC, refrigerant involving a phase change, such as carbon dioxide or R410A, circulates.
[0040] Compressor 10 has a suction port connected to pipe 58, and a discharge port connected to pipe 51. Compressor 10 suctions low-pressure refrigerant from pipe 58, compresses the suctioned refrigerant, and then discharges the compressed refrigerant as high-pressure refrigerant to pipe 51. The rotation speed of compressor 10 is adjusted in response to a command from controller 100. Compressor 10 discharges refrigerant at a flow rate corresponding to the rotation speed. The flow rate of the refrigerant circulating through refrigeration cycle apparatus 1 is controlled by adjusting the rotation speed (the discharge flow rate) of compressor 10.
[0041] First heat exchanger 20 and second heat exchanger 40 each are a heat exchanger having a flow path through which refrigerant flows. In each of first heat exchanger 20 and second heat exchanger 40, heat is exchanged between the refrigerant flowing through the flow path and the air outside the flow path.
[0042] Decompressing device 30 decompresses high-pressure refrigerant. Examples of decompressing device 30 usable herein include a device having a valve body capable of adjusting a degree of opening in response to a command from controller 100, such as an electronic control type expansion valve.
[0043] First switching valve 60 is a four-way valve having: a port connected to the discharge port of compressor 10 via pipe 51; a port connected to one port of first heat exchanger 20 via pipe 52; a port connected to one port of second heat exchanger 40 via pipe 56; and a port connected to one port of decompressing device 30 via pipe 55.
[0044] First switching valve 60 is switched to one of the first state and the second state in response to a command from controller 100.
[0045] When first switching valve 60 is in the first state, pipe 51 is connected to pipe 52, and pipe 56 is connected to pipe 55. Thereby, the discharge port of compressor 10 is connected to one port of first heat exchanger 20, and one port of second heat exchanger 40 is connected to one port of decompressing device 30. Note that
[0046] When first switching valve 60 is in the second state, pipe 51 is connected to pipe 56, and pipe 52 is connected to pipe 55. Thereby, the discharge port of compressor 10 is connected to one port of second heat exchanger 40, and one port of first heat exchanger 20 is connected to one port of decompressing device 30.
[0047] Second switching valve 70 is a four-way valve having: a port connected to the suction port of compressor 10 via pipe 58; a port connected to the other port of first heat exchanger 20 via pipe 53; a port connected to the other port of second heat exchanger 40 via pipe 57; and a port connected to the other port of decompressing device 30 via pipe 54.
[0048] Second switching valve 70 is switched to one of the third state, the fourth state, and the fifth state in response to a command from controller 100.
[0049] When second switching valve 70 is in the third state, pipe 53 is connected to pipe 54 and pipe 57 is connected to pipe 58. Thereby, the other port of first heat exchanger 20 is connected to the other port of decompressing device 30, and the other port of second heat exchanger 40 is connected to the suction port of compressor 10. Note that
[0050] When second switching valve 70 is in the fourth state, pipe 57 is connected to pipe 54, and pipe 53 is connected to pipe 58. Thereby, the other port of second heat exchanger 40 is connected to the other port of decompressing device 30, and the other port of first heat exchanger 20 is connected to the suction port of compressor 10.
[0051] When second switching valve 70 is in the fifth state, pipe 54 is connected to pipe 58, and pipe 53 and pipe 57 are disconnected from each other. Thereby, the suction port of compressor 10 is connected to the other port of decompressing device 30, and the other port of first heat exchanger 20 and the other port of second heat exchanger 40 are disconnected from each other.
[0052]
[0053]
[0054] As shown in
[0055] When second switching valve 70 is in the fourth state, as shown in
[0056] When second switching valve 70 is in the fifth state, as shown in
[0057] Referring back to
[0058] Second air blower 90 is configured to be capable of blowing air on the outdoor side as a target not to be cooled (the air will be hereinafter simply referred to as “outdoor air”), in response to a command from controller 100. Further, second air blower 90 is configured to be capable of switching the supply destination of the outdoor air between first heat exchanger 20 and second heat exchanger 40.
[0059] Controller 100 is configured to include a central processing unit (CPU), a memory, and an input/output port through which various signals are input and output. Based on signals from each sensor and device, a program stored in the memory, and the like, controller 100 controls each device (compressor 10, decompressing device 30, first switching valve 60, second switching valve 70, first air blower 80, second air blower 90, and the like) of refrigeration cycle apparatus 1. Note that the control performed by controller 100 is not limited to processing by software and may be performed by dedicated hardware (an electronic circuit).
[0060] [First and Second Cooling Operations]
[0061] In refrigeration cycle apparatus 1, the states of first switching valve 60 and second switching valve 70 are switched to thereby allow switching between the first cooling operation and the second cooling operation.
[0062]
[0063] During the first cooling operation, the refrigerant circulates through compressor 10, first heat exchanger 20, decompressing device 30, and second heat exchanger 40 sequentially in this order, so that first heat exchanger 20 functions as a condenser and second heat exchanger 40 functions as an evaporator. More specifically, the high-temperature and high-pressure refrigerant discharged from compressor 10 flows into first heat exchanger 20 through first switching valve 60. The high-temperature and high-pressure refrigerant exchanges heat with the outside air in first heat exchanger 20, and thus, decreases in temperature and flows out of first heat exchanger 20. The refrigerant flowing out of first heat exchanger 20 is decompressed by decompressing device 30, turns into low-temperature and low-pressure refrigerant, and then, flows into second heat exchanger 40. The low-temperature and low-pressure refrigerant exchanges heat with the outside air in second heat exchanger 40, and thus, rises in temperature and flows out of second heat exchanger 40. The refrigerant flowing out of second heat exchanger 40 is suctioned into compressor 10 through second switching valve 70.
[0064] Thus, during the first cooling operation, the high-pressure refrigerant is distributed through pipes 51 and 52, first heat exchanger 20, and pipes 53 and 54, and the low-pressure refrigerant is distributed through pipes 55 and 56, second heat exchanger 40, and pipes 57 and 58.
[0065] During the first cooling operation, controller 100 controls first air blower 80 and second air blower 90 such that the supply destination of the indoor air is set to second heat exchanger 40 and the supply destination of the outdoor air is set to first heat exchanger 20. This facilitates exchange of heat between first heat exchanger 20 functioning as a condenser and the outdoor air not to be cooled, and also facilitates exchange of heat between second heat exchanger 40 functioning as an evaporator and the indoor air to be cooled. Thereby, the indoor air to be cooled can be efficiently cooled. Note that
[0066]
[0067] During the second cooling operation, the refrigerant circulates through compressor 10, second heat exchanger 40, decompressing device 30, and first heat exchanger 20 sequentially in this order, and thus, second heat exchanger 40 functions as a condenser and first heat exchanger 20 functions as an evaporator. More specifically, the high-temperature and high-pressure refrigerant discharged from compressor 10 flows into second heat exchanger 40 through first switching valve 60. The high-temperature and high-pressure refrigerant exchanges heat with the outside air in second heat exchanger 40, and thus, decreases in temperature and flows out of second heat exchanger 40. The refrigerant flowing out of second heat exchanger 40 is decompressed by decompressing device 30, turns into low-temperature and low-pressure refrigerant, and then, flows into first heat exchanger 20. The low-temperature and low-pressure refrigerant exchanges heat with the outside air in first heat exchanger 20, and thus, rises in temperature and flows out of first heat exchanger 20. The refrigerant flowing out of first heat exchanger 20 is suctioned into compressor 10 through second switching valve 70.
[0068] Thus, during the second cooling operation, the high-pressure refrigerant is distributed through pipes 51 and 56, second heat exchanger 40, and pipes 57 and 54, and the low-pressure refrigerant is distributed through pipes 55 and 52, first heat exchanger 20, and pipes 53 and 58.
[0069] Further, during the second cooling operation, controller 100 controls first air blower 80 and second air blower 90 such that the supply destination of the indoor air is set to first heat exchanger 20 and the supply destination of the outdoor air is set to second heat exchanger 40. This facilitates exchange of heat between second heat exchanger 40 functioning as a condenser and the outdoor air not to be cooled, and also facilitates exchange of heat between first heat exchanger 20 functioning as an evaporator and the indoor air to be cooled. Thereby, also during the second cooling operation, the indoor air to be cooled can be efficiently cooled.
[0070] During the first cooling operation, for example, when the temperature of the refrigerant inside second heat exchanger 40 functioning as an evaporator becomes equal to or lower than 0° C., frost forms on second heat exchanger 40, which makes it difficult for air to flow therethrough, with the result that the heat exchange efficiency in second heat exchanger 40 may deteriorate. Thus, when frost forms on second heat exchanger 40 during the first cooling operation (for example, when the temperature of the refrigerant in second heat exchanger 40 detected by a sensor (not shown) falls below a reference value close to 0° C.), controller 100 determines that switching to the second cooling operation is requested, and then, switches the operation to the second cooling operation. Thereby, second heat exchanger 40 functioning as an evaporator comes to function as a condenser, and thereby, frost forming on second heat exchanger 40 can be removed.
[0071] Further, in the present embodiment, the supply destination of the indoor air is set to first heat exchanger 20 functioning as an evaporator during the second cooling operation, and therefore, cold air can be delivered to the indoor side also during the second cooling operation.
[0072] During the second cooling operation, when frost forms on first heat exchanger 20 functioning as a condenser (for example, when the temperature of the refrigerant in first heat exchanger 20 detected by a sensor (not shown) falls below a reference value close to 0° C.), controller 100 determines that switching to the first cooling operation is requested, and then, switches the operation to the first cooling operation. Thereby, first heat exchanger 20 functioning as an evaporator comes to function as a condenser, and thereby, frost forming on first heat exchanger 20 can be removed.
[0073] [First and Second Switching Operations]
[0074] As described above, during the first cooling operation, the high-pressure refrigerant is distributed in first heat exchanger 20, and the low-pressure refrigerant is distributed in second heat exchanger 40. In contrast, during the second cooling operation, the high-pressure refrigerant is distributed in second heat exchanger 40, and the low-pressure refrigerant is distributed in first heat exchanger 20. Thus, when the operation is switched from one to the other between the first cooling operation and the second cooling operation, the pressure distribution of the refrigerant collapses. This leads to a concern that such a distribution collapse may increase the time required for the refrigeration cycle to stabilize after the operation is switched.
[0075] In view of such a problem, when switching to the second cooling operation is requested during the first cooling operation, controller 100 according to the present embodiment performs the “first switching operation” to bring first switching valve 60 into the second state and bring second switching valve 70 into the fifth state. Then, after the first switching operation is performed for a certain time period, controller 100 switches the operation of refrigeration cycle apparatus 1 to the second cooling operation.
[0076]
[0077] The first switching operation is performed before the first cooling operation is switched to the second cooling operation. Thereby, the refrigerant inside first heat exchanger 20 in which the pressure is raised high during the first cooling operation is recovered into compressor 10, so that the inside of first heat exchanger 20 can be set in the low pressure state. Also, the high-pressure refrigerant from compressor 10 is supplied into second heat exchanger 40 in which the pressure is reduced low during the first cooling operation, so that the inside of second heat exchanger 40 can be set in the high pressure state. In other words, before switching to the second cooling operation, the inside of first heat exchanger 20 can be set in the low pressure state in advance and the inside of second heat exchanger 40 can be set in the high pressure state in advance.
[0078] In particular, during the first switching operation, second switching valve 70 is brought into the fifth state, and thereby, the other port of first heat exchanger 20 and the other port of second heat exchanger 40 are disconnected from each other by second switching valve 70. This can prevent the high-pressure refrigerant and the low-pressure refrigerant from being mixed and equalized in pressure. Thus, as compared with the case where the first cooling operation is simply switched to the second cooling operation, the inside of first heat exchanger 20 can be set in the low pressure state in the early stage, and the inside of second heat exchanger 40 can be set in the high pressure state in the early stage.
[0079] Further, during the first switching operation, controller 100 stops blowing of air by first air blower 80 and second air blower 90. Thus, during the first switching operation, blowing of air into first heat exchanger 20 and second heat exchanger 40 is stopped. Accordingly, the inside of first heat exchanger 20 can be set in the low pressure state in the earlier stage, and the inside of second heat exchanger 40 can be set in the high pressure state in the earlier stage.
[0080] After performing the first switching operation for a certain time period, controller 100 switches the operation of refrigeration cycle apparatus 1 to the second cooling operation. This can reduce the time required for the refrigeration cycle to stabilize after switching to the second cooling operation.
[0081] Further, when switching to the first cooling operation is requested during the second cooling operation, controller 100 according to the present embodiment performs the “second switching operation” to bring first switching valve 60 into the first state and bring second switching valve 70 into the fifth state. Then, after performing the second switching operation for a certain time period, controller 100 switches the operation to the first cooling operation.
[0082]
[0083] The second switching operation is performed before the second cooling operation is switched to the first cooling operation. Thereby, the refrigerant inside second heat exchanger 40 in which the pressure is raised high during the second cooling operation is recovered into compressor 10, so that the inside of second heat exchanger 40 can be set in the low pressure state. Also, the high-pressure refrigerant from compressor 10 is supplied into first heat exchanger 20 in which the pressure is reduced low during the second cooling operation, so that the inside of first heat exchanger 20 can be set in the high pressure state. In other words, before switching to the first cooling operation, the inside of second heat exchanger 40 can be set in the low pressure state in advance and the inside of first heat exchanger 20 can be set in the high pressure state in advance.
[0084] In particular, during the second switching operation, second switching valve 70 is brought into the fifth state, and thereby, the other port of first heat exchanger 20 and the other port of second heat exchanger 40 are disconnected from each other by second switching valve 70. This can prevent the high-pressure refrigerant and the low-pressure refrigerant from being mixed and equalized in pressure. Therefore, the inside of second heat exchanger 40 can be set in the low pressure state in the early stage, and the inside of first heat exchanger 20 can be set in the high pressure state in the early stage.
[0085] Further, during the second switching operation, controller 100 stops blowing of air by first air blower 80 and second air blower 90. Thereby, during the second switching operation, blowing of air into first heat exchanger 20 and second heat exchanger 40 is stopped. Accordingly, the inside of second heat exchanger 40 can be set in the low pressure state in the earlier stage, and the inside of first heat exchanger 20 can be set in the high pressure state in the earlier stage.
[0086] After performing the second switching operation for a certain time period, controller 100 switches the operation of refrigeration cycle apparatus 1 to the first cooling operation. This can reduce the time required for the refrigeration cycle to stabilize after switching to the first cooling operation.
[0087]
[0088] Before time t1, the first cooling operation is performed. During the first cooling operation, controller 100 brings first switching valve 60 into the first state and brings second switching valve 70 into the third state. Further, controller 100 controls first air blower 80 such that the supply destination of the indoor air is set to second heat exchanger 40, and controls second air blower 90 such that the supply destination of the outdoor air is set to first heat exchanger 20.
[0089] When switching to the second cooling operation is requested at time t1 during the first cooling operation, controller 100 switches the operation of refrigeration cycle apparatus 1 from the first cooling operation to the first switching operation. Specifically, controller 100 switches first switching valve 60 from the first state to the second state, and switches second switching valve 70 from the third state to the fifth state. Further, controller 100 stops blowing of the indoor air by first air blower 80 and stops blowing of the outdoor air by second air blower 90.
[0090] At time t2 at which a certain time period has elapsed since the start of the first switching operation, controller 100 switches the operation of refrigeration cycle apparatus 1 from the first switching operation to the second cooling operation.
[0091] Specifically, controller 100 switches second switching valve 70 from the fifth state to the fourth state while maintaining first switching valve 60 in the second state. Further, controller 100 controls first air blower 80 to switch the supply destination of the indoor air from second heat exchanger 40 to first heat exchanger 20, and also controls second air blower 90 to switch the supply destination of the outdoor air from first heat exchanger 20 to second heat exchanger 40.
[0092] When switching to the first cooling operation is requested at time t3 during the second cooling operation, controller 100 switches the operation of refrigeration cycle apparatus 1 from the second cooling operation to the second switching operation. Specifically, controller 100 switches first switching valve 60 from the second state to the first state, and switches second switching valve 70 from the fourth state to the fifth state. Further, controller 100 stops blowing of the indoor air by first air blower 80 and also stops blowing of the outdoor air by second air blower 90.
[0093] At time t4 at which a certain time period has elapsed since the start of the second switching operation, controller 100 switches the operation of refrigeration cycle apparatus 1 from the second switching operation to the first cooling operation. Specifically, controller 100 switches second switching valve 70 from the fifth state to the third state while maintaining first switching valve 60 in the first state. Further, controller 100 controls first air blower 80 to switch the supply destination of the indoor air from first heat exchanger 20 to second heat exchanger 40, and also controls second air blower 90 to switch the supply destination of the outdoor air from second heat exchanger 40 to first heat exchanger 20.
[0094] Also at and after time t5, switching similar to that performed until time t5 is performed.
[0095] As described above, when switching to the second cooling operation is requested during the first cooling operation, controller 100 according to the present embodiment performs the “first switching operation” to bring first switching valve 60 into the second state and bring second switching valve 70 into the fifth state, for a certain time period before switching to the second cooling operation. Thus, as compared with the case where the first cooling operation is simply switched to the second cooling operation, the high-pressure refrigerant and the low-pressure refrigerant can be prevented from being mixed and equalized in pressure during switching of the operation, and also, the operation can be switched to the second cooling operation after the distribution state close to the pressure distribution in the second cooling operation is achieved in advance in the early stage. This can reduce the time required for the refrigeration cycle to stabilize after switching to the second cooling operation. As a result, wasteful energy consumed to stabilize the refrigeration cycle after switching to the second cooling operation can be reduced, to thereby allow energy saving for refrigeration cycle apparatus 1.
[0096] Further, when switching to the first cooling operation is requested during the second cooling operation, controller 100 according to the present embodiment performs the “second switching operation” to bring first switching valve 60 into the first state and bring second switching valve 70 into the fifth state, for a certain time period before switching to the first cooling operation. Thereby, as compared with the case where the second cooling operation is simply switched to the first cooling operation, the high-pressure refrigerant and the low-pressure refrigerant can be prevented from being mixed and equalized in pressure during switching of the operation, and also, the operation can be switched to the first cooling operation after the distribution state close to the pressure distribution in the first cooling operation is achieved in advance in the early stage. This can reduce the time required for the refrigeration cycle to stabilize after switching to the first cooling operation. As a result, wasteful energy consumed to stabilize the refrigeration cycle after switching to the first cooling operation can be reduced, to thereby allow energy saving for refrigeration cycle apparatus 1.
Second Embodiment
[0097]
[0098] Decompressing device 32 and third heat exchanger 42 are disposed between second switching valve 70 and the suction port of compressor 10.
[0099] Decompressing device 32 decompresses the refrigerant from second switching valve 70 and outputs the decompressed refrigerant to third heat exchanger 42. Examples of decompressing device 32 usable herein include a device having a valve body capable of adjusting the degree of opening in response to a command from controller 100, such as an electronic control type expansion valve.
[0100] Third heat exchanger 42 exchanges heat between the refrigerant decompressed by decompressing device 32 and the outside air.
[0101]
[0102] The states of compressor 10, first switching valve 60, second switching valve 70, first air blower 80, and second air blower 90 during each operation are controlled basically in the same manner as that in the above-described first embodiment.
[0103] In refrigerant circuit RCa according to the present second embodiment, however, due to addition of decompressing device 32, during each operation, high-pressure refrigerant is distributed in the circuit extending from the discharge port of compressor 10 to decompressing device 30, medium-pressure refrigerant is distributed in the circuit extending from decompressing device 30 to decompressing device 32, and low-pressure refrigerant is distributed in the circuit extending from decompressing device 32 to the suction port of compressor 10.
[0104] Further, as shown in
[0105] In this way, in the present second embodiment, the indoor air is blown through second heat exchanger 40 and third heat exchanger 42 sequentially in this order during the first cooling operation. Thus, among second heat exchanger 40 and third heat exchanger 42 each functioning as an evaporator during the first cooling operation (i.e., a heat exchanger on which frost may form), second heat exchanger 40 functioning as a condenser after switching to the second cooling operation can be positively covered with frost, and third heat exchanger 42 functioning as an evaporator also after switching to the second cooling operation can be less likely to be covered with frost. As a result, when the operation is thereafter switched to the second cooling operation for defrosting, only second heat exchanger 40 significantly covered with frost can be defrosted, so that an efficient defrosting operation can be performed.
[0106] Further, in refrigerant circuit RCa according to the present second embodiment, the indoor air is blown through first heat exchanger 20 and third heat exchanger 42 sequentially in this order during the second cooling operation, as shown in
[0107] In this way, in the present second embodiment, the indoor air is blown through first heat exchanger 20 and third heat exchanger 42 sequentially in this order during the second cooling operation. Thus, among first heat exchanger 20 and third heat exchanger 42 each functioning as an evaporator during the second cooling operation (i.e., a heat exchanger on which frost may form), first heat exchanger 20 functioning as a condenser after switching to the first cooling operation can be positively covered with frost, and third heat exchanger 42 functioning as an evaporator also after switching to the first cooling operation can be less likely to be covered with frost. As a result, when the operation is thereafter switched to the first cooling operation for defrosting, only first heat exchanger 20 significantly covered with frost can be defrosted, so that an efficient defrosting operation can be performed.
[0108] In refrigerant circuit RCa according to the present second embodiment, an adsorbent (a desiccant material or the like) that adsorbs moisture in air may be applied onto the surfaces of first heat exchanger 20 and second heat exchanger 40. Thereby, moisture in air is adsorbed in first heat exchanger 20 or second heat exchanger 40, so that third heat exchanger 42 can be prevented from being covered with frost.
[0109] For example, during the second cooling operation in which first heat exchanger 20 functions as an evaporator, the moisture in the indoor air is adsorbed by the adsorbent of first heat exchanger 20 when the indoor air flows through first heat exchanger 20. Thus, the indoor air flowing through first heat exchanger 20 and thereafter blown to third heat exchanger 42 is dried. As a result, third heat exchanger 42 can be less likely to be covered with frost.
[0110] Further, the operation is thereafter switched to the first cooling operation to cause first heat exchanger 20 to function as a condenser, and thereby, moisture contained in the adsorbent of first heat exchanger 20 can be released to outdoor air. As a result, the adsorbent of first heat exchanger 20 is dried. Accordingly, when the operation is again switched to the second cooling operation to cause first heat exchanger 20 to function as an evaporator, moisture in the indoor air can be adsorbed again by the adsorbent of first heat exchanger 20.
Third Embodiment
[0111]
[0112] Fourth heat exchanger 44 is disposed between the discharge port of compressor 10 and first switching valve 60. Fourth heat exchanger 44 exchanges heat between the refrigerant discharged from compressor 10 and outside air.
[0113]
[0114] The states of compressor 10, first switching valve 60, second switching valve 70, first air blower 80, and second air blower 90 during each operation are controlled basically in the same manner as that in the above-described second embodiment.
[0115] In the case where frost or moisture adheres to the condenser when first heat exchanger 20 or second heat exchanger 40 functions as a condenser, the heat exchange efficiency of the condenser changes according to the amount of adherence of frost or moisture. Further, since the heat exchanger is used as a condenser, the amount of adherence of frost or moisture may change in accordance with the operation, so that the high pressure inside the condenser changes from moment to moment.
[0116] In view of the above-described point, in refrigerant circuit RCb according to the present third embodiment, fourth heat exchanger 44 is additionally disposed between the discharge port of compressor 10 and first switching valve 60. Thereby, even when the heat exchanger performance of first heat exchanger 20 or second heat exchanger 40 changes, the high pressure can be stably maintained at a constant value.
[0117] Further, as shown in
[0118] [Configuration Examples of First Air Blower 80 and Second Air Blower 90]
[0119] The following describes configuration examples of first air blower 80 and second air blower 90 used in the refrigeration cycle apparatus according to each of the above-described first to third embodiments.
[0120]
[0121] First air blower 80 includes a fan 81, an air path 82, and an air path switch 83.
[0122] Fan 81 operates in response to a command from controller 100, and blows indoor air into air path 82. Air path 82 allows communication between the indoor space to be cooled and each of first heat exchanger 20 and second heat exchanger 40. Air path switch 83 is configured to be capable of switching a supply destination of the indoor air between first heat exchanger 20 and second heat exchanger 40 by switching the path in air path 82 in response to a command from controller 100. Note that the state of air path switch 83 is switched, for example, by driving a motor (not shown).
[0123] Second air blower 90 includes a fan 91, an air path 92, and an air path switch 83 that is shared between first air blower 80 and second air blower 90. Fan 91 operates in response to a command from controller 100, and blows outdoor air into air path 92. Air path 92 allows communication between the outdoor space not to be cooled and each of first heat exchanger 20 and second heat exchanger 40. Air path switch 83 is configured to be capable of switching a supply destination of the outdoor air between first heat exchanger 20 and second heat exchanger 40 by switching the path in air path 92 in response to a command from controller 100.
[0124] During the first cooling operation, air path switch 83 is brought into the state shown in
[0125]
[0126] First air blower 80A is obtained by adding air paths 82a and 82b and air path switches 83a and 83b to the above-described first air blower 80. Second air blower 90A is obtained by adding air paths 92a and 92b and air path switches 83a and 83b, which are shared between second air blower 90A and first air blower 80A, to the above-described second air blower 90.
[0127] Air path 82a is formed to supply the air having passed through first heat exchanger 20 to third heat exchanger 42. Air path 82b is formed to supply the air having passed through second heat exchanger 40 to third heat exchanger 42. Air path 92a is formed to supply the air having passed through first heat exchanger 20 to the outdoors. Air path 92b is formed to supply the air having passed through second heat exchanger 40 to the outdoors.
[0128] Air path switch 83a is configured to be capable of switching, between air paths 82a and 92a, the supply destination of the air having passed through first heat exchanger 20, in response to a command from controller 100. Air path switch 83b is configured to be capable of switching, between air paths 82b and 92b, the supply destination of the air having passed through second heat exchanger 40, in response to a command from controller 100. Note that the states of air path switches 83a and 83b are switched, for example, by driving a motor (not shown).
[0129] During the first cooling operation, air path switches 83, 83a, and 83b are brought into the states shown in
[0130]
[0131] First air blower 80A is the same as first air blower 80A shown in
[0132] Air path 92c is formed to supply the air having passed through first heat exchanger 20 to fourth heat exchanger 44. Air path 92d is formed to supply the air having passed through second heat exchanger 40 to fourth heat exchanger 44.
[0133] During the first cooling operation, air path switches 83, 83a, and 83b are brought into the states shown in
[0134] It should be understood that the embodiments disclosed herein are illustrative and non-restrictive in every respect. The scope of the present disclosure is defined by the terms of the claims, rather than the description above, and is intended to include any modifications within the meaning and scope equivalent to the terms of the claims.
REFERENCE SIGNS LIST
[0135] 1 refrigeration cycle apparatus, 10 compressor, 20 first heat exchanger, 30, 32 decompressing device, 40 second heat exchanger, 42 third heat exchanger, 44 fourth heat exchanger, 51 to 58 pipe, 60 first switching valve, 70 second switching valve, 71 container, 72 valve body, 73 to 75 flow path, 76 rotation axis, 80, 80A, first air blower, 81, 91 fan, 82, 82a, 82b, 92, 92a, 92b, 92c, 92d air path, 83, 83a, 83b air path switch, 90, 90A, second air blower, 100 controller, RC, RCa, RCb refrigerant circuit.