The present invention relates to an attachment for drilling and/or foundation work, in particular a casing oscillator or casing rotator, comprising a receiving apparatus for clamping at least one pipe and a drive for generating a rotational movement of the clamped pipe, wherein the attachment comprises at least one integral control unit for an independent carrying out of control functions of the attachment.
Removing submerged piles of offshore production platforms
Certain aspects of removing submerged piles of offshore production platforms can be implemented as methods. A top deck of a fixed offshore platform installed on a mudline of a body of water is removed. An upper structure of the fixed offshore platform is removed. The upper structure is below the top deck. A lower structure is secured to the mudline by one or more structural piles remaining. The one or more structural piles, which are housed within one or more members of the lower structure, are driven below the mudline. The lower structure of the fixe offshore platform is removed. The one or more structural piles are left below the mudline.
Split flight pile systems and methods
A pile assembly to be driven into the ground comprises an elongate member, a drive member, and a plurality of flight members. The drive member is supported by the elongate member to facilitate axial rotation of the elongate member. The plurality of flight members is supported by the elongate member. Axial rotation of the elongate member causes the plurality of flight members to auger the elongate member into the ground. The flight members are arranged to balance the loads on the elongate member as the elongate member is driven into the ground.
Split flight pile systems and methods
A pile assembly to be driven into the ground comprises an elongate member, a drive member, and a plurality of flight members. The drive member is supported by the elongate member to facilitate axial rotation of the elongate member. The plurality of flight members is supported by the elongate member. Axial rotation of the elongate member causes the plurality of flight members to auger the elongate member into the ground. The flight members are arranged to balance the loads on the elongate member as the elongate member is driven into the ground.
Method and apparatus for improved installation of caissons
A caisson is modified to include side tabs thin can be gripped by side-mounted clamps on a vibratory hammer so that the caisson may be lifted into position from a horizontal position, oriented vertically, and driven into the ground without readjustment of the clamping of the vibratory hammer. An end cap installed permanently at the top of the caisson may provide an additional flange for receiving a lower clamp of the vibratory hammer to complete installation of the caisson, driving the caisson further into the earth until the tabs are buried in the ground. The flange may be sized to fit within a tower portion attached to the caisson eliminating the need for a replaceable flange system.
Method and apparatus for improved installation of caissons
A caisson is modified to include side tabs thin can be gripped by side-mounted clamps on a vibratory hammer so that the caisson may be lifted into position from a horizontal position, oriented vertically, and driven into the ground without readjustment of the clamping of the vibratory hammer. An end cap installed permanently at the top of the caisson may provide an additional flange for receiving a lower clamp of the vibratory hammer to complete installation of the caisson, driving the caisson further into the earth until the tabs are buried in the ground. The flange may be sized to fit within a tower portion attached to the caisson eliminating the need for a replaceable flange system.
Extensible shells and related methods for constructing a ductile support pier
Extensible shells and related methods for constructing a support pier are disclosed. An extensible shell can define an interior for holding granular construction material and define a first opening at a first end for receiving the granular construction material into the interior and a second opening at a second end. The extensible shell can be flexible such that the shell expands when granular construction material is compacted in the interior of the shell. A method may include positioning the extensible shell in the ground and filling at least a portion of the interior of the shell with the granular construction material. The granular construction material may be compacted in the interior of the extensible shell to form a support pier.
Extensible shells and related methods for constructing a ductile support pier
Extensible shells and related methods for constructing a support pier are disclosed. An extensible shell can define an interior for holding granular construction material and define a first opening at a first end for receiving the granular construction material into the interior and a second opening at a second end. The extensible shell can be flexible such that the shell expands when granular construction material is compacted in the interior of the shell. A method may include positioning the extensible shell in the ground and filling at least a portion of the interior of the shell with the granular construction material. The granular construction material may be compacted in the interior of the extensible shell to form a support pier.
Method of forming a mudline cellar for offshore arctic drilling
A method of forming a mudline cellar includes positioning a mudline cellar forming member on a seafloor surface. The mudline cellar forming member includes an outer surface and an inner surface that defines an inner cavity. The method further includes driving the mudline cellar forming member into the seafloor surface, and excavating the inner cavity of the mudline forming member to establish the mudline cellar.
Method of forming a mudline cellar for offshore arctic drilling
A method of forming a mudline cellar includes positioning a mudline cellar forming member on a seafloor surface. The mudline cellar forming member includes an outer surface and an inner surface that defines an inner cavity. The method further includes driving the mudline cellar forming member into the seafloor surface, and excavating the inner cavity of the mudline forming member to establish the mudline cellar.