Patent classifications
E02D2600/00
Cellular and ballasted universal pole foundation
A volumetric enclosure or enclosures and/or a cellular structure pole foundation is provided. The volumetric enclosure/s or cellular structure pole foundation may employ several embodiments: (1) a single or a plurality of volumetric enclosures at the vertical center of the foundation below the foundation's pole cavity; (2) a single or a plurality of volumetric enclosures at the vertical center of the foundation below the foundation's pole cavity and a cellular structure within the foundation walls and base; (3) a cellular structure throughout the entire body of the foundation; (4) a cellular structure within the foundation walls; (5) the above embodiments with fill material consisting of gas or fluid or solids retained inside the foundation walls; and (6) the above embodiments with solid fill material that can reach the foundation core through the pole cavity.
FOUNDATION STRUCTURAL DESIGN WITH CELLS CONFIGURED TO REDIRECT AND DISTRIBUTE STRESS LOADS
A structural design of a foundation that is configured to reduce size, fabrication time, material usage and installation time by prefabricated machine produced structural cellular and/or volumetric design that distributes and redirects stress loads from the above over extended exterior surface contact areas of a below grade embedded foundation.
Bearing cooling systems and methods for vibratory pile drivers
A bearing cooling system for a vibratory pile driving system comprising at least one housing wall defining at least one bearing opening and at least one bearing assembly supported by the at least one housing wall in the at least one bearing opening. The bearing cooling system comprises a bearing cover plate, a bearing cover seal member, and at least one bearing bolt. The bearing cover plate defines an inner surface having a bearing cover plate seal recess. The bearing cover seal member adapted to be received at least partly within the bearing cover plate seal recess. The at least one bearing bolt is configured to secure the bearing cover plate relative to the at least one housing wall to form at least one contact location at which the bearing cover plate is in contact with at least a portion of the at least one bearing assembly.
Universal pole foundation
A pre-fabricated pole foundation provided employing a cavity to retain pole assembly of different profile, shape, size, and material interchangeably, a tapered structure onto which the pole rests, and recesses in the pole cavity wall enabling foundation hoisting, plumbing and anchoring, whereas the cavity wall is capable to accommodate for electronic devices enclosure and fill material provides structural support to an embedded pole or the embedded pole and foundation.
Foundation for a wind turbine
The invention relates to a foundation for a wind turbine, wherein the foundation comprises substantially prefabricated elements, preferably made of reinforced concrete, with a first, vertically extending base-like portion, on which a tower of the wind turbine can be arranged, and a second substantially horizontally extending portion as foundation body, which is in contact with the ground. The first portion is arranged above the second portion and has at least one closed, preferably sleeve-shaped, base element, which is annular or polygonal, and the second portion is formed from at least two horizontal elements, which each have at least one base portion. The at least one base element of the first portion and the base portion of the horizontal element of the second portion have substantially vertical apertures, which are mounted in line with one another and in which substantially vertical bracing elements, preferably threaded rods, are arranged. The at least one base element of the first portion and the at least two horizontal elements of the second portion are preloaded against one another by the substantially vertical preloading elements. No further fastening means, in particular horizontal fastening means, are necessary for dissipation of the loads from the wind turbine.
Barbed micropiles for soil reinforcement
A barbed micropile for soil reinforcement at a target location and a method for soil reinforcement at a target location. The barbed micropile includes a conical-head pipe which comprises a hollow rod, a conical head, and a first plurality of T-shaped elements mounted around an outer surface of the hollow rod. The method may include generating a cavity at the target location, filling the cavity with grout, generating a well at the target location by inserting a barbed micropile into the ground at the target location, filling a space between the barbed micropile and the well's wall with grout, and filling an inner chamber of the hollow rod.
SHEATH FORMED BY AT LEAST ONE CIRCULAR KNIT FOR PRODUCING A REINFORCED CONCRETE PILE
A sheath for constructing a reinforced concrete pile, characterized in that the sheath is formed by at least one circular knit comprising having a series of meshes helically positioned so as to form a pipe. A method for constructing a reinforced concrete pile includes excavating to form a well, inserting one end of a reinforcing rod in a sheath, positioning the sheath on an area of the rod and introducing the rod into the well, installing a tremie pipe inside the rod, and filling the well with concrete using the tremie pipe.
Method and device for producing a foundation element in the ground
The invention relates to a method and a device for producing a foundation element in the ground, wherein a hole is formed in the ground which is filled with a hardenable filling mass in order to form the foundation element. According to the invention provision is made in that prior to the hardening of the filling mass a data carrier is introduced into the hole, on which information on the produced foundation element is stored .
Universal pole foundation
A pre-fabricated load bearing structural assembly includes a foundation, a pole, and a cap. At least one of the foundation and the cap is unitary fabricated with at least one internal cellular and/or volumetric enclosure that transfers lateral and axial stresses away from the pole. A pole section disposed inside a foundation pole cavity is configured to rest on a corresponding support structure centrally disposed at the bottom of the cavity. The pole section exterior wall/s profile and dimensions in proximity to the pole cavity aperture is/are precisely defined. At least one cap, precisely fabricated, fills in the gap between the exterior wall/s of the pole and the inner wall/s of the pole cavity in proximity to the aperture opening of the pole cavity. The pole resting on the corresponding centrally disposed structure at the bottom of the pole cavity is plumbed by the precisely fabricated cap.
Basket assembly operation for autonomous pile driving system
A pile plan map indicating a plurality of locations in a geographic area at which piles are to be installed is accessed. A first set of locations is identified from the plurality of locations and a first set of piles to be driven into the ground at the first set of locations using the pile plan map is identified. An order for driving the first set of piles into the ground is identified and a pile type for each of the first set of piles is identified. Basket assembly instructions are generated for assembling the first set of piles into a basket based on the identified order and the identified pile types. The first set of piles are assembled autonomously or manually into the basket based on the generated basket assembly instructions.