Process Control of Electron Beam Wire Additive Manufacturing
20170297140 · 2017-10-19
Inventors
- Karen M. Taminger (Yorktown, VA, US)
- ROBERT A. HAFLEY (YORKTOWN, VA, US)
- Joseph N. Zalameda (Poquoson, VA)
- CHRISTOPHER S. DOMACK (CARROLLTON, VA, US)
- Brian L. Taminger (Yorktown, VA, US)
- ERIC R. BURKE (YORKTOWN, VA, US)
- Richard E. Martin (Yorktown, VA, US)
- William J. Seufzer (Yorktown, VA, US)
- Theresa A. Butler (Yorktown, VA, US)
Cpc classification
B23K15/0086
PERFORMING OPERATIONS; TRANSPORTING
B23K15/002
PERFORMING OPERATIONS; TRANSPORTING
B23K2103/26
PERFORMING OPERATIONS; TRANSPORTING
B23K15/0093
PERFORMING OPERATIONS; TRANSPORTING
B23K15/0006
PERFORMING OPERATIONS; TRANSPORTING
International classification
Abstract
A method of controlling operation of an electron beam gun and wire feeder during deposition of pools of molten matter onto a substrate to form beads upon solidification of the molten matter. The method includes providing a substrate and a wire source. A molten pool of liquid phase metal is formed on the substrate by melting the wire utilizing an electron beam generated by an electron beam gun. The liquid metal solidifies into a solid phase. A controller utilizes data from a sensor to adjust a process perimeter based, at least in part, on data generated by the sensor.
Claims
1. A method of controlling operation of an electron beam gun and wire feeder during a deposition process including deposition of pools of molten metal onto a substrate to form beads upon solidification of the molten metal, the method comprising: providing a substrate; providing a wire source that feeds wire at a wire feed rate; moving the electron beam gun and/or the wire feeder relative to the substrate at a travel speed; forming a molten pool of liquid phase metal on the substrate by melting wire utilizing an electron beam generated by an electron beam gun at a beam power; cooling the liquid phase metal to form a solidified deposit; utilizing a sensor to generate data related to at least one of: 1) a thermal transient; 2) wire alloy physical properties and/or melting range; 3) a width of the molten pool; 4) tracking of the wire and/or the molten pool; and 5) flaws in the solidified metal; and adjusting a deposition process parameter based, at least in part, on the data generated by the sensor.
2. The method of claim 1, including: adjusting a raster pattern of the wire source and/or the electron beam to deflect back, or to the sides to spread heat, wherein the adjusting beam raster pattern is adjusted at speeds of at least about 5 Hz.
3. The method of claim 1, including: detecting changes in molten pool size and shape, wherein molten pool size and/or shape comprises at least one of pool width, pool length, pool aspect ratio, pool area, and pool centroid; adjusting one or more of a power of the electron beam travel speed; and/or wire feed rate to increase or reduce molten pool size and/or to change molten pool shape, wherein changes in pool size and/or shape are detected.
4. The method of claim 1, including: detecting changing thermal patterns that result in different bead geometries and/or microstructures; and adjusting one or more of a power of the electron beam; travel speed; and/or wire feed rate to correct bead geometries and/or microstructures; wherein changing thermal patterns are detected at speeds of at least about 5 Hz, and adjustments occur at speeds of about 25% or less of the detection speed.
5. The method of claim 1, including: detecting a melting temperature of the molten metal; and adjusting one or more of power of the electron beam, travel speed, beam raster, and/or wire feed to melt the wire.
6. The method of claim 1, including: detecting dealloying in the molten metal; and reducing power of the electron beam and/or increasing travel speed of electron beam and/or changing focus of the electron beam and/or changing the raster pattern of the electron beam to reduce a temperature of the molten metal.
7. The method of claim 1, including: detecting viscosity of the molten metal; and changing a beam angle relative to the molten pool and/or a wire entry angle relative to the molten pool and/or changing a raster pattern of the wire source and/or the electron beam to control the viscosity of the molten metal.
8. The method of claim 1, including: detecting a surface tension of the molten pool; changing a beam angle relative to the molten pool and/or a wire entry angle relative to the molten pool and/or changing a raster pattern of the wire source and/or the electron beam to reduce or increase surface tension.
9. The method of claim 1, including: detecting excessive height and/or width of a molten pool at a start sequence of the deposition process; adjusting timing of one or more of a starting beam power, a travel speed, and/or a wire feed rate to reduce a height and/or a width of the molten pool; wherein excessive height and/or width is detected at speeds of at least about 10 Hz, and adjustments occur at speeds of at least about 1 Hz during the start sequence of the deposit.
10. The method of claim 1, including: detecting narrowing of the molten pool and/or the solidified deposit; adjusting one or more of a beam power, a travel speed, a beam raster and a wire feed rate to increase a width of the solidified deposit.
11. The method of claim 1, including: detecting variations in one or more of a solidified deposit height, a solidified deposit width, and shape at a stop location during a stop sequence of the deposition process; adjusting one or more of the beam power, the travel speed and the wire feed rate to provide at least one of a uniform height, a uniform width, and a uniform shape of the solidified deposit; detecting variations occurs at speeds of at least about 10 Hz and adjustments occur at speeds of at least about 1 Hz during the stop sequence of the deposit.
12. The method of claim 1, including: detecting variations in one or more of a solidified deposit width and a solidified deposit height due to changes in build direction during programmed build direction changes of the deposition process; and adjusting one or more of beam power, travel speed, and wire feed rate to reduce variations in at least one of a solidified deposit width and height; wherein variations are detected at speeds of at least about 5 Hz, and adjustments occur at speeds of at least about 1 Hz during programmed build direction changes of the deposition process.
13. The method of claim 1, including: detecting incomplete wire melting; adjusting the deposition process by providing beam focus and deflection up wire to preheat the wire and/or preheating the wire utilizing a heater and/or reducing the wire feed rate; detecting incomplete wire melting at speeds of at least about 5 Hz, and adjusting the deposition process at speeds of at least about 1 Hz for a duration of about 5 seconds or more after an initial detection of incomplete wire melting occurs.
14. The method of claim 1, including: detecting dripping of melted wire; and adjusting the deposition process by increasing the wire feed rate and/or decreasing the beam power and/or increasing the travel speed and/or changing a wire feed height distance; detecting dripping of melted wire at speeds of at least about 10 Hz, and adjusting the deposition process at speeds of at least about 1 Hz for a duration of about 5 seconds or more after an initial detection of dripping occurs.
15. The method of claim 1, including: detecting stabbing/wire dragging; and adjusting the beam power and/or the travel speed and/or changing a wire feed height distance; wherein stabbing/wire dragging is detected at speeds of at least about 10 Hz, and adjustments occur at speeds of at least about 1 Hz for a duration of about 5 seconds or more after an initial detection of stabbing/wire dragging occurs.
16. The method of claim 1, including: detecting one or more of residual stress, curvature, or twist in the wire; and adjusting the deposition process by providing beam deflection across the wire to redirect the wire into the molten pool; wherein detecting one or more of residual stress, curvature, or twist in the wire occurs at speeds of at least about 10 Hz, and adjusting the deposition process occurs at speeds of at least about 1 Hz for a duration of about 5 seconds or more after an initial detection of a wire anomaly occurs.
17. The method of claim 1, including: detecting if the wire does not enter the molten pool at a desired location; and adjusting the deposition process by adjusting a position of the wire feeder relative to the molten pool; wherein detecting occurs at speeds of at least about 10 Hz, and adjusting the deposition process occurs at speeds of at least about 1 Hz for a duration of about 5 seconds or more after an initial detection of wire not entering the molten pool at a desired location occurs; and/or halting the process if wire is detected outside the molten pool for at least about 1.0 seconds.
18. The method of claim 1, including: simultaneously detecting more than one of 1) a thermal transient; 2) wire alloy physical properties and/or melting range; 3) a width, length, area or centroid of the molten pool; 4) tracking of the wire and/or the molten pool; and 5) flaws in the solidified metal; adjusting two or more of beam power, beam raster, travel speed, wire feed rate, position of the wire feeder relative to the molten pool, or providing beam deflection up wire to redirect the wire into the molten pool to thereby simultaneously correct more than one manifestation.
Description
BRIEF DESCRIPTION OF THE SEVERAL VIEWS OF THE DRAWINGS
[0023] The patent or application file contains at least one drawing executed in color. Copies of this patent or patent application publication with color drawing(s) will be provided by the Office upon request and payment of the necessary fee.
[0024]
[0025]
[0026]
[0027]
[0028]
[0029]
[0030]
[0031]
[0032]
[0033]
[0034]
[0035]
[0036]
[0037]
[0038]
[0039]
[0040]
[0041]
[0042]
DETAILED DESCRIPTION OF THE INVENTION
[0043] For purposes of description herein, the terms “upper,” “lower,” “right,” “left,” “rear,” “front,” “vertical,” “horizontal,” and derivatives thereof shall relate to the invention as oriented in
[0044] A first EBF.sup.3 machine 1A is shown in
[0045] The operational concept of the EBF.sup.3 process is to build a near-net-shape metal part directly from a CAD file in a layer-additive manner without the need for molds or tooling dies. In this process, an electron gun 5A, 5B, 5C generates an electron beam 6A, 6B, 6C, respectively that is used as a heat source to create a small molten pool on a substrate (e.g. baseplates 8A, 8B, 8C, respectively) into which wire 10A, 10B, 10C from a wire feeder 12A, 12B, 12C, respectively is fed. The substrate (baseplate) can be composed of identical or different material than the deposited metal depending upon the application. The electron beam 6A, 6B, 6C and wire feed assembly 12A, 12B, 12C, respectively are translated with respect to the baseplate 8A, 8B, 8C, respectively to follow a predetermined tool path, similar to conventional computer-aided machining practice. The deposited material solidifies immediately after the electron beam 6A, 6B, 6C has passed, having sufficient structural strength to support itself. This process is repeated in a layer-wise fashion, resulting in a near-net-shape part requiring minimal finish machining. Careful attention to process control minimizes transient thermal effects, such as distortion, until the part cools and the part can be removed from the vacuum chamber 4A, 4B, or 4C.
[0046] EBF.sup.3 offers several unique attributes among the competing metallic additive manufacturing approaches. First, it is scalable in size and deposition rate, allowing fabrication of parts measuring a few cubic centimeters up to parts 1 cubic meter or larger, restricted only by the size of the vacuum chamber. High deposition rates with larger bead sizes enable near-net-shape construction of large structures using established aerospace alloys such as aluminum 2219 and 6061, stainless steel 304 and 316, Inconel® 625 and 718, and titanium Ti-6A1-4V. Second, EBF.sup.3 uses wire feedstock as opposed to metal powder for high feedstock usage efficiencies and safe operability in reduced gravity environments such as low-Earth orbit. Third, the electron beam used to melt the metal wire requires that the process be conducted in a vacuum chamber; vacuum enables processing of traditional aerospace alloys, most of which cannot be melted in air without oxidation degrading their metallurgical properties. Finally, EBF.sup.3 offers the promise of fabrication of structures with functionally graded metallurgy. By selectively introducing wires of different compositions during the deposition process, the chemistry and resulting physical properties of the metal structure can be varied continuously throughout the part and tailored to its exact service requirements.
[0047] While the basic operational concept of EBF.sup.3 is simple, a closer look reveals dozens of variables, each affecting the outcome and many of which are interdependent. As discussed in more detail below, there are several major challenges to the acquisition and use of real-time sensor data to monitor and control the process. One aspect of the present disclosure is the use of imaging techniques and data analyses to detect anomalies and refine the EBF3 process through real-time monitoring and control to mitigate these challenges.
[0048] The first major challenge to sensor integration into the EBF.sup.3 process is the deposition environment itself. Efficient generation and transmission of the electron beam requires high vacuum (10.sup.−5 Torr or lower), meaning that sensor electronics in the chamber must (preferably) be vacuum-rated. This implies little or no permissible outgassing from electronics or packaging and the ability to run uncooled or with conductive and radiative cooling only. Unlike vacuum processes such as electron microscopy, EBF.sup.3 is a relatively “dirty” process that results in metal vapor contamination of line-of-sight surfaces inside the vacuum chamber. Unprotected optical surfaces such as lenses or mirrors will become coated with metal vapor that will periodically need to be removed. Translation of the part and/or electron beam gun during part fabrication results in a moving molten pool that is difficult to track unless sensors are incorporated into the electron beam gun carriage. The size of the electron beam gun and the gun-to-work distance also place practical limits on the size and placement of cameras or other sensors.
[0049] Second, EBF.sup.3 is an inherently thermally transient process. Several factors contribute to this, beginning with its layer-additive nature. The continuously moving molten pool over a relatively cold baseplate or previous layer encounters a different cooling path and thermal mass with each successive layer. Variations in the geometry of the part such as section thickness changes, ends or corners also contribute to these changes. Thermal transients need to be better managed to enable repeatability necessary for certification of additive manufacturing processes for use in many applications. Therefore, sensors capable of measuring thermal distributions are important for tracking changes in the molten pool (by detecting the thermal gradients between liquid and solid phases) over time.
[0050] Third, the physical properties of each metal alloy (e.g., specific heat, melting temperature, thermal conductivity, vapor pressure) necessitate different process parameters such as beam power, beam raster, wire feed rate and translation speed. Factors of 2×-10× difference depending upon the material and part geometry are not uncommon, often requiring equally wideband sensors. Less obvious are process accommodations arising from material properties such as molten pool surface tension and liquid metal viscosity, which affect the shape and behavior of the molten pool during deposition. Differing vapor pressures of various alloying additions can result in selective de-alloying (constituent loss) in the deposited material. Controlling the temperature of the EBF.sup.3 process has been shown to impact alloy compositional losses. The temperature-dependent variation of emissivity also affects thermal imaging, requiring unique sensor calibrations and camera settings to optimize the imaging. While emissivity is well documented for many pure metals and common engineering alloys, it is not generally known for functionally graded materials deposited with EBF.sup.3. Since it is of interest to use EBF.sup.3 to deposit materials with widely varying physical properties, wideband sensors capable of detecting the thermal environment for low melting temperature alloys like aluminum up to high melting temperature alloys like nickel are more versatile.
[0051] The fourth challenge involves geometric variations in the deposit that result from imperfect coordination of heat and mass flow (electron beam power and wire feed) during starts, stops and abrupt changes in build direction. These variations include bulbs (build-up of excess material at starts), necking (narrowing of the deposit) or tailing-off (deficit in deposit height approaching a stop). Although bead widths are affected with each of these variations, the more significant impact is on the height of the deposited material. Since the EBF.sup.3 process is a layer-additive process, even minute perturbations in height accumulate and cause large errors over time as the build progresses. Even parts measuring as small as 10 cm in height can represent over 100 layers. Therefore, the sensor type and its location in the build chamber preferably provide precise measurement of the bead height.
[0052] The closely related fifth challenge involves the relative direction of wire in-feed and deposit direction to the geometric variations in the deposit. Changes in the wire orientation with respect to the translation direction (e.g., wire lagging or pushing the molten pool, or entering from the side) and wire elevation (e.g., entry angle relative to the horizontal) can subtly change the geometry of the deposit. Equally important, fabrication of some parts may require multiple side-by-side beads to develop the required section width, and the shape of the molten pool depends upon the presence and relative location of adjacent beads. For example, for multi-bead deposits it is often easier to “push into” adjacent beads than to reach over them but this is not always possible due to other constraints. If the width of the bead and the influence of the wire on the molten pool can be measured in real-time, minor adjustments to processing parameters such as wire feed rate and translation speed can be implemented to improve part precision.
[0053] Sixth, random process errors result from variability in the wire feed. The wire is primarily at room temperature until it crosses into the electron beam path, at which point it is subjected to an abrupt thermal gradient, melting over a very short distance as it enters the molten pool. Larger diameter wire, therefore, retains substantial stiffness as it enters the molten pool, potentially resulting in several errors. In the event of excess heat, insufficient wire feed, or wire feeding above the electron beam/substrate intersection point, dripping may occur. Conversely, insufficient heat, excess wire feed, or wire feeding below the electron beam/substrate intersection point may result in “wire stabbing” which can cause the wire to oscillate back and forth in the molten pool; skip, causing fluctuations in the deposit height; or deflect off the bottom of the molten pool and divert out of the beam altogether. Improper wire location or poor timing of the start/stop sequence will often result in wire sticking through the welds. Some errors of this nature have also been observed due to cast (residual curvature or twist in the wire not removed by the wire straightener) or simple mechanical misalignment of the wire feed apparatus that was not immediately apparent. To measure wire feed anomalies, it may be beneficial to track wire position relative to the molten pool. This may require a sensor with a wider field of view and the ability to measure geometric features that have widely different temperatures.
[0054] A seventh major challenge is encapsulation of flaws within the EBF.sup.3 deposits. Voids and porosity have been observed due to contamination (cleanliness) of the wire, wire variability, or programming errors in the steps between side-by-side beads and layers. Inclusions can occur when the molten pool picks up a contaminant from contaminated wire or from metal vapor condensate flaking off and falling into the deposit. Lack of fusion between layers can occur due to insufficient heating before or during the deposition steps, improper programming of the layer height, or oxidized surfaces when the part has been exposed to air prior to initiating or resuming interrupted EBF.sup.3 deposition. Similar to welding operations, hot cracking or quench cracking can occur due to high thermal gradients, insufficient preheat or microsegregation that occurs with rapid cooling. Material property variations can also occur due to microstructural or chemical variations. For example some alloys will form strong textural orientation due to preferential crystallographic freezing that follows the cooling path. Finally, large thermal gradients and thermal contraction can result in residual stresses that will manifest as distortion, or in the extreme case, cracking. These defects and the mechanisms to control and avoid their formation are somewhat understood.
[0055] The ability to detect, quantify and repair flaws that occur during the EBF.sup.3 deposition process is beneficial. Evaluating thermal diffusivity using thermal imaging cameras is one way to detect embedded flaws during deposition.
[0056] The solution to these challenges resides in integration of imaging systems into the EBF.sup.3 systems to monitor the process. Image analyses to identify the anomalies and control logic to implement corrective action are then required to fully close the processing control loop.
Internal Mount CMOS Camera
[0057] Initial NIR imaging approaches to monitoring the molten pool during the EBF.sup.3 process were investigated from 2003 to 2005. The first camera selected was from Silicon Imaging, model SI-1280. This is a 12-bit, digital Complementary Metal-Oxide Semiconductor (CMOS) camera, which has particular advantages for the EBF.sup.3 process environment. Data is digitized in the camera reducing the susceptibility of signals to noise in transmission lines. CMOS cameras directly measure the current in the detector so there is no charge build-up in the pixel wells as in a Charged Coupled Device (CCD). Therefore CMOS cameras will not bloom or streak when overexposed. For example, if the electron beam energy density is too high, the resulting plasma would “wash out” a normal CCD camera, preventing viewing of the molten pool. A CMOS sensor will simply “peg out” a pixel at its maximum value, leaving adjacent pixels unaffected. The exposure was controlled through a LabView Camera Link interface. This camera has a 1.28 megapixel chip, but can be operated with a smaller region of interest at very high speeds. At 100×100 pixels, frame rates of 3000 fps can be achieved.
[0058] The CMOS camera consumes very low power, producing less heat and reducing the need for cooling in the vacuum environment. A water-cooled coldplate was installed against the camera body for precautionary measures, but the camera also operated for short periods of time without overheating in the vacuum environment without the coldplate. The compact design of this camera (45×52×50 mm) enabled installation on a bracket directly on the electron beam gun. Pinhole and secondary optics were installed with a flow controller to meter argon into the camera/pinhole system to protect the optics from being occluded by metal vapor. This optical camera was bandpass filtered down to the NIR range and calibrated to provide thermal information.
[0059]
Fiber Optic+External Mount CCD Camera
[0060] Although the CMOS camera has high speed data acquisition, good compatibility with the vacuum environment, and resistance to blooming of oversaturated pixels to adjacent pixels, the resolution and low light capabilities were inferior to CCD cameras in the 2003 to 2005 time period. For comparison, the second camera evaluated at that time was a Hamamatsu C8484-05 12-bit CCD 14 (
[0061] The Hamamatsu camera 14 was too large to mount on the electron beam gun and was not well adapted to the vacuum environment. With reference to
Backscattered Electron (BSE) Detector
[0062] From mid-2008 to mid-2009 an effort was made to develop an electron imaging system that could be used to actively monitor and measure the EBF.sup.3 deposit height and wire position relative to the beam. Additional objectives of this work were to explore the capabilities of the electron beam gun system to raster the beam at relatively high frequency in specific patterns to preferentially direct energy to the wire or the molten pool, and to detect the onset of process errors due to wire feed errors or misalignment.
[0063] Normal operation of the EBF.sup.3 electron beam generates large quantities of primary electrons, secondary electrons, x-rays, neutral particles, ions and backscattered electrons, all with a wide range of energies. Of these possible signal sources, backscattered electrons (BSEs) were chosen because of their directionality and high retained energy fraction. A custom-built BSE detector 34 (
[0064] Several different mounting arrangements for the detector 34 were tried with varying degrees of success for producing an unobstructed view of the EBF.sup.3 process zone without exposing the sensor to metal vapor. The best viewing angle was ultimately obtained with the detector mounted directly in line with the wire feed nozzle 32 (
[0065] Some high quality images were obtained with the BSE detector 34; however, these images were obtained with very low beam current (1-5 mA) and a raster scan pattern specifically designed for imaging, not deposition. In other words, images of this type could not be obtained using the beam parameters in real time during an actual build; imaging scans would have to be conducted separate from the build process. Also, during the build process the beam path is confined to the molten pool and not rastered outside a very small target area. It was possible to infer, but not directly measure, the deposit height with a single BSE detector. The efforts to monitor wire position and preferentially direct beam energy into the wire or the molten pool with the BSE detector were quite successful, and revealed that some information as to geometric error conditions (dripping, wire feeding off-center to the molten pool) could easily be detected.
[0066] Despite these promising results, BSE imaging was ultimately abandoned as a means to provide information to the closed-loop control system. This was mainly due to its relatively high cost and the bulkiness of the detector system. In addition, the BSE detector required modification of the electron beam rastering and focusing coils to coordinate the beam location with the sensors in the detector. As a research and development tool, the BSE detector was useful, but challenges with obtaining images during beam power and raster patterns typical for deposition, and the ability to image but not measure temperatures led to the decision to explore other sensors.
Internal Mount CCD Camera
[0067] It was learned from the experiences described above that camera location may be important for observation of the molten pool sufficient to provide data usable for closed-loop control of the process.
[0068] With reference to
[0069] The NIR band was selected to image metals of higher melting temperatures such as 316 stainless steel, Ti-6A1-4V, and Inconel® 625. The Prosilica GC1380H camera 42 is a non-cooled CCD camera with a frame rate of 30 Hz at full resolution through a GigE interface. A water-cooled coldplate 44 was installed against the camera body 36A to provide cooling in the vacuum environment of vacuum chamber 4D. The camera pixel array size is 1360×1024 (pixel pitch size of 6.45 μm×6.45 μm). The dynamic range of camera 42 is 12 bits. The imaging spectral band may be set at 0.875 to 1.05 μm using a long pass filter to allow imaging temperatures from 700 to approximately 2,200° C. An NIR neutral density filter may be used to reduce the transmission by a factor of 10. The C-mount optical package contains a 150-mm relay lens pair, a protective window (B270 material), and an extension tube with a gas fitting 46 (
[0070] A radiometric calibration may be utilized to convert the pixel values (intensity counts) to temperature, define the temperature imaging limits of the system, determine the optimal threshold values for closed loop control metrics (based on the wire melting temperature), correct for material dependent emissivity, and selection of the optimal integration time. A radiometric characterization was performed on the NIR camera/optic 42 using a calibrated blackbody radiation source set at various temperatures. The process involves the calibration of the radiance counts to actual temperature values. The temperature values used were 700, 800, 900, 1,000 and 1,100° C. at specified sensor integration times ranging from 10 to 50,000 μs. Using a given emissivity value, the radiance is then converted to temperature using a linear interpolation of the system's radiance response.
[0071]
Internal Mount Short-Wave IR (SWIR) Camera
[0072] Longer wavelength cameras may be utilized for imaging lower melting temperature alloys (e.g. aluminum). With reference to
[0073] The SWIR band may be utilized to image metals of lower melting temperatures such as aluminum. The digital SWIR camera 50 may comprise an Allied Goldeye G-032. This camera requires temperature stabilization using an internal thermoelectric cooler. The camera pixel array size is 636×508 (pixel pitch size of 25 μm×25 μm). The camera's dynamic range is 14 bits with a maximum frame rate of 100 Hz at full resolution through a GigE interface. The spectral response of the camera's detector is approximately 0.950-1.7 μm and this allowed measurement of temperatures from about 300° C. to about a 1000° C. The camera 50 may be protected within an aluminum enclosure that is liquid cooled. The camera's optic is a C-mount 50 mm lens with 75% or better transmission between 0.700 μm to 1.9 μm. A protective window comprising a Mylar® polyester film 62 may be used to protect the optical system from metal vapor resulting from the electron beam deposition process. Camera resolution is approximately 0.015 cm/pixel. With a molten pool size of 0.2 cm to 0.6 cm, this camera resolution results in the regions of interest being captured by 10's of pixels across.
[0074] A radiometric characterization may be performed using a calibrated blackbody radiation source set at various temperatures for the SWIR camera 50. The process involves the calibration of the radiance counts to actual temperature values. The temperature values used were 300, 400, 500, 550, and 600° C. at specified sensor integration times ranging from 120 to 15,000 μs.
[0075] A SWIR temperature image and line plot collected during the deposition of aluminum 2219 are shown in
[0076] The vacuum, thermal, metal vapor environment and limited space in the EBF.sup.3 process pose challenges for sensor selection and integration into the system for real-time process monitoring and feedback. Since EBF.sup.3 is inherently a thermally transient process, thermal data are of interest to correlate with microstructural and non-destructive evaluations to identify metallurgical features and flaws that drive the mechanical properties of the deposited materials. Due to space constraints, multiple sensors may not be feasible, so sensors that can capture all of the suitable data are sought. Suitability of a particular imaging technology for use in the EBF.sup.3 process is also a concern. Suitability may be determined by consideration of the available frame rate, resolution, signal-to-noise ratio, spectral response, vacuum compatibility, ruggedness, size, and cost.
[0077]
[0078] If these various defects are detected by sensors such as cameras 14 and/or 24, the wire feed rate, angle α1 and/or θ1 or θ2 (
[0079] During operation, the wire feeder moves in the direction X which is generally parallel to the base plate 8 at a height “HW” (
[0080] In general, defects caused by excessive heat can be corrected by reducing the energy of electron gun 5/electron beam 6 and/or by raising the rate of movement of wire feeder 12 in the direction X and/or by increasing the wire feed rate. Conversely, defects resulting from insufficient heat can be corrected by reducing the power of electron gun 5/electron beam 6 and/or reducing the movement of the wire feeder 12 in the direction X and/or reducing the wire feed rate.
[0081] Table 1 (below) summarizes qualitatively how well the five sensors capture data to address the EBF.sup.3 process challenges.
TABLE-US-00001 TABLE 1 Summary of sensor suitability to measure features associated with EBF.sup.3 process challenges. Sensor Technology Section 4.1: Section 4.2: Section 4.3: Section 4.4: Section 4.5: Internal Fiber Optic + Internal Mount Internal Internal EBF.sup.3 Mount External Backscattered Mount Mount Process CMOS Mount CCD Electron (BSE) CCD SWIR Challenges Camera Camera Detector Camera Camera 1) Deposition Pinhole optics; Pinhole w/ Vapor shield; Pinhole Pinhole environment Cold plate fiber optics; Fully vacuum optics; Cold optics; Cold (vapor contamination; for camera Externally compatible plate for plate for vacuum compatibility) cooling mounted camera camera cooling cooling 2) Thermal transients Yes Limited No Yes Yes 3) Alloy physical NIR NIR n/a NIR SWIR properties/melting signature signature signature signature range 4) Height measurement Limited Limited Not Limited Limited (with one camera) demonstrated 5) Width measurement Yes Limited Yes, but not Yes Limited demonstrated in real time 6) Wire/molten pool Yes Limited Not Yes Limited tracking demonstrated 7) Real-time flaw Yes Limited Limited Yes Yes detection
[0082] Various issues associated with the deposition environment can be corrected as shown in Table 2.
TABLE-US-00002 TABLE 2 Deposition Environment # EBF3 Process Challenge Manifestation in Deposit Corrective Action Required 1 Deposition Environment 1a vacuum not an impact to deposit; install cooling jacket; sensor affects ability to measure key selection with low heat features-sensor electronics generating electronics/vacuum overheat compatibility 1b vacuum not an impact to deposit; use vacuum compatible affects ability to measure key materials for sensors, features-sensor outgassing packaging, wires; vacuum- compatible lubricants if needed 1c metal vapor not an impact to deposit; pinhole optics with or without affects ability to measure key argon (inert gas) back features-sensor optics pressure; scrolling mylar film occluded/changes over time as over windows/optics; mirrors; vapor builds up ion shield; select sensors not sensitive to metal vapor deposition 1d constrained gun-to-work not an impact to deposit; mirrors & small sensors distance & moving gun affects ability to measure key installed on moving gun and features-tight space to install fit within gun-to-work sensors; sensor location and distance; remote sensors may angle to adequately view be usable for wider field views and track molten pool as it traverses across the parts 1e radiation (from not an impact to use IR transparent electron beam) deposit; affects ability windows with radiation to measure key features- protection shroud leaded glass windows around externally- not IR transparent mounted sensors; install sensors or transmission lines (such as fiber optic cables) inside chamber
[0083] The Process Challenges and Corrective Actions of Table 2 are believed to be straightforward, such that a detailed description is not necessary.
[0084] With reference to Table 3, various issues related to thermal transients can be detected/measured and corrected as shown.
TABLE-US-00003 TABLE 3 Thermal Transients/Control EBF.sup.3 Process Challenge Manifestation in Deposit Corrective Action Required 3a Instantaneous transients Fluxuations in molten Rapid monitoring of molten (molten pool traversing pool and bead width pool, change raster pattern to over cold baseplate) along length correct (deflect back or to sides to spread heat more evenly); high speed detection and corrective action 3b Build-up of background Gradual increase in Long-term tracking of heat (due to multiple layers) molten pool size (length molten pool size & shape; width, aspect ratio, area, reduce power to correct; low centroid) resulting in speed detection and mushrooming of bead corrective action width (first layer narrower than subsequent layers due to changing cooling path) 3c Changing cooling path Changing thermal Long-term tracking of (as build up part, due to patterns results in molten pool size & shape; conductive-only cooling different bead geometries reduce power to correct; low path) & microstructures speed detection and corrective action
[0085] In an Electron Beam Freeform Fabrication (EBF.sup.3) process according to one aspect of the present disclosure, an electron beam 6 (
[0086] EBF.sup.3 is an inherently thermally transient process. Several factors contribute to this, beginning with its layer-additive nature. The continuously moving molten pool 64 over a relatively cold baseplate 8 or previous layer encounters a different cooling path and thermal mass with each successive layer. Variations in the geometry of the part such as section thickness changes, ends or corners also contribute to these changes. Thermal transients can be taken into account by controller 72 to enable repeatability necessary for certification of additive manufacturing processes for use in many applications. Sensors (e.g. cameras 14, 24) capable of detecting/measuring thermal distributions may be utilized to detect/track changes in the molten pool 64 by detecting the thermal gradients between liquid and solid phases over time.
[0087] Thermal gradients from deposition onto a cold substrate 8 can cause rapid fluxuations in the molten pool 64, resulting in changing width W (
[0088] Table 4 is a summary of various issues related to thermal properties and associated corrective actions.
TABLE-US-00004 TABLE 4 Alloy Thermal Properties EBF.sup.3 Process Challenge Manifestation in Deposit Corrective Action Required 4a Melting temperature Lower melting Selection of appropriate sensors detectable with imaging temperature alloys not to detect lower temperatures; sensors (to detect edges visible with same sensor calibration of sensors to lower of molten pool) as higher melting melting temperatures; use of temperature alloys reflectance changes from molten to solid to detect molten pool boundaries; low speed detection and corrective action; does not require continuous monitoring or adjustments once set 4b Liquidus/solidus range Affects precision of Selection of appropriate sensors detectable with imaging deposit and control to detect lower temperatures; sensors (to detect edges of possible calibration of sensors to lower molten pool and trace melting temperatures; use of cooling path in tail area) reflectance changes from molten to solid to detect molten pool boundaries; low speed detection and corrective action; does not require continuous monitoring or adjustments once set 4c Specific heat Affects selection of Power increased, travel speed power, travel speed decreased, and/or wire feed rate decreased simultaneously to increase power to melt (converse is also true to decreased power to melt); low speed detection and corrective action; does not require continuous monitoring or adjustments once set 4d Thermal conductivity Affects selection of Power increased, travel speed power, travel speed decreased, and/or wire feed rate decreased to increase power to melt (converse is also true to decreased power to melt); low speed detection and corrective action; does not require continuous monitoring or adjustments once set 4e Vapor pressure (function Dealloying in molten Reduce power (accelerating of temperature & pool (& resulting voltage and/or beam current) pressure) deposit); causes build-up increase travel speed and/or wire on inside of system & on feed rate to reduce temperature, sensor optics reduce molten pool size & duration of exposure of molten pool surface to vacuum; change beam focus to switch between keyhole vs. conduction mode; low speed detection and corrective action; does not require continuous monitoring or adjustments once set 4f Emissivity Different alloys not Use independent sensor visible with same sensor calibration (with black body settings radiation source); use handbook values to adjust empirically; may be able to approximate liquidus/solidus range based on change in reflectivity; low speed detection and corrective action; does not require continuous monitoring or adjustments once set 4g Molten viscosity Affects wire feed Change deposition angle of direction, ability to build beam and wire entry angle into unsupported overhangs molten pool with respect to deposit and/or changing a raster pattern of the wire source and/or the electron beam; low speed detection and corrective action 4h Surface tension Affects wire feed Change deposition angles of direction, ability to build beam and wire entry angle into unsupported overhangs molten pool with respect to deposit and/or changing a raster pattern of the wire source and/or the electron beam; low speed detection and corrective action 4i Brightness/high intensity Not an impact to deposit; Band pass filtering to reduce of molten pool and affects ability to measure intensity; shorter shutter surrounding plasma key features-washes out speeds/integration times to plume or saturates sensors, prevent sensor saturation; reducing detectability of electronic selection of different lower melting regions of interest and setting temperature regions of different integration times for interest different regions; sensor selection to reduce or eliminate pixel saturation and bloom; low speed detection and corrective action; does not require continuous monitoring or adjustments once set
[0089] Differing vapor pressures of the alloying additions can result in selective de-alloying (constituent loss) in the deposited material (e.g. deposit 66,
[0090] Tables 5, 6, and 7 summarize issues associated with height/width measurement, wire entry, and wire anomalies, respectively.
TABLE-US-00005 TABLE 5 Height/Width Measurement EBF.sup.3 Process Challenge Manifestation in Deposit Corrective Action Required 5a Starts Build up bulbs (extra Adjust timing of starting height and width at start, beam power, beam raster, due to incorrect timing travel speed, wire feed rate; between beam on, wire high speed detection and feed entering molten corrective action, short pool, and travel speed- duration controlling inertias) 5b Necking-narrowing of Narrowing of deposit, Can control if eliminate deposit within layer being often just behind a bulb bulbs at starts & abrupt deposited (along length of at start or at abrupt changes in geometry; high deposition direction) or at change in build direction speed detection and base of deposit (first layer corrective action, short narrower than subsequent duration layers due to changing cooling path) 5c Stops Depression of height, Adjust timing of ending cratering of molten pool, beam power, beam raster, tailing off (height drops travel speed, wire feed rate; due to thinner layer high speed detection and deposited) corrective action, short duration 5d Abrupt changes Narrowing/widening Adjust timing of beam power, in build direction of deposit and beam raster, travel speed, increase/decrease in wire feed rate-possible feed- height before during and forward option to program after abrupt changes in known geometric effects build direction with programmed changed as approach changes in direction; high speed detection and corrective action, short duration
[0091] As shown in Table 6, various issues associated with the wire entry direction can be corrected as shown.
TABLE-US-00006 TABLE 6 Wire Entry Direction EBF.sup.3 Process Challenge Manifestation in Deposit Corrective Action Required 6a wire enters leading edge narrower deposit no correction required of molten pool 6b wire enters trailing edge easily freezes wire in slight increase in wire feed of molten pool molten pool (wire stick height distance to avoid wire or stabbing/wire sticks, raster beam across wire dragging) to preheat/melt, decrease wire feed rate, increase wire elevation angle into molten pool; high speed detection and corrective action 6c wire enters side of wider molten pool due to slight increase in wire feed molten pool wire pushing molten height distance to avoid wire pool over sticks, raster beam up wire to preheat/melt, decrease wire feed rate, increase wire elevation angle into molten pool; high speed detection and corrective action 6d wire enters at an angle into wider molten pool due to depends on whether angle is molten pool (relative to wire pushing molten closer to entering leading travel direction) pool over edge vs. side or trailing edge of molten pool-vary wire feed height distance, raster beam up wire to preheat/melt, wire feed rate, and wire elevation angle into molten pool as a function of the direction of wire feed with respect to translation direction; high speed detection and corrective action 6e side-by-side fills overlaps/gaps critical in programmed path planning to controlling heat build-up push into side vs. reaching and geometry of built over previously deposited parts bead; low speed detection and corrective action 6f wire elevation (entry angle angle too low limits 45 degrees is ideal; lower relative to horizontal) build shapes due to angle gives shorter wire time hardware crashes, in beam before entering incorrect angle can molten pool & pushes molten contribute in wire pool when fed to side; higher anomalies (detailed angle difficult to achieve with below) size of gun but directs wire into molten pool (better for wire entering side or trailing edge of molten pool); high speed detection and corrective action, does not require continuous monitoring or adjustments once set
TABLE-US-00007 TABLE 7 Wire Anomalies EBF.sup.3 Process Challenge Manifestation in Deposit Corrective Action Required 7a Lack of wire cleanliness May be difficult to detect in If detected, insert note into data (from dust due to poor process-sparking or ejecta set; if greater than set threshold storage conditions, during deposition, brighter value, halt deposition and oxidation due to age and or different plasma vapor inspect/clean or replace wire poor storage conditions, plume; manifests as small spool; high speed detection and residual lubricants from porosity, inclusions or corrective action, short duration wire drawing) minor localized chemistry variations in deposit 7b Abrupt thermal gradients At higher wire feed rates, Beam focus and deflection up in wire due to feeding into can result in incomplete wire to preheat wire; use of molten pool (lack of wire wire melting or “chopped” external wire preheating preheat) wire bits transmitted into (resistance, inductance, radiant- molten pool; reduced careful not to induce EMI diameter wire sticks out of that will interfere with electron side of deposit beam); reduce wire feed rate; switch to smaller diameter wire; high speed detection and corrective action, short duration 7c Dripping (due to excess Irregular height, Increase wire feed rate; heat, insufficient wire feed compounds with multiple decrease beam power (current); or wire feed height distance layers increase travel speed; adjust too high) wire feed height distance; high speed detection and corrective action 7d Stabbing/wire dragging Wire oscillates back and Decrease wire feed rate; (due to insufficient heat, forth, traces grooves in increase beam power (current); excess wire feed, or wire deposit, deflects off bottom decrease travel speed; adjust feed height distance too of molten pool and diverts wire feed height distance; high low) out of beam/molten pool speed detection and corrective action 7e Wire cast (residual stress, Wire sticks out of side of Improved wire straighteners in curvature or twist in wire) deposit, wire misses system; beam deflection across curls wire away from beam/molten pool wire to redirect into molten molten pool altogether, wire oscillates pool; high speed detection and back and forth, wire corrective action position is biased to one side of the molten pool 7f Poor timing of wire/beam Wire stick/freezes in Feed-forward approach (pre- starts & stops molten pool (resulting in program starts and stops based pulling gun/wire feeder out on empirical or theoretical of alignment, can leave timing); monitor for anomalies cracks or unmelted wire in and set threshold to interrupt deposit), wire retracts too build if anomalies detected are early results in excess heat above threshold; increase buildup, reducing deposit preheat; detect quickly-stop, height and increasing width back up translation, turn on locally beam to cut wire, then adjust wire feed height distance; high speed detection and corrective action, short duration 7g Wire position too high/low Too high-dripping; too Alignment check before or wire feeder rotated, so low-stabbing or dragging; initiating deposition; adjust wire does not enter molten rotated-wire sticks out position of wire feeder with pool at correct location side of deposit or misses respect to molten beam/molten pool pool/deposition surface; altogether or wire position interrupt build if wire detected is biased to one side of the outside molten pool; high speed molten pool detection and corrective action, short duration
[0092] Geometric variations in the deposit 66 (
[0093] Imaging may be accomplished with one or more near-infrared, infrared, or band-pass filtered optical cameras (14, 24) positioned at an angle with respect to the molten pool 64 to allow observation of bead height H. Most angles will work, as long as the camera (14, 24) is not oriented straight down on the molten pool 64 (looking along the axis of the electron beam 6). The geometry of the location of the camera is typically fixed, so the vertical and horizontal location of the molten pool 64 relative to the wire feeder 12 and substrate 8 can be determined with simple trigonometry. Identification of the location of the molten pool 64 may be determined by calculating the centroid and comparing it to the wire location. As the centroid moves closer to the wire location, the height H is increasing, and as the centroid moves farther away from the wire location, the height H is decreasing. This height measurement can then be used by controller 72 to increase or decrease the wire feed rate to raise (increased wire feed rate) or lower (decreased wire feed rate) the height H of the deposited bead 63. Furthermore, the wire feed rate can be synchronized with the translation speed, using the X and Y speeds from feedback on the X and Y translation stage motors, to automatically correct the wire feed rate for speed changes at starts, stops, and changes in translation direction. The measured height H would further increase or decrease the wire feed rate to maintain a constant height H across the entire layer on the part. If the wire feed rate cannot be synchronized to the translation speed, corrections based solely on height H will also work (i.e. the wire feed rate does not necessarily need to be synchronized with the translation speed).
[0094] Control of the EBF.sup.3 process also includes consideration of the relative direction of wire in-feed and deposit direction to the geometric variations in the deposit 66. Changes in the orientation of wire 13 with respect to the translation direction (e.g., wire lagging or pushing the molten pool 64, or entering from the side) and wire elevation (e.g., entry angle α, relative to the horizontal) can subtly change the geometry of the deposit. Also, parts may require multiple side-by-side beads 63 to develop the required section width, and the shape of the molten pool 64 depends upon the presence and relative location of adjacent beads 63. For example, for multi-bead deposits it is often easier to “push into” adjacent beads than to reach over them but this is not always possible due to other constraints. Use of cameras (such as optical, band-pass filtered optical, near-infrared, infrared) to measure the width W of the bead 63 and the direction of travel can be used to monitor the effects of relative direction of wire in-feed into the molten pool 64. The control system 72 is programmed to make minor adjustments based on the direction of the wire feed into the molten pool 64 as follows: If the wire 13 is feeding into the trailing edge of the molten pool 64 or into the side of the molten pool 64, the beam power may be increased slightly (1 milliamp or 1 kilovolt), the electron beam deflection may be changed to deflect the beam 6A onto the wire 13 to preheat the wire 13 before it enters the molten pool 64, the translation speed may be decreased by 1-2 inches per minute, the wire feed rate can be decreased by 5-10 inches per minute, or the wire feed height distance HW (
[0095] Random process errors result from variability in the wire feed. The wire 13 is generally at or near room temperature until it crosses into the electron beam path, at which point it is subjected to an abrupt thermal gradient, melting over a very short distance as it enters the molten pool 64. Larger diameter wire, therefore, retains substantial stiffness as it enters the molten pool 64, which may, result in various errors or defects. In the event of excess heat, insufficient wire feed, or wire feeding above the electron beam/substrate intersection point, dripping may occur. Conversely, insufficient heat, excess wire feed, or wire feeding below the electron beam/substrate intersection point may result in wire stabbing which can cause the wire 13 to oscillate back and forth in the molten pool 64; skip, causing fluctuations in the deposit height H; or deflect off the bottom of the molten pool 64 and divert out of the beam 6 altogether.
[0096] Improper wire location or poor timing of the start/stop sequence may result in wire sticks. Some errors of this nature may occur due to cast (residual curvature or twist in the wire 13 not removed by the wire straightener) or simple mechanical misalignment of the wire feed apparatus 12 that may not be immediately apparent. To measure wire feed anomalies, an important feature to track is the position of wire 13 relative to the molten pool 64. This may be accomplished with optical, near infrared, infrared, or band-pass filtered optical cameras (14, 24), where the camera is focused on the molten pool 64 and wire entry into the molten pool 64. Because the wire 13 is entering the electron beam 6 above the surface of the molten pool 64, it appears as a step feature in the molten pool images, when viewed from most angles (except for within about 15 degrees of straight down on the molten pool 64). The wire location (either the edges of the wire or the calculated centroid) may be tracked relative to the molten pool 64 (again, using either the edges of the molten pool 64 or the calculated centroid). The wire location preferably remains in a constant relationship to the molten pool 64 (i.e. they line up on the same centerline at a constant distance apart). Corrective actions may be implemented by controller 72 if the wire location changes with respect to the molten pool location by more than a preset threshold amount.
[0097] At higher wire feed rates, incomplete wire melting or “chopped” wire bits transmitted into molten pool 64 or bits of wire 70 (
[0098] As shown in Table 8 below, various issues associated with miscellaneous factors can be corrected as shown.
TABLE-US-00008 TABLE 8 Miscellaneous Factors EBF.sup.3 Process Challenge Manifestation in Deposit Corrective Action Required 8a Vapor condensate flakes off Produces voids and Clean facing surfaces between wire feeder nozzle, electron porosity or inclusions in deposition runs; monitor beam gun, or other facing final deposit; if condensate condensate build-up and surfaces and lands in molten buildup is large enough identify threshold to interrupt pool (such as bead forming at for cleaning surfaces; design end of wire tip) can freeze gun and wire feeder shielding out molten pool and cause to minimize surface area facing wire stick or large molten pool; apply line-of-sight geometric discontinuity in shielding that can be local bead height/width removed/replaced (such as Al foil wrap); high speed detection and corrective action, short duration 8b No wire feed (due to wire Molten pool increases in Adjust wire feed rate; adjust jams, birds nest, empty wire size rapidly, height drops tension on wire feeder; spool) or low wire feed (due to overheating with no interrupt build to manually (wire drive rollers slipping, wire feed) correct wire feed issues friction in wire guide tubes) (replace wire spool, cut out wire birds nests, fix wire jams, etc.); high speed detection and corrective action, short duration
[0099] The preceding description of the disclosed embodiments is provided to enable any person skilled in the art to make or use the present invention. Various modifications to these embodiments will be readily apparent to those skilled in the art, and the generic principles defined herein may be applied to other embodiments without departing from the spirit or scope of the invention. Thus, the present invention is not intended to be limited to the embodiments shown herein but is to be accorded the widest scope consistent with the following claims and the principles and novel features disclosed herein.
[0100] All cited patents, patent applications, and other references are incorporated herein by reference in their entirety. However, if a term in the present application contradicts or conflicts with a term in the incorporated reference, the term from the present application takes precedence over the conflicting term from the incorporated reference.
[0101] All ranges disclosed herein are inclusive of the endpoints, and the endpoints are independently combinable with each other. Each range disclosed herein constitutes a disclosure of any point or sub-range lying within the disclosed range.
[0102] The use of the terms “a” and “an” and “the” and similar referents in the context of describing the invention (especially in the context of the following claims) are to be construed to cover both the singular and the plural, unless otherwise indicated herein or clearly contradicted by context. “Or” means “and/or.” As used herein, the term “and/or” includes any and all combinations of one or more of the associated listed items. As also used herein, the term “combinations thereof” includes combinations having at least one of the associated listed items, wherein the combination can further include additional, like non-listed items. Further, the terms “first,” “second,” and the like herein do not denote any order, quantity, or importance, but rather are used to distinguish one element from another. The modifier “about” used in connection with a quantity is inclusive of the stated value and has the meaning dictated by the context (e.g., it includes the degree of error associated with measurement of the particular quantity).
[0103] Reference throughout the specification to “another embodiment”, “an embodiment”, “exemplary embodiments”, and so forth, means that a particular element (e.g., feature, structure, and/or characteristic) described in connection with the embodiment is included in at least one embodiment described herein, and can or cannot be present in other embodiments. In addition, it is to be understood that the described elements can be combined in any suitable manner in the various embodiments and are not limited to the specific combination in which they are discussed.