E21D13/00

CONSTRUCTION LAYOUT FOR UNDERGROUND CAVERNS IN NUCLEAR ISLAND POWERHOUSE OF UNDERGROUND NUCLEAR POWER PLANT

A construction layout for underground caverns in a nuclear island powerhouse of an underground nuclear power plant, including: two primary caverns accomodating nuclear reactor powerhouses, combined caverns, electric powerhouse caverns, pressure relief caverns, a first primary traffic tunnel, a second primary traffic tunnel, a third primary traffic tunnel, a top adit system, a ground adit system, secondary traffic tunnels, and a side traffic tunnel. Each combined cavern and each electric powerhouse cavern are disposed at two sides of each primary cavern, respectively. Two combined caverns are in end-to-end connection and the arrangement direction of the two combined caverns are in parallel to the connecting line of the medial axes of the two primary caverns. Each pressure relief cavern is disposed between each combined cavern and a corresponding electric powerhouse cavern.

CONSTRUCTION LAYOUT FOR UNDERGROUND CAVERNS IN NUCLEAR ISLAND POWERHOUSE OF UNDERGROUND NUCLEAR POWER PLANT

A construction layout for underground caverns in a nuclear island powerhouse of an underground nuclear power plant, including: two primary caverns accomodating nuclear reactor powerhouses, combined caverns, electric powerhouse caverns, pressure relief caverns, a first primary traffic tunnel, a second primary traffic tunnel, a third primary traffic tunnel, a top adit system, a ground adit system, secondary traffic tunnels, and a side traffic tunnel. Each combined cavern and each electric powerhouse cavern are disposed at two sides of each primary cavern, respectively. Two combined caverns are in end-to-end connection and the arrangement direction of the two combined caverns are in parallel to the connecting line of the medial axes of the two primary caverns. Each pressure relief cavern is disposed between each combined cavern and a corresponding electric powerhouse cavern.

CONSTRUCTION LAYOUT FOR CAVERNS OF UNDERGROUND NUCLEAR POWER PLANT

A construction layout for caverns of an underground nuclear power plant, including: two primary caverns accommodating nuclear reactor powerhouses, combined caverns, electric powerhouse caverns, pressure relief caverns, a first primary traffic tunnel, a second primary traffic tunnel, a third primary traffic tunnel, a top adit system, and a ground adit system. Each combined cavern is disposed on one side of each of the two primary caverns. Each electric powerhouse cavern and each pressure relief cavern are disposed on two sides of each of the two primary caverns perpendicular to the longitudinal direction of the mountain. Each electric powerhouse cavern is perpendicular to the longitudinal direction of the mountain. The first primary traffic tunnel and the third primary traffic tunnel are disposed along the longitudinal direction of the mountain on outer sides of the two combined caverns, respectively.

CONSTRUCTION LAYOUT FOR CAVERNS OF UNDERGROUND NUCLEAR POWER PLANT

A construction layout for caverns of an underground nuclear power plant, including: two primary caverns accommodating nuclear reactor powerhouses, combined caverns, electric powerhouse caverns, pressure relief caverns, a first primary traffic tunnel, a second primary traffic tunnel, a third primary traffic tunnel, a top adit system, and a ground adit system. Each combined cavern is disposed on one side of each of the two primary caverns. Each electric powerhouse cavern and each pressure relief cavern are disposed on two sides of each of the two primary caverns perpendicular to the longitudinal direction of the mountain. Each electric powerhouse cavern is perpendicular to the longitudinal direction of the mountain. The first primary traffic tunnel and the third primary traffic tunnel are disposed along the longitudinal direction of the mountain on outer sides of the two combined caverns, respectively.

CONSTRUCTION LAYOUT FOR CAVERNS OF UNDERGROUND NUCLEAR POWER PLANT

A construction layout for caverns of an underground nuclear power plant, including: two primary caverns accommodating nuclear reactor powerhouses, electric powerhouse caverns, safe powerhouse caverns, auxiliary powerhouse caverns, nuclear fuel powerhouse caverns, connecting powerhouse caverns, a first primary traffic tunnel, a third primary traffic tunnel, a second primary traffic tunnel, a fourth primary traffic tunnel, and a primary steam channel. The electric powerhouse caverns, the safe powerhouse caverns, and the nuclear fuel powerhouse caverns are arranged along the longitudinal direction of the mountain. Each of the safe powerhouse caverns and each of the nuclear fuel powerhouse caverns are disposed on two sides of each of the two primary caverns in the longitudinal direction of the mountain, respectively. Each of the electric powerhouse caverns and each of the safe powerhouse caverns are located on a same side of each the two primary caverns.

CONSTRUCTION LAYOUT FOR CAVERNS OF UNDERGROUND NUCLEAR POWER PLANT

A construction layout for caverns of an underground nuclear power plant, including: two primary caverns accommodating nuclear reactor powerhouses, electric powerhouse caverns, safe powerhouse caverns, auxiliary powerhouse caverns, nuclear fuel powerhouse caverns, connecting powerhouse caverns, a first primary traffic tunnel, a third primary traffic tunnel, a second primary traffic tunnel, a fourth primary traffic tunnel, and a primary steam channel. The electric powerhouse caverns, the safe powerhouse caverns, and the nuclear fuel powerhouse caverns are arranged along the longitudinal direction of the mountain. Each of the safe powerhouse caverns and each of the nuclear fuel powerhouse caverns are disposed on two sides of each of the two primary caverns in the longitudinal direction of the mountain, respectively. Each of the electric powerhouse caverns and each of the safe powerhouse caverns are located on a same side of each the two primary caverns.

Method and device for building underground storehouse by dissolving limestone with carbon dioxide

A method for building an underground storehouse by dissolving limestone with carbon dioxide, the method comprising the following steps: a.) drilling two wells extending from the ground surface (1) to a limestone layer (2), building a channel (5) allowing the two wells to communicate, and installing casing pipes (3, 4) respectively in the two wells; b.) introducing CO.sub.2 gas having at least 1 MPa of pressure into a CO.sub.2 absorbing solution having the same pressure to form a CO.sub.2 solution, flowing the CO.sub.2 solution into underground via the casing pipe (3) to react with the limestone to form a calcium bicarbonate solution, forming a cavern in the meanwhile, and discharging the calcium bicarbonate solution via the other casing pipe (4); c.) decompressing the discharged calcium bicarbonate solution to decompose the calcium bicarbonate contained in the solution into CO.sub.2, water and calcium carbonate, and recycling the separated CO.sub.2 absorption solution and the CO.sub.2; repeating steps b.) and c.) until a cavern meeting design requirements is formed, and discharging the solution from the cavern to form the underground storehouse (6). Also disclosed is a device for building an underground storehouse by dissolving limestone with carbon dioxide, the device comprising a CO.sub.2 storage tank (7), an absorption tower (8), a crystallizer (11), a pressure relief valve (9), a gas-liquid separator (10), a vacuum pump (13), a buffer (14) and booster pumps (12, 15, 16).

Method and device for building underground storehouse by dissolving limestone with carbon dioxide

A method for building an underground storehouse by dissolving limestone with carbon dioxide, the method comprising the following steps: a.) drilling two wells extending from the ground surface (1) to a limestone layer (2), building a channel (5) allowing the two wells to communicate, and installing casing pipes (3, 4) respectively in the two wells; b.) introducing CO.sub.2 gas having at least 1 MPa of pressure into a CO.sub.2 absorbing solution having the same pressure to form a CO.sub.2 solution, flowing the CO.sub.2 solution into underground via the casing pipe (3) to react with the limestone to form a calcium bicarbonate solution, forming a cavern in the meanwhile, and discharging the calcium bicarbonate solution via the other casing pipe (4); c.) decompressing the discharged calcium bicarbonate solution to decompose the calcium bicarbonate contained in the solution into CO.sub.2, water and calcium carbonate, and recycling the separated CO.sub.2 absorption solution and the CO.sub.2; repeating steps b.) and c.) until a cavern meeting design requirements is formed, and discharging the solution from the cavern to form the underground storehouse (6). Also disclosed is a device for building an underground storehouse by dissolving limestone with carbon dioxide, the device comprising a CO.sub.2 storage tank (7), an absorption tower (8), a crystallizer (11), a pressure relief valve (9), a gas-liquid separator (10), a vacuum pump (13), a buffer (14) and booster pumps (12, 15, 16).

Construction system for subway station

Described herein is a construction system for a subway station, wherein the construction of guide walls is accomplished using a guide wall steel formwork system, the construction of support beams is accomplished using a support beam steel formwork system, the construction of sidewalls is accomplished using a sidewall trolley, and the construction of floor slabs is accomplished using a floor slab trolley.

Construction system for subway station

Described herein is a construction system for a subway station, wherein the construction of guide walls is accomplished using a guide wall steel formwork system, the construction of support beams is accomplished using a support beam steel formwork system, the construction of sidewalls is accomplished using a sidewall trolley, and the construction of floor slabs is accomplished using a floor slab trolley.