Patent classifications
B61L13/00
Information transmission system and information transmission method for rail transport
An economical information transmission system for rail transport includes a transmitter having a known transmission power for communication between a track section and a rail vehicle. A receiver has at least one first adjustable receive level threshold, with which a maximum distance between the transmitter and the receiver can be defined in a particular application, within which the receiver is able to receive with respect to the transmitter. An information transmission method is also provided.
Information transmission system and information transmission method for rail transport
An economical information transmission system for rail transport includes a transmitter having a known transmission power for communication between a track section and a rail vehicle. A receiver has at least one first adjustable receive level threshold, with which a maximum distance between the transmitter and the receiver can be defined in a particular application, within which the receiver is able to receive with respect to the transmitter. An information transmission method is also provided.
CONSTANT MONITORING SYSTEM FOR RAILWAY VEHICLE
Provided is a constant monitoring system for a railway vehicle that is monitorable of a dimensional change of a railroad truck during running. The present disclosure is the constant monitoring system for the railway vehicle that includes a sensor and a calculator. The sensor detects passage therethrough of wheels included in the railroad truck of the railway vehicle. The calculator calculates an inter-axle distance between two axles of the railroad truck based on a detection result obtained from the sensor. The sensor includes two displacement sensors of non-contact type that detect the passage of the wheels from respective different locations.
OPERATION STATUS REPRODUCING DEVICE, DISPLAY DEVICE, AND OPERATION STATUS REPRODUCING METHOD
An operation status reproducing device includes an onboard information obtaining unit that obtains onboard information corresponding to date and time from an onboard device mounted on a designated train being a train specified by a train number and the date and time externally designated, a specific event detecting unit that specifies time at which a specific event occurs by analyzing the onboard information, a ground information obtaining unit that obtains ground information in a certain period including the time at which the specific event occurs from a ground device, an external information obtaining unit that obtains external information including weather information in a certain period including the time at which the specific event occurs, and a reproduction image generating unit that generates a reproduction image illustrating a past operation status of the designated train based on the onboard information, the ground information, and the external information.
System and method for controlling a wayside device
A system includes at least one signal light having at least one lamp. The system further includes a control device electrically connected to the at least one lamp by a conductive cable. The at least one lamp is configured to flash in response to the loss of an audio signal generated by the control device.
Bond pin assembly for connecting connection cables
A bond pin assembly for connecting a connection cable with a rail, comprising: a bond pin that is inserted into a through hole in the rail, said bond pin having a transition portion and a screw portion, a diameter of one end of the transition portion being larger than a diameter of the other end of the transition portion, the end of the transition portion having a smaller diameter being connected with the screw portion; a conductive sleeve that is provided between the bond pin and a wall of the through hole of the rail, and a nut that is screwed on the screw portion to fasten an end of the connection cable between the nut and a side wall of the rail. By inserting the conductive sleeve with the shape corresponding to those of the through hole and the bond pin between the through hole and the bond pin and further taking fastening measure, the structural intensity of the bond bin assembly can be increased effectively.
Train safety warning system
A system for providing train safety warnings can include a train vehicle positioned on and movable along a track, as well as a warning device. The warning device can be associated with a receiving device that is in signal communication with a transmitter, such as a transmitter included on the train vehicle. An emitter of the warning device is configured to output an indication that the train vehicle is approaching based on the signal communication with the transmitter. In some instances, the warning device, and/or the emitter thereof, can be positioned at a same elevation as the track.
DETECTION OF DYNAMIC TRAIN-TO-RAIL SHUNTING PERFORMANCE
Systems and methods for detecting the dynamic train-to-rail shunting performance of a train as it is moving along the rails of a railroad track. The systems and methods use portable equipment temporarily installed at a site where it is desired to test the shunting of one or more trains or the electrical equipment installed at the track. The systems and method use sensor plates and a high speed recording system to simultaneously capture measured train-to-rail shunting characteristics and the positioning of a train's axles and any rail conditions impacting the measurements. The captured information can be used to fine tune the train, the electrical equipment installed at the track and/or to design new devices.
Automated in motion railway seismic wheel failure detection system
Systems and methods for detecting in motion railcar seismic data generated by defective railcar axles of a train traveling on a track. The method uses two or more seismic sensors on the side of the track to capture seismic noise generated by railcar wheels. A wheel that exceeds a preset seismic noise threshold in amplitude, will trigger a wheel tracking algorithm that calculates seismic phase shift data related to the actively tracked wheel noise level, to determine the precise location, in real time, of the faulty wheel carriage while moving. Knowing the precise location of the tracked wheel allows the system to isolate the railcar and capture the railcar and wheel carriage identification information. Subsequently, a railcar log is made on a computer database with the railcar identification information and made available to control centers via ground or satellite links.
Detection of dynamic train-to-rail shunting performance
Systems and methods for detecting the dynamic train-to-rail shunting performance of a train as it is moving along the rails of a railroad track. The systems and methods use portable equipment temporarily installed at a site where it is desired to test the shunting of one or more trains or the electrical equipment installed at the track. The systems and method use sensor plates and a high speed recording system to simultaneously capture measured train-to-rail shunting characteristics and the positioning of a train's axles and any rail conditions impacting the measurements. The captured information can be used to fine tune the train, the electrical equipment installed at the track and/or to design new devices.