Patent classifications
E02D29/00
DRAIN ASSEMBLY FOR USE IN AN OUTDOOR SETTING
A drain assembly capable of being placed inground includes a first panel and a second panel spaced-apart from the first panel, a plurality of supports extending between the first panel and the second panel, a bottom or pipe extending between a bottom portion of the first panel and the second panel, and a cap extending between a top portion of the first panel and the second panel. The first panel may define a plurality of drainage apertures. A related method is also provided.
TREATMENT METHOD FOR A RIVER SYSTEM IN A RESERVOIR AREA AND TREATMENT SYSTEM
A treatment method for a river system in a reservoir area, comprising: S1. determining whether a time from a current date to the rainy season is less than a preset duration; S2. moving a pressure sensor upward; S3. determining whether the pressure data meets corresponding conditions; S4. determining whether a duration of the pressure data is less than the preset duration; S5. determining whether an interval between the current time and the time for collecting pressure/nitrogen and phosphorus is greater than a preset number of days; S6. acquiring an image information of a river bottom, and sending it to neural network model for identification to obtain a depth of a sludge; S7. determining whether the depth of a sludge has reached a dredging depth, if so, starting a sludge pump to clean up; S8. collecting nitrogen and phosphorus concentration, and removing nitrogen and phosphorus when the concentration exceeds a standard.
TREATMENT METHOD FOR A RIVER SYSTEM IN A RESERVOIR AREA AND TREATMENT SYSTEM
A treatment method for a river system in a reservoir area, comprising: S1. determining whether a time from a current date to the rainy season is less than a preset duration; S2. moving a pressure sensor upward; S3. determining whether the pressure data meets corresponding conditions; S4. determining whether a duration of the pressure data is less than the preset duration; S5. determining whether an interval between the current time and the time for collecting pressure/nitrogen and phosphorus is greater than a preset number of days; S6. acquiring an image information of a river bottom, and sending it to neural network model for identification to obtain a depth of a sludge; S7. determining whether the depth of a sludge has reached a dredging depth, if so, starting a sludge pump to clean up; S8. collecting nitrogen and phosphorus concentration, and removing nitrogen and phosphorus when the concentration exceeds a standard.
Bailey support system applied to cross protection of complex pipes and cables and construction method thereof
Disclosed is a Bailey support system applied to cross protection of complex pipes and cables in an intersection tunnel, including a type I suspension system, a type II suspension system, type III suspension systems, a type IV suspension system, and a type V suspension system, where two groups of the type III suspension systems are disposed on a front side of the type IV suspension system, and two groups of the type III suspension systems are disposed on a rear side of the type IV suspension system and are in one-to-one correspondence with the other two groups disposed on the front side, the type II suspension system and the type I suspension system are sequentially disposed on a left side of the type IV suspension system from left to right, and the type V suspension system is disposed on a right side of the type IV suspension system.
Local Deep Excavation and Backfilling Structural Subgrade and Its Rapid Construction Method
A subgrade with local deep excavation and backfilling structure and a rapid construction method thereof are provided. Supporting cast-in-place piles are laid at positions where an underground pipe gallery is located in a subgrade structure, and soil there between are longitudinally excavated to form a line-shaped foundation pit. A bottom of the line-shaped deep foundation pit is reinforced to support the underground pipe gallery, and lateral peripheral regions and top peripheral regions of the underground pipe gallery are backfilled with block geobag reinforced fillers. Geogrids are placed on the top of the underground pipe gallery, then backfilling compaction and reinforcing are performed, and the geogrids are fixedly assembled with anchor bolts. The construction method is simple and easy. By using compacted block geobag reinforced fillers and cement solidified slurry, an overall quality of the subgrade structure after backfilling can be ensured, and construction period and cost can be greatly reduced.
Ring-wing floating platform
A ring-wing floating platform is disclosed. The ring-wing floating platform includes a floating hull, a top of the floating hull being above a sea surface and its geometry at a water plane is centrally symmetric, a ring-wing surrounding a perimeter of a bottom of the floating hull with a horizontal projection of concentric annular geometries, a positioning system located at the bottom of the floating hull, and a topsides located above the floating hull and connected to the floating hull by deck legs or installed directly on the top of the floating hull. The axes of the ring-wing and the floating hull are collinear, and their bottoms are in a same horizontal plane. The ring-wing and the floating hull are connected together as a unitary structure by multiple connecting components with an annular gap in-between.
Ring-wing floating platform
A ring-wing floating platform is disclosed. The ring-wing floating platform includes a floating hull, a top of the floating hull being above a sea surface and its geometry at a water plane is centrally symmetric, a ring-wing surrounding a perimeter of a bottom of the floating hull with a horizontal projection of concentric annular geometries, a positioning system located at the bottom of the floating hull, and a topsides located above the floating hull and connected to the floating hull by deck legs or installed directly on the top of the floating hull. The axes of the ring-wing and the floating hull are collinear, and their bottoms are in a same horizontal plane. The ring-wing and the floating hull are connected together as a unitary structure by multiple connecting components with an annular gap in-between.
Method and system for shielding against natural disasters, terror acts and war hazards
It is provided an underground structure, usable at least as a shelter, having a light weight substantially cylindrical portion, of a cylindrical casing having a weight to area ratio in the range of 8 to 30 kg/m2. The casing has a strength level and an impermeability level high enough for serving as part a sealable underground liquid storage tank and at least one sealable opening connecting it to external spaces. The cylindrical portion includes openings for entering and exiting the interior of the portion, and passageways communicate the structure with outside spaces. The surrounding ground provides a geo-thermal reservoir which is used to regulate by a flowing fluid the temperature of the shelter space, modules inside the shelter or above ground structures. The structure includes provisions for receiving of variety of auxiliary systems like an air-treatment system, communication system water and power supply.
Method and system for shielding against natural disasters, terror acts and war hazards
It is provided an underground structure, usable at least as a shelter, having a light weight substantially cylindrical portion, of a cylindrical casing having a weight to area ratio in the range of 8 to 30 kg/m2. The casing has a strength level and an impermeability level high enough for serving as part a sealable underground liquid storage tank and at least one sealable opening connecting it to external spaces. The cylindrical portion includes openings for entering and exiting the interior of the portion, and passageways communicate the structure with outside spaces. The surrounding ground provides a geo-thermal reservoir which is used to regulate by a flowing fluid the temperature of the shelter space, modules inside the shelter or above ground structures. The structure includes provisions for receiving of variety of auxiliary systems like an air-treatment system, communication system water and power supply.
PREFORMED DUCT ASSEMBLY
A duct bank assembly may include an elongate extending conduit with a length for receiving and passing through a cable or wire and an encasing body encasing the conduit along its longitudinal extent between a first mating end and an opposed second mating end of the body. Each mating end of the at least one elongate conduit has a male or female mating end for joining with a corresponding male or female mating end of an abutting duct bank assembly in a self-locking, self-sealing joint.