POWER GENERATION FACILITY OPERATION DEVICE AND OPERATION METHOD
20170310115 · 2017-10-26
Assignee
Inventors
Cpc classification
F05B2270/335
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
Y02E10/76
GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
Y02E10/56
GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
H02J3/466
ELECTRICITY
H02J3/004
ELECTRICITY
H02J3/008
ELECTRICITY
Y04S10/50
GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
Y04S50/10
GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
F03D7/0284
MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
International classification
H02J3/46
ELECTRICITY
H02J3/38
ELECTRICITY
Abstract
A power generation facility operation device includes an opportunity loss calculator for calculating a power generation opportunity loss value, (a loss value resulting from losing the power generation opportunity when output of the power generated from a power generation facility is reduced according to a request for provision of reserve power desired by an electric power provider), a reserve power incentive calculator for calculating a reserve power incentive value, (a value equivalent to an incentive obtained by the electric power producer from the electric power provider by output control being performed in the power generation facility and the reserve power being supplied to the electric power provider, and a reserve power plan calculator for calculating a plan of the reserve power that the power generation facility is to secure in order to keep the power generation opportunity loss value below the reserve power incentive value.
Claims
1. A power generation facility operation device that is employed by an electric power producer for supplying power to a transmission grid, the device comprising: power generation opportunity loss value calculation means for calculating a power generation opportunity loss value, which is a loss value resulting from losing the power generation opportunity when output of the power generated from a power generation facility that is owned by the electric power producer is reduced according to a request for provision of reserve power desired by an electric power provider; reserve power incentive value calculation means for calculating a reserve power incentive value, which is an equivalent value that is equivalent to an incentive obtained by the electric power producer from the electric power provider by output control being performed in the power generation facility that is owned by the electric power producer and the reserve power being supplied to the electric power provider; and reserve power plan calculation means for calculating a plan of the reserve power that the power generation facilities are to secure in order to keep the power generation opportunity loss value below the reserve power incentive value.
2. The power generation facility operation device according to claim 1, wherein the power generation opportunity loss value calculation means calculates a power generation opportunity loss value by multiplying a power unit price by a differential output of power generation output during maximum output driving according to a predicted amount of the time in an energy state that is input to the power generation facility and power generation output during predetermined output reduction driving by the power generation facility.
3. The power generation facility operation device according to claim 1, wherein the reserve power incentive value calculation means calculates a reserve power incentive value by multiplying a power unit price of the reserve power by a differential output of power generation output during maximum output driving according to a predicted amount of the time in an energy state that is input to the power generation facility and power generation output during predetermined output reduction driving by the power generation facility.
4. The power generation facility operation device according to claim 1, wherein the reserve power plan calculation means performs size comparison of the power generation opportunity loss value and the reserve power incentive value at the time and calculates a reserve power plan amount with respect to the power generation facility in order to keep the power generation opportunity loss value below the reserve power incentive value.
5. The power generation facility operation device according to claim 4, further comprising: power generation facility output control means for sending a control signal for electrically or mechanically controlling the output operation of the power generation facility with respect to the control device that controls the power generation facility based on the reserve power plan amount at the time that is output by the reserve power plan output means.
6. The power generation facility operation device according to claim 4, wherein the reserve power plan amount that is output by the reserve power plan output means is indicated with respect to an output device in time series.
7. The power generation facility operation device according to claim 1, wherein a reserve power plan that is calculated by the reserve power plan calculation means sets the generated power that has reduced output as a planned value when the power generation opportunity loss value is below the reserve power incentive value and sets output generated power during maximum output driving according to a predicted amount of the time in an energy state that is input to the power generation facility when the power generation opportunity loss value is above the reserve power incentive value.
8. (canceled)
9. A power generation facility operation method that is employed by an electric power producer for supplying power to a transmission grid, the method comprising: calculating a power generation opportunity loss value, which is a loss value resulting from losing the power generation opportunity, when output of the power generated from a power generation facility that is owned by the electric power producer is reduced according to a request for provision of reserve power desired by an electric power provider; calculating a reserve power incentive value, which is an equivalent value that is equivalent to an incentive obtained by the electric power producer from the electric power provider by output control being performed in the power generation facility that is owned by the electric power producer and the reserve power being supplied to the electric power provider; and calculating a power generation plan of the power generation facility using the power generation opportunity loss value and the reserve power incentive value.
10. The power generation facility operation method according to claim 9, wherein the power generation facility that is owned by the electric power producer is controlled according to the calculated reserve power plan.
11. (canceled)
12. A power generation facility operation method that is employed by an electric power producer for supplying power to a transmission grid, the method comprising: determining whether or not to accept a request for provision of reserve power from an electric power provider by comparing a power generation value that is determined by an electric power purchase unit price and a reserve power value that is determined by a reserve power unit price when the reserve power is provided to the electric power provider.
13. The power generation facility operation device according to claim 2, wherein the reserve power incentive value calculation means calculates a reserve power incentive value by multiplying a power unit price of the reserve power by a differential output of power generation output during maximum output driving according to a predicted amount of the time in an energy state that is input to the power generation facility and power generation output during predetermined output reduction driving by the power generation facility.
14. The power generation facility operation device according to claim 2, wherein the reserve power plan calculation means performs size comparison of the power generation opportunity loss value and the reserve power incentive value at the time and calculates a reserve power plan amount with respect to the power generation facility in order to keep the power generation opportunity loss value below the reserve power incentive value.
15. The power generation facility operation device according to claim 3, wherein the reserve power plan calculation means performs size comparison of the power generation opportunity loss value and the reserve power incentive value at the time and calculates a reserve power plan amount with respect to the power generation facility in order to keep the power generation opportunity loss value below the reserve power incentive value.
16. The power generation facility operation device according to claim 5, wherein the reserve power plan amount that is output by the reserve power plan output means is indicated with respect to an output device in time series.
17. The power generation facility operation device according to claim 2, wherein a reserve power plan that is calculated by the reserve power plan calculation means sets the generated power that has reduced output as a planned value when the power generation opportunity loss value is below the reserve power incentive value and sets output generated power during maximum output driving according to a predicted amount of the time in an energy state that is input to the power generation facility when the power generation opportunity loss value is above the reserve power incentive value.
18. The power generation facility operation device according to claim 3, wherein a reserve power plan that is calculated by the reserve power plan calculation means sets the generated power that has reduced output as a planned value when the power generation opportunity loss value is below the reserve power incentive value and sets output generated power during maximum output driving according to a predicted amount of the time in an energy state that is input to the power generation facility when the power generation opportunity loss value is above the reserve power incentive value.
19. The power generation facility operation device according to claim 4, wherein a reserve power plan that is calculated by the reserve power plan calculation means sets the generated power that has reduced output as a planned value when the power generation opportunity loss value is below the reserve power incentive value and sets output generated power during maximum output driving according to a predicted amount of the time in an energy state that is input to the power generation facility when the power generation opportunity loss value is above the reserve power incentive value.
20. The power generation facility operation device according to claim 5, wherein a reserve power plan that is calculated by the reserve power plan calculation means sets the generated power that has reduced output as a planned value when the power generation opportunity loss value is below the reserve power incentive value and sets output generated power during maximum output driving according to a predicted amount of the time in an energy state that is input to the power generation facility when the power generation opportunity loss value is above the reserve power incentive value.
Description
BRIEF DESCRIPTION OF DRAWINGS
[0028]
[0029]
[0030]
[0031]
[0032]
[0033]
[0034]
[0035]
[0036]
[0037]
[0038]
[0039]
[0040]
[0041]
[0042]
[0043]
DESCRIPTION OF EMBODIMENTS
[0044] A power generation facility operation device and a method according to embodiments of the present invention will be described below with reference to the drawings.
Embodiment 1
[0045]
[0046] The input device 104 is an interface for carrying out a predetermined instruction by the electric power producer that is a user in the power generation facility operation device 100. For example, the input device 104 is constituted by a keyboard, a mouse, a touch panel and/or a button, and the like.
[0047] The output device 105 is an interface for providing predetermined information to the electric power producer that is a user from the power generation facility operation device 100. For example, the output device 105 is constituted by a display and the like.
[0048] The storage device 106 is a storage device that is provided associated with the power generation facility operation device 100 that is a calculator main body. Various setting values or various process results that are necessary for calculation in the calculator, a computer program that stores process content in the calculator, and the like are held in the storage device 106. Note that, the storage device 100 may be configured within the calculator main body.
[0049] For example, the process functions (process means) 101, 102, and 103 according to the power generation facility operation device 100 is realized using a central processing unit (CPU) and a memory (neither shown in the drawings) that the power generation facility operation device 100 is provided with. For example, the CPU realizes functions according to each component described above 101, 102, and 103 by reading out the predetermined computer program from the storage device 106 in the memory.
[0050]
[0051] For example, electric power system reserve power plan data D1 that is a plan value of the reserve power that is necessary for the electric power system is acquired from the electric power system operator organization 108. Note that, the user may acquire from the storage device 106 the electric power system reserve power plan data D1 that is stored therein in advance using the input device 104.
[0052] In addition, the equivalent value that is obtained in a case where the reserve power is secured, that is, the incentive value unit price data D2 is acquired from the electric power trading market 203. Note that, the user may acquire from the storage device 106 the incentive value unit price data D2 that is stored therein in advance using the input device 104.
[0053] In addition, the power generation facility reserve power plan data D3 of the power generation facility that is a target is created and stored in the storage device 106. Note that, the power generation facility reserve power plan data D3 of the creation result may be transmitted to the electric power system operator organization 108. Furthermore, the power generation facility operation device 100 may transmit the created power generation facility reserve power plan data D3 to a power generation facility controller 205, which is equipment of the electric power producer, of the target power generation facility.
[0054] In addition, the power generation facility operation device 100 acquires input energy predicted data D4 that relates to prediction of the amount of input of the energy source that it input to the target power generation facility from an external organization such as the fuel procurement organization 207 or the weather forecasting organization 208 with respect to the power generation facility. Note that, in the acquisition, the user may acquire from the storage device 106 data that is stored therein in advance using the input device 104.
[0055] Note that, information which relates to prediction of the amount of input of the energy source that is input to the power generation facility is acquired from the fuel procurement organization 207 of heating fuel in a case where the target power generation facility is a heating power generation facility. In addition, in a case where the target power generation facility is a solar power generation facility or a wind power generation facility, the information is obtained from the weather forecasting organization 208 that handles the predicted data of an amount of solar radiation and wind conditions.
[0056] In the power generation facility operation device 100, power generation opportunity loss value data D6 and reserve power incentive value data D7 are created and stored in the storage device 106 as a result of the processes in each means 101, 102, and 103 in
[0057]
[0058]
[0059]
[0060]
[0061]
[0062] The electric power producer calculates the advantages and disadvantages of the electric power producer when determining the power generation facility reserve power plan data D3. An advantage of the electric power producer according to reserve power security is calculated from the incentive value unit price data D2.
[0063]
[0064]
[0065]
[0066]
[0067] According to the explanation in
[0068] In initial process step S101 of the power generation opportunity loss value calculation means 101, the electric power producer that is the user acquires from the storage device 106 the electric power system reserve power plan data D1 (refer to
[0069] In subsequent process step S102, the user acquires from the storage device 106 the time series input energy predicted data D4 of the power generation facility (refer to
[0070] Using the obtained data D1 and D4 described above, in the process flow of the power generation opportunity loss value calculation means 101, the process steps (S104 to S108) are executed in each process time within a plan creation target period within a range that is interposed by the process step S103 and the process step S109. In an example such as in
[0071] First, in the process step S104, as a calculation method of a specific power generation opportunity loss value, a maximum output value Pmax(t) of the power generation facility is created as time series information from a power conversion value Peng(t) (603 in
[0072] In subsequent process step S105, the sizes of the previously obtained maximum output value Pmax(t) at the time t and the necessary reserve power value PSres(t) (303 in
[0073] In process step S106, in a case where the maximum output value Pmax (t) is large to be the necessary reserve power Pres (t) or more, the necessary reserve power PSres(t) is calculated as an assumed output reduction value Psus(t). Note that, in a case where the maximum output value Pmax (t) is the necessary reserve power Pres (t) or less, the process ends in the process time, and the process transitions to the process of the subsequent time.
[0074] Subsequently, in process step S107, a selling price POpri(t) per unit of power of the generated power of the time is acquired from the storage device 106 in which the price data is stored in advance, or for example, refers to the price data acquiring from an external organization such as the electric power trading market 203. Note that, the selling price POpri(t) per unit of power is a so-called power purchase price. The purchase price per unit power that is set in a case where power is sold by the electric power producer to the electric power provider.
[0075] In process step S108, a power conversion value VALopt (t) of a power generation opportunity loss value is calculated from the product of the selling price POpri per unit of power of the generated power and the assumed output reduction value Psus (t).
[0076] In process step S109, power generation opportunity loss value data D6 is created in time series by calculating the processes from process step S104 to process step S108 in each time within a plan creation target time.
[0077] In the final process step S110, the power generation opportunity loss value data in time series is stored in the storage device 106.
[0078]
[0079] In initial process step S201 of the reserve power incentive value calculation means 102, first, the electric power producer that is the user inputs and stores the electric power system reserve power plan data D1 (refer to
[0080] In subsequent process step S202, the user acquires from the storage device 106 the time series input energy predicted data D4 of the power generation facility (refer to
[0081] Using the obtained data D1 and D4 described above, in the process flow of the power generation opportunity loss value calculation means 101, the process steps (S204 to S208) are executed in each process time within a plan creation target period within a range that is interposed by the process step S203 and the same process step S209. In an example such as
[0082] First, in the process step S204, as a calculation method of a specific reserve power incentive value, a maximum output value Pmax (t) of the power generation facility is created as time series information from a power conversion value Peng (t) (603 in
[0083] In subsequent process step S205, the sizes of the previously obtained maximum output value Pmax (t) at the time t and the necessary reserve power PSres (t) (303 in
[0084] In process step S206, in a case where the maximum output value Pmax (t) is large to be the necessary reserve power Pres (t) or more, the necessary reserve power PSres (t) is calculated as an assumed output reduction value Psup (t). In addition, in a case where the maximum output value Pmax (t) is the necessary reserve power Pres (t) or less, the process ends in the process time, and the process transitions to the process of the subsequent time.
[0085] In process step S207, a selling price PRpri (t) per unit of reserve power of the time is stored in advance in the storage device 106 and the price data is acquired from the storage device 106, or for example, refers to the price data acquiring from an external organization such as the electric power trading market 203. In
[0086] The electric power provider purchases power of the electric power producer according to the normal purchase price, but also there is an operator in configuring members of the electric power trading market 203 who considers to want to purchase power at a higher price at the same time, and here a value that is obtained when power is sold to the operator is considered.
[0087] In the subsequent process step S208, a reserve power incentive value VALinc (t) is calculated from the product of the selling price PRpri per unit of power of the reserve power and the assumed output reduction value Psup (t).
[0088] In the final process step S210, the reserve power incentive value data D7 in time series is stored in the storage device 106.
[0089]
[0090] In the process step S304, in each time within the plan creation target time, the sizes of the power generation opportunity loss value VALopt (t) and the incentive value VALinc (t) at the time are compared.
[0091] In the process step S305, when the power generation opportunity loss value VALopt (t) is not more than the incentive value VALinc (t) , the maximum output value Pmax (t) is registered in a planned reserve power value PPres (t). Note that, when the power generation opportunity loss value VALopt (t) is not less than the incentive value VALinc (t), the value is held at the predicted maximum output value Pmax (t).
[0092] Power generation facility reserve power plan data is created in time series by calculating the process steps from process step S304 to process step S305 in each time within a plan creation target time.
[0093] In the final process step S307, the power generation facility reserve power plan data D3 is stored in time series in the storage device 106.
[0094]
[0095] In
[0096] In addition, D2 that is indicated by a thin solid line is the incentive value unit price data, and is equivalent to the incentive value unit price PRinc(t) [¥/kWh] that indicates an increase and decrease in time series in the explanation in
[0097] In addition, in
[0098] Meanwhile, the amount of reduction of output is converted to the reserve power incentive value data based on the incentive value unit price data D2 that is obtained from the electric power trading market 203.
[0099] According to the approach of the processes described above, finally the power generation opportunity loss value data that is obtained by the flow of
[0100] In the process in
[0101] To be brief, the power generation facility reserve power plan data D3 is a plan value to adopt either a reduced output for securing the reserve power or a maximum output. Adopting either the reserve power or the maximum output that is set according to a time band in the power generation facility is determined based on whether [power generation opportunity loss value data]≦[reserve power incentive value data] holds true or does not hold true.
[0102] In a case of the example that is indicated in
[0103] Note that, when performing the determination described above, the size relationship of the facility output is a size relationship of rated output>maximum output (according to input energy of wind, solar radiation, fuel, and the like)>reduced output.
[0104] In addition, the process described above exemplifies application of wind power, solar light, and industrial thermal power, but needless to say, it is possible to apply to another facility if the facility belongs to the electric power producer, and is able to supply reserve power to the electric power provider. For example, application is possible even in nuclear power, discharge of a storage battery, or the like if there is mutual agreement.
Embodiment 2
[0105]
[0106] Since basic content in the present device is the same as indicated in embodiment 1, here, added function parts are described. First, the power generation facility output control means 1201 accumulates various sensor information from the power generation facility sensor 1002 based on an assumed power generation reserve power value of the time of the power generation facility reserve power plan data D3 that is output by the reserve power plan output means 103, and sends the control signal for electrically and/or mechanically controlling the output operation of the power generation facility with respect to the power generation facility controller 1203.
[0107] In a case where the target power generation facility is a wind farm that has a plurality of windmills, data which relates to function characteristics of each windmill is stored in the storage device 106, an output value, a rotor rotational speed, wind speed, and the like at the time is read out in real time from the sensor of the windmills along with data which relates to the function characteristics, and the control signal is transmitted such that an output value is issued that is equal to the planned reserve power value of the power generation facility reserve power plan data at the time with respect to a wind farm controller that performs distribution control in each windmill such that the entire output of the wind farm matches a target value.
[0108]
[0109] In addition, other than the power generation facility reserve power plan data D3, the electric power system reserve power plan data D1, the incentive value unit price data D2, the input energy predicted data D4, the power generation opportunity loss value data D6, and the reserve power incentive value data D7 may be displayed individually or in combination in the output device 104 in time series.
[0110] Note that, there is correspondence of a case in which No is determined in process step S105 in
REFERENCE SIGNS LIST
[0111] 100 POWER GENERATION FACILITY OPERATION DEVICE
[0112] 101 POWER GENERATION OPPORTUNITY LOSS CALCULATION MEANS
[0113] 102 RESERVE POWER INCENTIVE VALUE CALCULATION MEANS
[0114] 103 RESERVE POWER PLAN OUTPUT MEANS
[0115] 104 INPUT DEVICE
[0116] 105 OUTPUT DEVICE
[0117] 106 STORAGE DEVICE
[0118] 107 COMMUNICATION NETWORK
[0119] 108 ELECTRIC POWER SYSTEM OPERATOR ORGANIZATION
[0120] 203 ELECTRIC POWER TRADING MARKET
[0121] 207 FUEL PROCUREMENT ORGANIZATION
[0122] 208 WEATHER FORECASTING ORGANIZATION
[0123] 205 POWER GENERATION FACILITY CONTROLLER
[0124] 1101 POWER GENERATION FACILITY OUTPUT CONTROL MEANS
[0125] 1102 POWER GENERATION FACILITY SENSOR