E04G9/00

Double Production Line and Rapid Prefabrication Process of Segmental Beam

The present application disclosures a double production line and a rapid prefabrication process of a segmental beam. The double production line including two production machine and a track system provided on the construction ground; the production machine includes a fixed end mold, two side molds, a bottom mold trolley, a middle internal mold trolley and two side internal mold trolley; two side molds are positioned on two sides of the fixed end mold respectively, the fixed end mold and two side molds together define a pouring position with an end opening, two openings of the pouring position are arranged facing each other; the track system includes a transverse track and a longitudinal track communicated with each other, two pouring positions are both positioned in the extension path of the transverse track, and the longitudinal track is positioned between two pouring positions.

FOLDING FORM FOR THE CONSTRUCTION OF STRUCTURAL WALLS
20220333335 · 2022-10-20 ·

The present invention relates to a self-supporting, prefabricated, folding form structure or mechanism to be used in the construction industry. It is based on various types of geometries, providing enhanced strength and stability for the concrete and other building material casting process. The object of this invention is a foldable, prefabricated, self-supporting form and does not require a structure. It is configured in a variety of geometric shapes and is based on structural elements that have internal casting chambers or ducts interconnected between each other through perforated holes. This is done by means of internal assembly channels or cavities forming casting chambers. The casting chambers are interconnected with each other, through holes drilled in the structural elements. This way the form features an assembly between its walls through cracks or assembly cuts, creating an architecture of superior engineering that provides higher resistance and stability.

CONSTRUCTION PROCESS OF STRUCTURES WITH EMPTY SEGMENTS AND CONSTRUCTION SYSTEM OF STRUCTURES WITH EMPTY SEGMENTS

The present invention relates to an industrialized construction process of at least part of a structure (1) to be constructed, by applying it, for example, to bridge decks, in which the filling material (8) is poured in situ on empty segments (3) prefabricated ex situ.

The construction process according to the present invention comprises the prefabrication of empty segments (3) including the assembling of steel reinforcement elements (9) and assembling fixing elements (4) whereby these comprise rigid elements (22) and at least part of the moulds (13), which occur at a location (5) ex situ, for example at the factory, construction site or at a place close to the works front line; transport and placement of the empty segments (3) in the final position in the structure (1); the operation of pouring the filling material (8); consolidation or curing of the filling material; prestressing the structure (1), if applicable; removal of the moulds (13) and fixing elements (4); followed by the start of the next cycle, if applicable.

The present invention also relates to a construction system adapted for carrying out a construction process of a structure (1) to be constructed.

CONSTRUCTION PROCESS OF STRUCTURES WITH EMPTY SEGMENTS AND CONSTRUCTION SYSTEM OF STRUCTURES WITH EMPTY SEGMENTS

The present invention relates to an industrialized construction process of at least part of a structure (1) to be constructed, by applying it, for example, to bridge decks, in which the filling material (8) is poured in situ on empty segments (3) prefabricated ex situ.

The construction process according to the present invention comprises the prefabrication of empty segments (3) including the assembling of steel reinforcement elements (9) and assembling fixing elements (4) whereby these comprise rigid elements (22) and at least part of the moulds (13), which occur at a location (5) ex situ, for example at the factory, construction site or at a place close to the works front line; transport and placement of the empty segments (3) in the final position in the structure (1); the operation of pouring the filling material (8); consolidation or curing of the filling material; prestressing the structure (1), if applicable; removal of the moulds (13) and fixing elements (4); followed by the start of the next cycle, if applicable.

The present invention also relates to a construction system adapted for carrying out a construction process of a structure (1) to be constructed.

METHOD FOR PRODUCING A CONCRETE FORMWORK FOR A TOWER SEGMENT, AND METHOD FOR PRODUCING A TOWER SEGMENT FOR A TOWER OF A WIND TURBINE
20200149300 · 2020-05-14 ·

A method for producing a concrete formwork for a component, in particular a tower segment for a tower, preferably a tower of a wind turbine, to a method for producing a component, in particular a tower segment for a tower, preferably a tower of a wind turbine, to a concrete formwork for a component, in particular a tower segment for a tower, preferably a tower of a wind turbine, to a component, in particular a tower segment for a tower, preferably a tower of a wind turbine, and to a pattern of a component, in particular a tower segment for a tower, preferably a tower of a wind turbine.

Construction process of structures with empty segments and construction system of structures with empty segments

An industrialized construction process is provided in which the filling material (8) is poured in situ on empty segments (3) prefabricated ex situ. The process comprises the prefabrication of empty segments (3) including the assembling of steel reinforcement elements (9) and assembling fixing elements (4) whereby these comprise rigid elements (22) and at least part of the moulds (13), which occur at a location (5) ex situ; transport and placement of the empty segments (3) in the final position in the structure (1); pouring the filling material (8); consolidation or curing of the filling material; prestressing the structure (1); and removal of the moulds (13) and fixing elements (4). The present invention also relates to a construction system adapted for carrying out the construction process.

Construction process of structures with empty segments and construction system of structures with empty segments

An industrialized construction process is provided in which the filling material (8) is poured in situ on empty segments (3) prefabricated ex situ. The process comprises the prefabrication of empty segments (3) including the assembling of steel reinforcement elements (9) and assembling fixing elements (4) whereby these comprise rigid elements (22) and at least part of the moulds (13), which occur at a location (5) ex situ; transport and placement of the empty segments (3) in the final position in the structure (1); pouring the filling material (8); consolidation or curing of the filling material; prestressing the structure (1); and removal of the moulds (13) and fixing elements (4). The present invention also relates to a construction system adapted for carrying out the construction process.

Concrete form system with resilient brackets securing form boards to stakes
10323424 · 2019-06-18 ·

A concrete form system includes a plurality of concrete form board brackets. The plurality of brackets includes brackets for securing the concrete form board to a conventional type metal or wood concrete form stake without the need for nails. The plurality of brackets also includes concrete form board end brackets for securing the ends of adjacent concrete form boards together that allows for a range of angles to be formed between two adjacent concrete form boards from zero degrees to more than 180 degrees. The present invention also includes flexible sections of concrete forms configured to be coupled to the brackets that allow for forming curved concrete edges.

Concrete form system with resilient brackets securing form boards to stakes
10323424 · 2019-06-18 ·

A concrete form system includes a plurality of concrete form board brackets. The plurality of brackets includes brackets for securing the concrete form board to a conventional type metal or wood concrete form stake without the need for nails. The plurality of brackets also includes concrete form board end brackets for securing the ends of adjacent concrete form boards together that allows for a range of angles to be formed between two adjacent concrete form boards from zero degrees to more than 180 degrees. The present invention also includes flexible sections of concrete forms configured to be coupled to the brackets that allow for forming curved concrete edges.

CONCRETE FORM SYSTEM
20190032347 · 2019-01-31 ·

A concrete form system includes a plurality of concrete form board brackets. The plurality of brackets includes brackets for securing the concrete form board to a conventional type metal or wood concrete form stake without the need for nails. The plurality of brackets also includes concrete form board end brackets for securing the ends of adjacent concrete form boards together that allows for a range of angles to be formed between two adjacent concrete form boards from zero degrees to more than 180 degrees. The present invention also includes flexible sections of concrete forms configured to be coupled to the brackets that allow for forming curved concrete edges.