E02D7/00

CONSTRUCTION METHOD
20200399852 · 2020-12-24 · ·

The invention relates to a construction method, in which an excavation pit is produced in the ground and in the excavation pit foundation elements are produced at predetermined working points with at least one working apparatus. According to the invention provision is made in that in a computer unit the dimensions of the excavation pit, the working points and the dimensions of the at least one working apparatus are entered and in that in the computer unit a required workspace for the at least one working apparatus and an open space in the excavation pit are determined automatically.

Foundation pile, a grouting method for the said pile and a manufacturing method therefor

A foundation pile comprising a longitudinal through hole (1) and a plurality of crosswise through holes (2) transverse to longitudinal through hole (1) extending between longitudinal through hole (1) and the outer surface of the pile and optionally further comprising check valves positioned in the crosswise through holes (2), configured such that the crosswise through holes (2) and the check valves allow one-way communication from the inside of the pile to the outside of the pile from longitudinal through hole (1) to the outer side surfaces of the pile.

Foundation pile, a grouting method for the said pile and a manufacturing method therefor

A foundation pile comprising a longitudinal through hole (1) and a plurality of crosswise through holes (2) transverse to longitudinal through hole (1) extending between longitudinal through hole (1) and the outer surface of the pile and optionally further comprising check valves positioned in the crosswise through holes (2), configured such that the crosswise through holes (2) and the check valves allow one-way communication from the inside of the pile to the outside of the pile from longitudinal through hole (1) to the outer side surfaces of the pile.

Combination pier

A combination pier includes: a pile disposed in a bore hole from the bottom of the bore hole to a desired depth; and a pier disposed in the bore hole from the desired depth to the surface. A method for constructing a combination pier includes: forming a pile in a bore hole from the bottom of the bore hole to a desired depth; and forming a pier from the desired depth to the surface.

Combination pier

A combination pier includes: a pile disposed in a bore hole from the bottom of the bore hole to a desired depth; and a pier disposed in the bore hole from the desired depth to the surface. A method for constructing a combination pier includes: forming a pile in a bore hole from the bottom of the bore hole to a desired depth; and forming a pier from the desired depth to the surface.

Method for constructing building on water-body
10808371 · 2020-10-20 · ·

A method for constructing a building on a water-body. The method includes piling a plurality of piles on a bed of the water-body for laying a foundation for the building. The method further includes marking a reference-mark on each of the plurality of piles at a predefined-distance from a surface of the water-body. The method also includes cutting each of the plurality of piles along the reference-mark. The method further comprises installing a first pile-cap, having a plurality of guiding elements extending therefrom, over a first set of piles of the plurality of piles. The method also comprises installing a second pile-cap over a second set of piles of the plurality of piles.

Method for constructing building on water-body
10808371 · 2020-10-20 · ·

A method for constructing a building on a water-body. The method includes piling a plurality of piles on a bed of the water-body for laying a foundation for the building. The method further includes marking a reference-mark on each of the plurality of piles at a predefined-distance from a surface of the water-body. The method also includes cutting each of the plurality of piles along the reference-mark. The method further comprises installing a first pile-cap, having a plurality of guiding elements extending therefrom, over a first set of piles of the plurality of piles. The method also comprises installing a second pile-cap over a second set of piles of the plurality of piles.

CIVIL ENGINEERING UNDERGROUND EQUIPMENT AND METHOD FOR OPERATING CIVIL ENGINEERING UNDERGROUND EQUIPMENT
20200318469 · 2020-10-08 · ·

The invention relates to civil engineering underground equipment comprising at least one work element for ground work, at least two actuation units, at least one measuring device for determining at least one current actuation parameter for each actuation unit, and a controller which is designed for controlling the actuation units, wherein the controller is connected to the measuring devices and, in order to prevent a tipping of the civil engineering underground equipment, is designed to limit a further actuation of the actuation unit or to display to an operator that the limit actuation parameter has been reached and/or the limit actuation parameter, on the basis of previously calculated limit actuation parameters for the actuation units which define exactly one permissible operating range, when a limit actuation parameter of at least one actuation unit is reached. It is intended for at least two different individual operating ranges to be stored in the controller, wherein each individual operating range comprises a different set of limit actuation parameters for the actuation units, and for the controller to be able to determine a combined permissible operating range.

STRUCTURAL SHEET SPUR
20200308793 · 2020-10-01 · ·

A structural pile sheet spur including a void creating section located in a fore part of the spur, a pile sheet interfacing section located in an aft part of the spur, and a fluid delivery passageway located in or adjacent to the pile sheet interfacing section.

SECURING MEANS FOR SECURING A CIVIL ENGINEERING ELEMENT, AND CIVIL ENGINEERING METHOD
20200291595 · 2020-09-17 · ·

The invention relates to a securing means and a method for securing a civil engineering element to a construction machine by means of a flexible securing element, wherein a first end of the flexible securing element is attached to the construction machine and a second end is provided with a connecting link which can pass through a securing lug on the civil engineering element and can be releasably fastened to the construction machine by a connecting means. According to the invention, a detection unit is provided on the connecting means, which detection unit is designed for identifying fastening of the connecting link to the connecting means. The detection unit can generate and output a signal if fastening of the connecting link is identified.