SYSTEM AND METHOD FOR EVALUATION OF THE DEPOSITION IN TUBES OF THE FURNACES OF A DELAYED COKING UNIT
20230168157 · 2023-06-01
Inventors
- Iris Medeiros Junior (Rio de Janeiro, BR)
- Luiz Andre Guedine Santos (Rio de Janeiro, BR)
- Marco Antonio Gomes Teixeira (Duque de Caxias, BR)
- Fernando Garcia Diniz (Rio de Janeiro, BR)
Cpc classification
G01M99/005
PHYSICS
C10G75/00
CHEMISTRY; METALLURGY
International classification
Abstract
The present invention addresses to a system and methodology for evaluating the deposition in tubes of the furnaces of delayed coking unit (DCU) in order to reduce the costs involved with premature shutdowns. With this system, load rankings are obtained, influences of certain loads on processing are evaluated, and additives that reduce deposition are further evaluated. Consequently, the results obtained by such a system allow greater flexibility for the follow-up engineer to optimize his delayed coking unit in order to increase load or increase the unit campaign time, drastically reducing costs in premature shutdowns, or increasing its return by increasing load and shutdowns, since the load is limited by the degree of deposit formation, and that directly affects the wall temperature.
Claims
1- A SYSTEM FOR EVALUATION OF THE DEPOSITION IN TUBES OF THE FURNACES OF A DELAYED COKING UNIT, characterized in that it comprises two jacketed load vessels (1, 7) with a heating system, where the load vessels (1) have temperature gauges (8), a mechanical stirrer (9) in the load vessel (1); a nitrogen vent in the load vessel (7); a piston pump (2), which has a temperature gauge (10) at the inlet; three furnaces (3, 4, 5) arranged in line, where a temperature gauge (15) is coupled at the inlet of the first furnace (3) and other temperature gauges (16, 17) are placed between the furnaces (3, 4, 5), temperature gauges (12, 13, 14) are glued in the middle of the furnaces (3, 4, 5) in the reaction sections; a pressure controller at the inlet (11) of the furnaces; pressure controllers (19) between the furnaces (3, 4, 5); an outlet pressure controller (18); a thermostatic bath not shown and a control and supervision system not shown.
2- THE SYSTEM according to claim 1, characterized in that the load vessels (1, 7) are preferably heated to 380° C. and preferably have an internal volume of 2.6 liters.
3- THE SYSTEM according to claim 1, characterized in that the load vessel (1) is for the sample and the load vessel (7) is for the cleaning fluid.
4- THE SYSTEM according to claim 1, characterized in that the furnaces (3, 4, 5) preferably operate at temperatures of 400° C., 500° C. and 600° C., respectively, with the furnace (5) being able to reach 700° C.
5- THE SYSTEM according to claim 1, characterized in that the furnaces (3, 4, 5) are split, with the section of the inner tube removable and with heating done through electrical resistance cartridges.
6- THE SYSTEM according to claim 1, characterized in that the furnace (5) is composed of two stages, one of which is for heating (hot part) followed by one for cooling (cold part).
7- THE SYSTEM according to claim 1, characterized in that the temperature meters are thermocouples whose signals are converted into 4 to 20 mA signals by temperature transmitters and sent to a PC.
8- THE SYSTEM according to claim 1, characterized in that the pressure controllers contain a sensor element with a 4 to 20 mA transmitter.
9- THE SYSTEM according to claim 1, characterized in that the piston pump has a constant flow rate and is controlled by a current signal (4 to 20 mA).
10- THE SYSTEM according to claim 1, characterized in that the supervision and control system is developed in Elipse or Labview, wherein the PC contains analogue and digital (discrete) inputs and outputs.
11- A METHOD FOR EVALUATION OF THE DEPOSITION IN TUBES OF THE FURNACES OF A DELAYED COKING UNIT, characterized in that it comprises the following steps: 1) Evaluation of leakage with solvent (30 min); 2) Heating of the system lines, as defined in claim 1, with HGO for 45 minutes; 3) Feeding with preheated VR at a temperature of 150° C. for 15 minutes; 4) Gradual heating of the furnaces (3, 4, 5), and start of the test, in which the sample is circulated for 6 hours using ¼ of the nominal pumping capacity of the system (1 liter per hour), under a temperature of 630° C.; 5) End of test—the furnaces (3, 4, 5) are turned off; 6) Removal of the processed VR for 15 minutes; 7) HGO is circulated in the load vessel (1) until it cools down (1 h); 8) HGO removal for 15 minutes; 9) Cleaning with cleaning solvent for 30 minutes; 10) New cleaning with solvent for 30 minutes; 11) Removal of the tubes in each furnace, washing to remove residue from the load and/or HGO and, after drying, they are weighed to verify the amount of deposited material; and installation of new tubes (30 min).
12- THE METHOD according to claim 11, characterized in that the cleaning solvent is limonene or toluene.
Description
BRIEF DESCRIPTION OF THE DRAWINGS
[0022] The present invention will be described in more detail below, with reference to the attached figures which, in a schematic way and not limiting the inventive scope, represent examples of its embodiment. In the drawings, there are:
[0023]
[0024]
[0025]
[0026]
[0027]
[0028]
[0029]
DETAILED DESCRIPTION OF THE INVENTION
[0030] The system of the present invention is intended for the analysis of vacuum distillation residues through the formation of coke on the walls of heated tubes. By exposing the vacuum distillation residue to temperatures above the coking temperature, the process of forming a layer of coke on the walls of the tubes is accelerated. By analyzing the amount of coke formed in the reaction tubes and in the middle of the fluid, the propensity of a given load to form a deposit under refining operating conditions on the walls of the tubes of the delayed coking units is determined.
[0031] Therefore, the system for evaluating the deposition in tubes of the furnaces of a delayed coking unit according to the present invention and illustrated in
[0032] The system consists of three gradual heating sections (400° C., 500° C. and 600° C., the latter being able to reach 700° C.), wherein a certain amount of deposit formed by the vacuum residue sample or other residue of interest will be pumped by the heating battery until the observation of the phenomenon. This phenomenon will be monitored either through the gravimetric measurement of the formed coke (removing the scaled tube or measuring the dispersed coke in the middle of the fluid), or through the amount of energy necessary to keep the fluid outlet temperature constant, or through the pressure differential. At the end of the tests, a database containing the classification between loads is made available.
[0033] The objective of the three sections is to reach a temperature of 400° C. in the first furnace (3) (furnace 1), the temperature at which the pyrolysis reactions are initiated, in the second furnace (4) (furnace 2) to reach 500° C., temperature where the fluid in the DCU leaves the furnace to the drums, which can go up to close to 600° C., if necessary, and another furnace (5) (furnace 3) that reaches 600° C., which would be the film temperature of the tubes in the furnace. Half of furnace 3, furnace (5), has a cooling system through the circulation of a coolant fluid, with the purpose of inhibiting the continuity of coking reactions outside the reaction sections.
[0034] The reaction section tubes used are stainless steel, with ¾″ (19.05 mm) in diameter, are removable and the sealing is performed with a special gasket made of graphite and steel. The section tubes are 15 cm long.
[0035] The system is controlled by a customized supervisory in LabVIEW.
[0036] The pump flow rate is not controlled by the supervisory, but changed manually, and to measure the flow rate, the measurement is made using a valve that is also manual.
[0037] As can be seen in
Test Procedure in the Load Destabilizing Unit (LDU)
[0038] Initially, it is necessary to obtain the mass of the tubes that will be placed in the furnaces. The VR to be used is stored in 3.5 L metal cans, which are also previously weighed to obtain the amount of load discharged into the load vessel. The VR is kept under heating in an oven at 150° C. for at least 12 hours prior to performing the test.
[0039] To avoid quenching of the lines and subsequent clogging of the pipe by the VR at the beginning of the test, heavy gas oil (HGO) is previously circulated. At this moment, the furnaces and the load vessel are heated to 220° C. The heating tapes that cover all the pipes and the pump head are also put into operation; this helps in maintaining the temperature of the fluid. The moment chosen to exchange the HGO for VR is when the temperature stabilization in the sensors is observed at a temperature close to or greater than 100° C.
[0040] Once the line has been heated, the HGO is removed through the fluid removal valve located at the bottom of the system. After the complete removal of the HGO, the VR which is previously heated to 150° C. is discharged into the load vessel. The can, still containing residual VR, is reserved for weighing after its cooling.
[0041] With the VR in circulation, the furnace temperatures are adjusted to the conditions of interest. The VR is maintained in this condition throughout the test.
[0042] The pumping flow rate is manually adjusted. In the pump, there is a small display where it is possible to have a notion of the “stroke” (amount of material admitted by the pump piston), which is directly proportional to the flow rate. The measurement is performed by measuring the amount of VR exhausted in a given time. For this to be done, the valve located before the load vessel is opened, the output of the VR is evaluated and then the material is collected during 30 seconds. After that, the flow rate is calculated. This procedure is repeated twice during the test to ensure that there is no variation in flow rate. The measure is necessary because the pump can vary its flow rate depending on the viscosity of the fluid under test.
[0043] Auxiliary systems are used, such as: a mechanical stirrer that keeps the VR under stirring in the load vessel, in addition to nitrogen ventilation in the load vessel. The objective is to minimize the entry of air into the reaction system and to avoid possible ignitions, due to the presence of an atmosphere rich in hydrocarbons in the load vessel.
[0044] At the end of the test, and after collecting the processed VR, the HGO is again added to the load vessel for cooling the lines and the removal of the residual VR begins.
[0045] There was a predilection for the use of HGO because it has a high boiling point (it avoids intense emanations of vapors if a light solvent is used) and, in addition, it is fluid at temperatures just above room temperature, which facilitates its circulation on the equipment. The HGO is then pumped until the equipment temperature drops and approaches 100° C. At this moment, it is removed and then d-limonene or toluene is added for final cleaning of the lines. The procedure is repeated three times and then the test is considered completed.
[0046] The tubes used in each furnace are removed, washed with toluene to remove load residue and/or HGO and, after drying, are weighed to verify the amount of material deposited. After obtaining the mass, they are visually inspected.
[0047] The processed fluid is subjected to filtration to measure the content of insoluble elements in toluene, and it is considered as coke in suspension.
[0048] In summary, the method for evaluating deposition in tubes of the furnaces of a delayed coking unit comprises: [0049] 1—Evaluation of leakage with solvent (30 min); In this step, the furnaces are checked for leaks with a solvent. [0050] 2—Heating with HGO (45 min); In this step, the heating of the system with heavy gas oil begins. [0051] 3—Feeding with pre-heated VR (15 min); [0052] In this step, the vacuum residue preheated in an oven is poured into the load vessel. [0053] 4—Heating and beginning of the test (6 h); [0054] The desired heating temperatures for the test are set and the run/test is performed. [0055] 5—End of the test—The furnaces are turned off; [0056] In this step, the resistances/furnaces are removed from the operation to start the cooling process. [0057] 6—Removal of the VR (15 min); [0058] In this step, the stressed fluid from the run is removed, and by reducing the amount of vacuum residue in the load vessel, heavy gas oil is poured into the load vessel. [0059] 7—HGO is circulated until it cools down (1 h); [0060] For cooling and to reduce the emanation of vapors, heavy gas oil is circulated, allowing the system to cool and preventing solidification of the vacuum residue. [0061] 8—Removal of the HGO (15 min); [0062] Gas oil is removed from the system. [0063] 9—Cleaning with solvent (30 min); [0064] Limonene or toluene is added to the system to completely remove vacuum residue and gas oil. [0065] 10—New cleaning with solvent (30 min); [0066] To guarantee complete cleaning, as many solvent circulations as necessary are performed. [0067] 11—Removal of tubes and installation of new tubes (30 min). Worn tubes are removed for weighing, inspections and removal of deposited material.
[0068] More specifically, the method for evaluating the deposition in tubes of the furnaces of a delayed coking unit is described having the following parts:
a) Insertion of Samples;
[0069] The Vacuum Distillation Residue samples depend on high temperatures to be in the liquid state. These temperatures can reach 250° C. For this reason, the reservoirs must be heated to 350° C., guaranteeing the good fluidity of the sample at the moment that precedes the beginning of the analysis. There are two reservoirs, one for cleaning fluid and one for sample.
b) Pumping;
[0070] Pumping will take place through a positive displacement pump. This should maintain a constant flow rate controlled by a current signal (4 to 20 mA) and not shear the flow.
c) Heating Furnace System;
[0071] The Heating Furnace System consists of 3 (three) furnaces arranged in line (Furnace 1 (furnace (3)), Furnace 2 (furnace (4)) and Furnace 3 (furnace (5)), where each one has a previously adjusted temperature, a temperature gradient from one furnace to the other is obtained, wherein this gradient increases in the same direction as the flow of the sample. The furnaces are split, with the section of the inner tube removable and with heating done through electrical resistance cartridges.
[0072] Furnace 3, in particular, consists of two stages. One for heating, followed by one for cooling, each stage being identified as hot part and cold part, respectively.
d) Pressure and Temperature Readings;
[0073] The Pressure Readings are only for indication and recording in the supervisory system. The Temperature Readings are both for indication and recording and for control, depending on their role in the process. The temperatures of the furnaces, the tank and the heat exchanger outlet are object of control. The temperatures at the tank outlet, between the furnaces and at the furnace outlet, are only used for indication and recording in the supervisory system.
e) Thermal Exchange System;
[0074] The sequence of operation of the thermal exchange system consists of: [0075] Pre-start of the system, raising the temperatures of the furnaces and the supply reservoir to 350° C., thus guaranteeing the fluidity of the sample; [0076] Filling the sample reservoir with at least 1 liter; [0077] After stabilizing the temperatures, the process starts at the command of the operator (from this moment on, the process takes place automatically); [0078] At the end of the coking process, the cleaning process begins using oils (probably toluene) specified by the operator; [0079] Once cleaned, the tubes are removed from inside the furnaces for analysis.
[0080] The cooling system starts in the second half of the last furnace and takes place through coolant fluid (Ethylene glycol) using a specific bath.
Description of the Supervision and Control System
[0081] The system instrumentation architecture is concentrated in a PC with Human-Machine Interface developed in Elipse E3 or LabView. The PC must have sufficient analog and discrete inputs and outputs to implement the functions described in the supervision and control philosophy and in the description of the control loops.
[0082] The control and/or temperature indication and recording loops use thermocouples as sensor elements and power modules as final control elements. Thermocouple signals are converted into 4 to 20 mA signals by temperature transmitters and sent to the PC to be used in control, indication and records or simply in the indication and records of process variables.
[0083] The system flow rate adjustment is defined as a function of the stroke of the pump plunger. This adjustment is made through a 4 to 20 mA signal. This pump has this resource, which allows us to have a flow rate adjustment proportional to the current (4 to 20 mA that controls the stroke of the plunger).
[0084] Pressure indications and records are obtained through a sensor element with a 4 to 20 mA transmitter encapsulated in the same equipment.
Functioning of Supervision and Control
[0085] The temperature control loops of the furnaces will be executed by the PC, with the necessary analog inputs and outputs resources. The PC will also control the interlocking, generating the respective messages and signals on the HMI.
[0086] For temperature control loops, the PC will receive 4 to 20 mA signals from all temperature transmitters and will generate 4 to 20 mA control signals to drive the respective power modules.
[0087] The PC will also receive the 4 to 20 mA signal from the pressure transmitters, so that the indication and recording in the supervision system can be performed.
[0088] The system is commanded by the operator through the supervision system, which will represent a synoptic form of the system, having all the necessary controls and indicators. The alarms must also be signaled in this system.
[0089] The alarms will be visual and audible, the audible ones being silenced by operator intervention in an alarm acknowledgment operation, an event recorded in the history of the execution of the analysis by the supervision system.
Description of Control Loops
[0090] There are five control loops, namely:
I. Temperatures of the Sample Insertion and Cleaning Reservoir
[0091] The heating of the sample insertion reservoir is done with a thermal tape wrapping the same, powered by a power module. The temperature sensor of this control loop is a thermocouple placed between the thermal tape and the sample insertion reservoir. The control logic is implemented in the PC and the control must operate to keep the reservoir temperature at 350° C.+/−5%.
2. Temperature of Furnace 1
[0092] The temperature of Furnace 1 is kept close to 400° C. through an electrical resistance cartridge installed inside the Furnace, powered by a module and the tube in the center of the furnace. The control logic is implemented in the PC.
3. Temperature of Furnace 2
[0093] The temperature of Furnace 2 is kept close to 500° C. or at another temperature of interest through an electrical resistance cartridge installed inside the Furnace, powered by a power module, whose temperature sensor is a thermocouple inserted between the wall and the tube in the center of the furnace. The control logic is implemented in the PC.
4. Temperature of the Hot Part of the Furnace 3
[0094] The temperature of the Hot Part of Furnace 3 is maintained between 600° C. and 700° C., according to the operator's interest, through an electrical resistance cartridge installed inside the Furnace, powered by a power module, whose temperature sensor is a thermocouple inserted between the wall and the tube in the center of the furnace. The control logic is implemented in the PC.
5. Temperature of the Cold Part of the Furnace 3
[0095] The temperature of the Cold Part of Furnace 3 is controlled through a flow rate control loop. The removal of heat takes place through a heat exchanger using coolant liquid (ethylene glycol), previously cooled in a cryostatic bath. The controlled temperature is that of the outlet of Furnace 3, unlike the others, where the controlled temperature is that of the interface between the inside of the furnace and the tube.
Monitoring and Recording of Pressures and Temperatures
[0096] The purpose of the pressure and temperature transmitters of this process is to monitor and record such variables, in order to build up a history of each type of sample analyzed.
Safety Interlock
[0097] The PC monitors the system variables, generating a visual and audible alarm in the supervisory system, when any of the variables are out of their normal operating ranges. The audible alarms can be silenced by the operator, but the visual ones must remain activated until the variables that originated the same are normalized.
[0098] The PC also executes the safety interlocking logics with the respective signals. The interlock turns off the power modules and turns off the pump motor. The events that can cause this interlock are: activation of the emergency button; high temperature at the furnaces or at the sample insertion reservoir; high pressure at the discharge of the furnaces and the pump.
EXAMPLES
[0099] The following examples are presented in order to more fully illustrate the nature of the present invention and the way to practice the same, without, however, being considered as limiting its content.
Example 1: Tests with ¼ of the Nominal Pump Flow Rate with VR 8017
[0100] The test with vacuum distillation residue (sample VR 8017) was started with HGO for heating the lines. After heating, the HGO was replaced by ˜1.2 Kg of VR 8017, heating the furnaces to temperatures of 500° C. (Furnace 1), 650° C. (Furnace 2) and 400° C. (Furnace 3). The temperatures of the middle of the fluid were also monitored about 20 cm after leaving the furnace, remaining at 267° C. (post Furnace 1), 400° C. (post Furnace 2) and 250° C. (post furnace 3), remembering that the latter has a cooling section.
[0101] This condition mentioned above was maintained, totaling 6:10 h of running. At this time, the furnaces were turned off and the VR was collected in a metal container; then the HGO was circulated through the equipment until it cooled to 100° C.
[0102] At this temperature, the HGO was replaced by the cleaning solvent (limonene). The summary of these conditions is presented in Table 1 below.
TABLE-US-00001 TABLE 1 Test VR 8017 run conditions. Pump Flow Temperature Start End Rate (SP) 07:20 h 08:45 h Max 200° C. Running with VR Pump Flow Start End Rate Total Time 08:50 h 15:00 h 882 g/h 06:10 h Furnace 01 Furnace 02 Furnace 03 Load vessel (TIC-009) (TIC-012) (TIC-015) (TIC-001) 500° C. 630° C. 400° C. 250° C. TT-016 TT-011 TT-014 Fluid Fluid Fluid temperature temperature temperature post- post- post- furnace 3/ TT-007 furnace 1 furnace 2 cooling 70.2° C. 267° C. 425° C. 254° C.
[0103] The following day, the furnaces were opened to remove the tubes and measure their masses, M1. The reactors were washed with toluene and, after drying, they were weighed again, M2. The material released during washing was quantified by filtration through a 0.45 μm PTFE membrane, M3. The results can be evaluated in Table 2.
TABLE-US-00002 TABLE 2 Results of the content of material deposited in the tubes of the equipment. M1 M2 M3 Mtotal % in relation Tubes (g) (g) (g) (g) to the load 1 0.0903 0.0307 0.0186 0.0493 0.004 2 23.7233 19.1723 0.458 19.6303 1.636 3 0.3323 0.1343 0.0214 0.1557 0.013 M1—Total of post-run aggregated solid containing solvent (g); M2—Total of solids in the tubes after washing with toluene (g); M3—Total of solids released during washing (g).
[0104] From the result shown in Table 2, it is observed that there was deposition only in Tube 2, and visually the highest concentration of solid present was in the final part of the tube.
[0105] The less aggregated solids, which came off during washing, and the deposited materials that were removed from the tubes with a spatula, called intermediates (material deposited in Tube 2 on the inside—face facing the fluid side; and aggregate material deposited in Tube 2—material facing the tube), were sent for evaluation by thermogravimetry to verify if it really was coke, and also to verify the presence of inorganic material.
[0106] The results of this run indicate that the unit generates a deposit with a visual appearance of coke.
Example 2: SEM-EDS of the Material Deposited in the VR 8017 Reaction Tube
[0107] The sample of the solid less aggregated to the tube wall (test Mar. 29, 2016) was analyzed by SEM-EDS. The image obtained is available in
TABLE-US-00003 TABLE 3 Composition by SEM-EDS of solids less aggregated to the tube wall Mar. 29, 2016. Elements % (m/m) % atomic Carbon 96.619 97.819 Oxygen 2.361 1.794 Sulfur 1.020 0.387
[0108] It is observed by the results presented in Table 3 that the material analyzed is composed mainly of coke ordinary carbon. There is a white spot indicated in
TABLE-US-00004 TABLE 4 Composition by SEM-EDS of solids less aggregated to the tube wall Mar. 29, 2016 occasionally reported in FIG. 16 as Spectrum 2. Elements % (m/m) % atomic Iron 42.664 16.319 Oxygen 37.267 49.759 Carbon 18.505 32.912 Sulfur 0.470 0.313 Aluminum 0.388 0.307 Phosphorus 0.384 0.265 Manganese 0.322 0.125
[0109] From the result, it can be mentioned that it is iron oxide. The same was done for the gray area at the bottom of
TABLE-US-00005 TABLE 5 Compositional result of the gray part shown in FIG. 16 of the solids less aggregated to the tube wall Mar. 29, 2016. Element % (m/m) % atomic Oxygen 51.946 68.079 Aluminum 20.400 15.853 Silicon 2.181 1.629 Sulfur 13.555 8.864 Chlorine 3.363 1.989 Calcium 2.532 1.325 Iron 6.021 2.261
[0110] It is observed by the results of Table 5 that the material is mostly aluminum oxide.
[0111] In summary, it is possible to say that the deposited material is coke, and has spots possibly containing iron oxide, which is not necessarily the iron of the load, and may come from the piping. In addition, in another point of the aggregated solids, the presence of aluminum oxide was verified.
[0112] The sample facing the wall, side adhered to the wall, was also evaluated by SEM-EDS. The image obtained is reported in
TABLE-US-00006 TABLE 6 Dark color composition found in the material facing the tube wall. Elements % (m/m) % atomic Carbon 92.496 97.041 Oxygen 1.489 1.173 Sulfur 2.517 0.989 Chrome 0.452 0.110 Iron 3.046 0.687
TABLE-US-00007 TABLE 7 Lighter color composition (grey) found in the material facing the tube wall. Elements % (m/m) % atomic Carbon 66.832 87.035 Oxygen 1.721 1.683 Sulfur 11.711 5.713 Chromium 2.395 0.720 Manganese 0.310 0.088 Iron 16.343 4.577 Nickel 0.689 0.184
TABLE-US-00008 TABLE 8 Lighter color composition (white) found in the material facing the tube wall. Elements % (m/m) % atomic Carbon 41.844 71.111 Oxygen 3.284 4.190 Sulfur 16.938 10.783 Chrome 2.687 1.055 Iron 34.020 12.434 Nickel 1.226 0.426
[0113] It can be seen from the results presented in Table 6 that the material is mostly coke, the darkest part of the sample, and there is an increase in the concentration of iron and sulfur in the lighter parts, Tables 7 and 8.
[0114] The sample facing the fluid, internal part, was also evaluated by SEM-EDS. The image obtained is shown in
TABLE-US-00009 TABLE 9 Composition found in the material facing the fluid with less spongy appearance. Element % (m/m) % atomic Carbon 95.701 97.130 Oxygen 3.238 2.467 Sulfur 1.061 0.403
[0115] It is observed from the results presented that the material facing the fluid has in its composition mostly carbon. And everything indicates that the material is coke. To confirm these results, this last sample was also evaluated by thermogravimetry (TGA). The obtained thermogram can be evaluated in
[0116] It is observed by the TGA that the sample still has a certain loss of material when it is heated under an inert atmosphere up to 700° C.; however, after reaching this temperature, about 90% of this is lost when air is added, when the material is burned. This result is compatible with coke samples.
[0117] From the results presented, it can be affirmed that the system is managing to generate coke in the tubes under the established test conditions.
Example 3: System Repeatability Evaluation (LDU)
[0118] To evaluate whether the LDU would be reproducing the results, the VR PP 8176 was subjected to several runs on the equipment, in which all runs were close to 1000 grams per hour. The results obtained are reported in Table 10. For comparison purposes, the content of toluene-insoluble material was measured in the load and the value obtained was 0.03%.
TABLE-US-00010 TABLE 10 Results of repetitions in LDU with VR 8176. VR 8176 Jan. 5, Jan. 16, May 3, May 25, 2017 2017 2017 2017 Flow rate (g/h) 1087 948 922 911 Insoluble Elements in 0.06 0.51 0.51 0.39 Toluene - Stressed Load (%) VR amount (g) 1440 1410 1131 1256 Content of material deposited 14.3 15.3 15.1 13.2 in the tube (g) Content of material deposited 9.91 10.9 13.4 10.5 in the tube g/Kg of VR Content of material dispersed 0.49 6.78 5.37 4.46 in the fluid (g) Total solid material content 14.8 22.1 20.5 17.6 (pipe + insoluble elements dispersed in the tube) g
[0119] The results shown in Table 10 indicate that the content of material deposited in the tube is repetitive (“Content of material deposited in the tube (g)”), with a standard deviation of 0.98 g. Another evaluation made was to obtain the contents of elements insoluble in toluene in the stressed fluid. With the exception of the first listed sample, the total solids values are in the same order of magnitude.
[0120] To evaluate whether small variations in flow would linearly interfere with the amount of material formed in the tube, the graph in
[0121] It can be seen from the graph that the result does not indicate a direct relation between the amount of deposit in relation to the flow rate, when there is a small variation in the flow rate.
Evaluation of VR 8017 and RASF
[0122] The sample of VR 8017 obtained at REVAP and named by the PP as 8017 was submitted to the run at the LDU; the conditions and results obtained can be evaluated in Table 11.
TABLE-US-00011 TABLE 11 Results of LDU runs with VR 8017. RUNNING VR 8017 Mar. 29, Jul. 27, 2016 2016 Flow rate (g/h) 882 828 Toluene-insoluble elements (%) 0.153 0.155 Amount - VR (g) 1112.5 1479.9 Mass of material deposited in the tube (g) 20.3 18.7 Mass of material deposited in the tube g/Kg 18.3 12.6 of VR Mass of material dispersed in the fluid (g) 1.49 2.01 Mass of solid material (tube + insoluble 21.8 20.7 elements) g
[0123] It is observed in Table 11 that the result seems repetitive, there is no significant variation between replicates.
[0124] In order to be more confident that the equipment would form deposits in the same proportion as the expected degree of deposit formation for a given load, a RASF was obtained and duplicate runs were performed. The conditions used along with the obtained results are reported in Table 12.
TABLE-US-00012 TABLE 12 Results obtained with RASF. RASF Jun. 21, Jun. 27, 2017 2017 Flow rate (g/h) 1002 990 Toluene-insoluble elements (%) 5.18 3.92 Amount - VR (g) 1753 1460 Mass of material deposited in the tube (g) 5.38 10.97 Mass of material deposited in the tube g/Kg 3.1 7.5 of VR Mass of material dispersed in the stressed 90.5 57.0 fluid (g) Mass of solid material (tube + insoluble 95.9 68.0 elements in the stressed fluid) (g) Mass of solid material (tube + insoluble 54.7 46.6 elements in the stressed fluid) g/Kg of VR
[0125] From the results presented in Table 12, it is observed that the amount of material deposited in the tube was very low, but the amount of coke dispersed in the fluid was very high. There was a great difference between the duplicates and there is still no explanation for what happened because the main influence is the temperature and it was kept constant and equal between the duplicates.
Example 2: Ranking of Runs
[0126] For a better evaluation and comparison of the coke contents formed in the tube, the graph shown in
[0127] It can be seen from
[0128] With the obtained data, it is considered that the tendency to deposition between the studied samples was: VR 8176<VR 8017<RASF.
Example 3: Methodology for Operating the System
[0129] The load is circulated for 6 hours using a quarter of the nominal pumping capacity of the equipment, close to 1 liter per hour, under a temperature of 630° C. in the reaction region, compatible with the order of magnitude of the wall temperature of the DCUs. At flow rates greater than 1.1 liters per hour, a quarter of the pump nominal flow rate, toluene-insoluble material (coke) is formed, which is dispersed in the fluid, but no material deposition occurs in the reaction region.
[0130] The samples of VR 8017 and VR 8176, and RASF were tested in this condition and, from the amount of deposited material, the differences between the loads were evaluated. Enough differences were evidenced to obtain a ranking between the samples.
[0131] It was observed by the replicas of the VR 8176 that the equipment is repetitive in terms of the amount of material deposited in the tube, with a standard deviation of 1 g.
[0132] Statistically, the results between the runs of VR 8176 and VR 8017 are different from each other, with a confidence interval of 95%. Based on this evaluation, it was possible to compare the samples. The comparison showed that VR 8176 has the lowest propensity to form deposits, followed by VR 8017 and finally RASF.
[0133] The RASF showed a completely different behavior from the VRs; a more intense deposition was expected because it is a stream richer in coke precursor material, which was not observed in the prototype reaction tube. There was formation of coke, but this was detached and was practically all dispersed in the fluid.
[0134] It should be noted that, although the present invention has been described in relation to the attached drawings, it may undergo modifications and adaptations by technicians skilled on the subject, depending on the specific situation, but provided that it is within the inventive scope defined herein.