Berm or levee expansion system and method
09783944 · 2017-10-10
Inventors
Cpc classification
Y02A10/11
GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
E02B3/10
FIXED CONSTRUCTIONS
International classification
E02B3/10
FIXED CONSTRUCTIONS
E02B3/12
FIXED CONSTRUCTIONS
Abstract
A system and method to create or elevate a berm of a liquid retention facility by placement of lightweight fill material anchored by an impervious liner material(s). The impervious liner material is integral to a water retention system such as a containment system of a retention pond. The system and method can also be used to elevate the liquid retention height of a levee in combination with impervious liner retention material. By constructing the berm system on an existing levee, the effective height of the levee can be increased. The lightweight fill material provides the shape of the berm or levee extension. The liquid impervious liner material provides a watertight surface, the media for joining of the lightweight fill material, and the anchoring of the lightweight fill material to the existing berm or levee structure.
Claims
1. A method of elevating the height a liquid retention berm comprising: a) attaching a first liquid impermeable liner to a top edge of an existing second liner wherein the combined first and second liner is continuously covering an interior surface of a berm adjacent to a retained liquid; b) placing the combined first and second impermeable liner wherein the combined liner is covering a lightweight rigid foam material having density less than 5 pounds per cubic foot, compressive strength greater than 2 psi, and a flexural strength greater than 10 psi on a top ground surface of the berm; c) elevating the height of the top of the berm with the lightweight rigid foam material; and d) securing the lightweight rigid foam material with the combined first liquid impermeable liner to resist horizontal forces and buoyant uplift forces.
2. The method of claim 1 further comprising anchoring the first liquid impermeable liner in a trench constructed in the berm.
3. The method of claim 1 further comprising attaching the first continuous liquid impermeable liner to the existing second liner by bonding or adhesively binding, or by mechanical attachment.
4. A method of elevating the height of a berm comprising placing light weight rigid foam material having a density less than 5 pounds per cubic foot, compressive strength greater than 2 psi, and a flexural strength greater than 10 psi and further comprising covering a liquid impermeable liner over the lightweight rigid foam material; and anchoring the lightweight rigid foam material from horizontal loads and vertical buoyant forces.
5. The method of claim 4 further comprising covering the liquid impermeable liner wherein the liquid impermeable liner may be at least one of the following materials: High Density Polypropylene (HDPE), Low Density Polypropylene (LDPE), PVC, and polyurea composites comprising a geotextile coated with polyurea, which secures the lightweight fill rigid foam material.
6. The method of claim 4 further comprising installing rebar with the lightweight rigid foam material.
7. The method of claim 4 further comprising anchoring the light weight rigid foam material with soil.
8. The method of claim 4 further comprising anchoring the light weight rigid foam material by installing a portion of the covering liquid impermeable liner in a trench constructed within the berm.
9. The method of claim 4 wherein the step of placing lightweight rigid foam material comprises installing expanded polystyrene.
10. The method of claim 4 further comprising covering the lightweight rigid foam material with an impermeable liner having a density greater or equal to 5 lbs per cubic foot.
11. A method of installing a height extension to an existing berm with an existing second impervious liner system comprising the steps: a) excavating an anchor trench at the berm crest for a first liner that will cover a lightweight rigid foam material; c) attaching the first liner to an existing second liner; d) laying back the first liner to allow placing of the lightweight rigid foam material on the berm crest wherein the lightweight rigid foam material has a density less than 5 pounds per cubic foot, compressive strength greater than 2 psi, and a flexural strength greater than 10 psi; e) laying the first liner over the lightweight rigid foam material to hold the lightweight rigid foam material at the top of the berm; and f) installing an outside edge of the first liner into anchor trench.
12. A liquid retention berm height extension system comprising: a) a lightweight rigid foam material placed on a berm wherein the lightweight rigid foam material has a density of 5 pounds per cubic foot or less, compressive strength of 2 psi or greater, and a flexural strength of 10 psi or greater; and b) a first liquid impermeable liner placed over the lightweight rigid foam material wherein the first liquid impermeable liner secures the lightweight rigid foam material on the berm.
13. A liquid retention pond berm system comprising: a) a lightweight rigid foam material positioned on a top of a berm and the lightweight rigid foam material has a density less than 5 pounds per cubic foot, compressive strength greater than 2 psi, and a flexural strength greater than 10 psi; b) a liquid impermeable liner extending from a retention basin over and covering both the top of the berm and the lightweight rigid foam material where the fluid impermeable liner is structured to resist tension force to hold the lightweight rigid foam material in position relative to the berm.
14. The liquid retention pond barrier system of claim 13 further comprising mechanical anchors extending through the lightweight rigid foam material into a ground surface of the berm wherein the lightweight rigid foam material also contains plastic properties.
15. The liquid retention pond barrier system of claim 13 further comprising lightweight fill components wherein the lightweight fill components are sections of lightweight rigid foam material wherein each section can be joined with an additional section end to end.
16. The liquid retention pond barrier system of claim 15 wherein the adjoining ends of at least two sections can be joined by inserting one or more rebar sections across and into each section end.
17. The liquid retention pond barrier system of claim 16 wherein the length of the rebar positioned across and into each section end is 4 to 24 inches in length.
18. The liquid retention pond barrier system of claim 15 further comprising sealing the end of a lightweight rigid foam material section to an adjoining section end to create a liquid impermeable seal over which an impermeable liner can be positioned.
19. The liquid retention pond barrier system of claim 15 further comprising installing cast in place or precast concrete over at least one surface of the joined lightweight rigid foam material sections having a density less than 5 pounds per cubic foot, compressive strength greater than 2 psi, and a flexural strength greater than 10 psi wherein the material sections can be joined together by positioning of components including rebar extending across and into each adjoining lightweight rigid foam material section, insertion of sealing compounds between each concrete section, or positioning preformed lightweight rigid foam material sections wherein one end has a male joining component and the other end has a female joining component and the male joining component of one section is complementary sized and fits into the female joining component of the adjoining section.
20. The liquid retention pond barrier system of claim 15 where the lightweight rigid foam material sections have a density less than 5 pounds per cubic foot, compressive strength greater than 2 psi, and a flexural strength greater than 10 psi are joined together by a steel cable and the steel cable is mechanically anchored.
Description
BRIEF DESCRIPTION OF THE DRAWINGS
(1) The accompanying drawings, which are incorporated in and constitute a part of the specification, illustrate preferred embodiments of the disclosure. These drawings, together with the general description of the disclosure given above and the detailed description of the preferred embodiments given below, serve to explain the principles of the disclosure.
(2)
(3)
(4)
(5)
(6)
(7)
(8)
(9)
(10)
(11)
(12)
(13)
(14)
(15)
DETAILED DESCRIPTION AND SPECIFIC EMBODIMENTS
(16) It will be appreciated that not all embodiments of the disclosure can be disclosed within the scope of this document and that additional embodiments of the disclosure will become apparent to persons skilled in the technology after reading this disclosure. These additional embodiments are claimed within the scope of this disclosure.
(17) It should be noted that each installation of this system will present unique engineering challenges that will require customization of the system. These may include, but are not limited to, provision of personnel access routes, pipe penetrations, and custom fitting around existing structures. These are impossible to predict and will vary with the existing conditions and equipment at the individual installation locations. The scope of the Applicant's disclosure is adaptable to each unique engineering challenge by combination of the disclosed systems.
(18) It will be appreciated that retention ponds do not experience a fluid current. The disclosure, however, is also applicable to levees retaining flowing fluid, e.g. water. A current creates a force parallel with the face of the lightweight fill material, i.e., the surface of the lightweight fill material facing the fluid. A current may also be experienced at the inlet or outfall of a retention pond. In such applications, it may be advantageous to utilize anchors that penetrate the lightweight fill materials and extend into the soil comprising the berm. An example of this is shown in
(19)
(20)
(21) The double liner is typically installed in instances where little or no leakage of the fluid is desired or permitted by law. The double liner consists of a Primary Liner, 7 that is the primary impervious layer in the system. Liner 7 is typically terminated in an anchor trench 6A, placed along the berm crest. The anchor trenches 6A and 6B are engineered to provide adequate soil mass to prevent pullout or displacement of the respective liners 7 and 9 and can also anchor the drainage layer 8. The Primary Liner may be the top liner of the double liner system. Two anchor trenches 6A and 6B are shown. One anchor trench 6B may be used to secure the Secondary Liner. The anchor trench stabilizes the liner against displacement and is typically backfilled with compacted soil. Secondary Liner 9, provides a backup impervious liner and enables installation of leak detections systems to determine the quantity of leakage through the primary liner. A drainage layer 8, is typically installed between liners 7 & 9 to cushion and protect the primary liner and to provide means for leakage through the primary liner to be directed and collected in a leak detection system. The drainage layer can be constructed of a sand layer or a synthetic material such as a geonet.
(22) Liners 7 & 9 are typically constructed of High Density Polypropylene (HDPE), Low Density Polypropylene (LDPE), Polyvinyl Chloride (PVC), poly urea composites, or polyethylene. They are installed to form a continuous liner in the reservoir.
(23) This double liner system presents challenges to any attempt to raise the height of the existing levee as the integrity of the anchor trenches and liners must be preserved to maintain the system.
(24)
(25)
(26)
(27)
(28)
(29)
(30) As an alternate to the mechanical anchor, the foam could be bonded adhesively or mechanically to a concrete foundation or other rigid material 31 as a means of anchoring the system against movement towards the interior. This detail is shown in
(31)
(32)
(33) In another embodiment illustrated in
(34)
(35) Embodiment A (
(36) Embodiment A could also be constructed by adding a second impervious liner over liner 11 and providing an additional attachment point to the existing liner and an installing the second liner into the anchor trench 14.
(37) Embodiment E or B (
(38)
(39) In this embodiment the weight of the light weight fill material structure is supplemented by the addition of more dense material. The high mass insert 29, could be constructed of any material of sufficient density to provide the required resistance to displacement or overturning. This supplemental mass can be concrete poured and cured in a mold wherein the shape of the mold is complementary to an indentation formed within the structure of the lightweight fill material. Materials such as sand bags, geo-tubes, and steel shapes, would be examples of materials also available. As this method would require the use of additional materials, it is envisaged that this embodiment would not be as economical as other embodiments. It will be appreciated that the lightweight fill material is transported and positioned at the berm crest without the supplemental weight. The weight can be added after the structure is in position. In one embodiment, the weight may be less than 100 lbs. and manually positioned into the structure. It will be appreciated that a structure can have multiple indentations to receive the supplemental weight. The advantage of this system will be to allow the structure to have increased mass without requiring mechanical equipment, e.g., mechanical lifting equipment or carrying equipment, to be brought to the site. (The supplemental mass may be manually placed within the structure.) It will be appreciated that access to the site of the berm may be restricted. Illustrated is the lightweight fill material structure 12 and the supplemental mass 29 fitting into an indenture of the fill structure. The high mass insert 29, could be anchored or bonded to the lightweight fill material 12. Also illustrated is the anchoring trench 14 containing the end of the liner 11 that is placed over the fill structure and continues to cover the inner surface of the berm.
(40) In another embodiment, the lightweight fill sections can be joined together end to end. This is particularly useful when the lightweight fill material comprise sections of expanded polystyrene (EPS) or a similar lightweight rigid foam plastic material. The lightweight fill material (components or sections) are prefabricated offsite into selected shapes. Each section can be between 6 and 30 feet in length. Other dimensions are possible. The sections can be variable in height. The lower portion of the section can be broader than the upper section to enhance stability. The sections can be placed end to end on the berm crest.
(41) The ends of the lightweight fill material sections can be joined together. This can be accomplished by inserting rebar into each end or using commercially available anchors as in embodiment E. In one embodiment, the length of rebar inserted into each section can be 4 to 24 inches. The rebar can be precut, thereby facilitating prompt assembly in the field. Each juncture can be linked together by multiple sections of rebar. It will be appreciated that the linking together of each component will prevent one component or section of lightweight fill material from being pushed out of line, causing a gap to form in the extended height berm subject of this disclosure. The rebar can be fitted into indentations or holes within section ends of the lightweight fill material. It will be appreciated that the length of the rebar section, preferably greater than 20 inches, will improve the stability of the junction between two sections of the lightweight fill material. The greater unified length of the lightweight fill sections will protect against a localized surge in fluid level and help to facilitate construction by anchoring the lightweight fill material sections together prior to anchoring them by enclosing them with the liner 11. Multiple lightweight fill sections could also be joined together using continuous steel cables inserted lengthwise through preformed penetrations in each section of the lightweight fill material. This steel cable could be mechanically anchored to the existing berm to provide additional structural stability. The cable diameter, material of construction and spacing of the mechanical anchors would depend on the specific design parameter of each installation.
(42) In another embodiment, the ends of each lightweight fill material are modified in the manufacturing process to create male and female protrusions and indentations at each end. Therefore one end of the lightweight fill component would contain a male protrusion and the other end would contain a female indentation. The indentations and protrusions would be complementary dimensioned to allow the male end of a first component to fit into the female end of a second component. As with the joining the ends with rebar, the joined sections of lightweight fill material would prevent one section from being pushed back. In both cases (rebar linkage or male/female end coupling), the series of lightweight fill material would act as a unified structure or barrier.
(43) In another embodiment the lightweight fill materials completely surround a retention pond. Therefore the ends of each section of lightweight fill material abut the end of another section. In another embodiment where the lightweight fill material forms a levee structure, the series of sections of lightweight fill material may end where the ground level exceeds a specified elevation. The end section may be dug into the ground at the point that the ground level exceeds the specified elevation. This would serve to anchor the end of the section linked in accordance with a preceding paragraph beginning with the text stating “
(44) This specification is to be construed as illustrative only and is for the purpose of teaching those skilled in the art the manner of carrying out the disclosure. It is to be understood that the forms of the disclosure herein shown and described are to be taken as the presently preferred embodiments. As already stated, various changes may be made in the shape, size and arrangement of components or adjustments made in the steps of the method without departing from the scope of this disclosure. For example, equivalent elements may be substituted for those illustrated and described herein and certain features of the disclosure may be utilized independently of the use of other features, all as would be apparent to one skilled in the art after having the benefit of this description of the disclosure.
(45) While specific embodiments have been illustrated and described, numerous modifications are possible without departing from the spirit of the disclosure, and the scope of protection is only limited by the scope of the accompanying claims.