E21D9/00

Cutting tool for a tunnel boring machine and a tunnel boring machine

A cutting tool for a tunnel boring machine, including a tool head equipped with a wear sensor detachably connectable to a tool holder. A line arrangement having a wireless, connector-free coupling module between the tool head and the tool holder is provided for connecting the wear sensors to an evaluation module. In the event of wear, a tool head to be replaced may be removed from the tool holder and a new tool head may be connected to the tool holder.

Method and apparatus for the bottom-up construction of vertical risers from underground passes through the soil, using a pipe jacking equipment
11441423 · 2022-09-13 · ·

A “Riser Concept” Method and Apparatus includes the bottom-up construction of vertical risers from underground passes through the soil, using a pipe jacking equipment. The pipe jacking equipment vertically push the riser pipe from underground pass upwards through soil formations to waterbody, air intake, terrain surface or like. The method and mechanism can be applied either in traditionally bored tunnel or in tunnel bored by tunnel boring machine.

TRIGGERING EXPLOSIVES IN HOLES

An assembly (7) for triggering an explosive in a hole (9) to produce an explosive blast in the hole includes (a) an explosion trigger (15, 19) for triggering the explosive in the hole, (b) a detonation unit body (21) that is configured to be located at or proximate an open end of the hole in an initial position of the assembly in the hole and (c) a trigger cord (31) that is connected to the detonation unit body and to the explosion trigger.

Optimization of boring by a tunnel boring machine as a function of ground/machine interactions

The invention relates to a method (S10) for optimizing the characteristics of a tunnel boring machine, particularly a tunnel boring machine of the slurry pressure or VD type, said method comprising the following steps: S0: determining a ground/machine interaction model, S11: instantaneous measurement of the set of specific boring parameters of the tunnel boring machine, S13: determining the group of individuals corresponding to the boring parameters measured in step S11 by means of the ground/machine interaction model, S14: optimizing the characteristics of the tunnel boring machine as a function of the group of individuals thus determined.

Dynamic working area

A method for defining a working area of a rock drilling rig including the steps of determining at least one current input parameter, determining a working area that defines a reach of the drilling unit in a control unit on the basis of the at least one current input parameter and at least one fixed reach parameter, displaying a graphical representation of the working area on a display, and re-determining the working area and updating the graphical representation of the working area dynamically in response to a change in the input parameters. The current input parameter may be, for example, an orientation of the rock drilling rig or a hole parameter.

TUNNEL BORING MACHINE, MEASUREMENT METHOD, AND MEASUREMENT SYSTEM

A tunnel boring machine includes: a disc cutter including a cutter ring; and a member for use in measurement of a wear amount of the cutter ring with a three-dimensional shape measurement device, in which the member is provided at a part constant in relative position to the cutter ring.

SYSTEM AND METHOD OF MONITORING VIBRATION OF A BLASTING MODEL TEST FOR A JOINTED ROCK MASS

An improved system of monitoring vibration of a blasting model test for a jointed rock mass and a method are provided. The system includes: a loading subsystem for three-way load, a model-surface blasting-vibration acquisition subsystem, and a model-interior dynamic stress-strain acquisition subsystem. The system and the method are provided, and a blasting model for a transparent jointed rock mass and a monitoring method that are obtained can analyze the influence of a joint inclination angle on propagation and attenuation laws of blasting stress waves in the jointed rock mass, and can analyze the influence of different millisecond blasting modes on the stability of an existing tunnel in the jointed rock mass, and can capture a real-time dynamic evolution process of cracks. The stress and strain measurement technologies used can perform omnibearing monitoring and recording for large deformations of surrounding rock under blasting load, and can resist the electromagnetic interference.

SYSTEM AND METHOD OF MONITORING VIBRATION OF A BLASTING MODEL TEST FOR A JOINTED ROCK MASS

An improved system of monitoring vibration of a blasting model test for a jointed rock mass and a method are provided. The system includes: a loading subsystem for three-way load, a model-surface blasting-vibration acquisition subsystem, and a model-interior dynamic stress-strain acquisition subsystem. The system and the method are provided, and a blasting model for a transparent jointed rock mass and a monitoring method that are obtained can analyze the influence of a joint inclination angle on propagation and attenuation laws of blasting stress waves in the jointed rock mass, and can analyze the influence of different millisecond blasting modes on the stability of an existing tunnel in the jointed rock mass, and can capture a real-time dynamic evolution process of cracks. The stress and strain measurement technologies used can perform omnibearing monitoring and recording for large deformations of surrounding rock under blasting load, and can resist the electromagnetic interference.

APPARATUS, METHOD AND COMPUTER PROGRAM PRODUCT FOR DESIGNING BLASTING ORDER
20220099424 · 2022-03-31 ·

An apparatus and method for designing a blasting sequence for a drilling pattern of a round. The apparatus (11) is configured to assist selecting one or more drill holes (3) for each time delay of the blast. The apparatus calculates burst volume (V.sub.B) for the selected drill hole set (34) and ensures that previously blasted free volume (V.sub.F) can receive it when being fired. The apparatus may also take into account burst angles burst distances and ground vibrations when suggesting the drill hole sets.

Method and apparatus for monitoring the interaction between surrounding rocks and TBM in TBM tunneling process
11277675 · 2022-03-15 ·

Provided is a method and an apparatus for real-time monitoring interaction between surrounding rocks and the TBM in a TBM tunneling process. Interaction between target objects is monitored by one or more sensors to obtain test data. A first electronic device connects a collecting module with the one or more sensors through a communication serial interface of the one or more sensors. A connection state between the one or more sensors and the collecting module is judged. The connection abnormality information is recorded or the collection parameters according to the connection state are set. The first electronic device judges the collection state by monitoring the collection, and records collection abnormality information or performs one-time collection of data according to the collection state. The first electronic device stores the data in a first storage folder. A second electronic device analyzes the data, and transmits the data to a monitoring device.