E02D2250/003

BIONIC INDUCTION TYPE BIOLOGICAL GROUTING DEVICE FOR UNIFORMLY REINFORCING FOUNDATION SOIL

The present application discloses a bionic induction type biological grouting device for uniformly reinforcing foundation soil, comprising an operation table, a rotating shaft and a rotating disc, at least two grouting pipes are arranged in a wall of a spiral guide pipe, a plurality of grout outlet holes are formed in an inner wall of the spiral guide pipe, a plurality of sets of grout spraying holes are formed in an outer wall of the spiral guide pipe in a rotation direction of the spiral guide pipe, and a plurality of adjusting components for controlling opening and closing of each set of grout spraying holes are arranged in the spiral guide pipe, and the plurality of adjusting components are linked through a flexible shaft.

Foundation engineering method and construction apparatus for producing a columnar structure in the ground
11377811 · 2022-07-05 · ·

The invention relates to a foundation engineering method and a construction apparatus for producing a columnar structure in the ground, in which a foundation engineering tool is driven in a rotating manner about an axis of rotation and introduced with a feeding motion into a ground, wherein the columnar structure is produced in the ground. According to the invention it is provided that during the production of the columnar structure a rotating motion and a feeding motion of the foundation engineering tool are recorded over time and forwarded to an evaluation unit, in that by means of a sensor means at least one further processing parameter is recorded over time during the production of the columnar structure in the ground and is forwarded to the evaluation unit and in that by the evaluation unit a three-dimensional model of the columnar structure is produced and displayed.

Elongated connecting element for anchoring members and method for providing and installing an elongated connecting element for anchoring members
11408139 · 2022-08-09 · ·

An elongated connecting element for anchoring members, which is provided with a first anchoring end portion designed to be inserted into an anchoring region and a second end portion which defines a head, which lies opposite the first anchoring end portion and is designed to interact with an element to be anchored. The elongated connecting element includes an external tubular element which accommodates an internal elongated body, the external tubular element defining, at the head, at least one feeding port for a synthetic anchoring mix and, at the first anchoring end portion, at least one exit opening for the synthetic anchoring mix. The synthetic anchoring mix is configured to set, penetrating at least partially into the anchoring region and creating a stable connection between the anchoring region and the elongated connecting element and between the respective portions of the external tubular element and of the internal elongated body.

A METHOD FOR PREPARING AN INJECTION MATERIAL AND THE OBTAINED INJECTION MATERIAL
20220212997 · 2022-07-07 ·

Disclosed is a method for preparing a mixture and the injection material to be used as soil injection material to close the pores after a certain gelling period by applying it to the pores in the silt size, including the steps of: (a) preparation of a mixture of sodium silicate with a SiO2/Na2O ratio of 3-4 and water so that their ratio by volume varies between 3/7 and 1/1; (b) obtaining a mixture by dissolving ultra-low sulfated boric acid in water, containing between 2.5-5% by weight of ultra-low sulfated boric acid; and (c) mixing the obtained ultra low sulfate boric acid-water mixture with sodium silicate in the step a.

System and method for sealing expanded polymer-based pile shoes for jacket

The present invention belongs to the technical field of offshore wind power construction and particularly relates to a system and a method for sealing expanded polymer-based pile shoes for a jacket. The system comprises a jacket disposed on a seabed, several pile shoes arranged around a lower end of the jacket, and several steel pipe piles inserted into the seabed, wherein the steel pipe piles are inserted into the corresponding pile shoes. The system is characterized in that gaps between the pile shoes and the steel pipe piles are respectively filled with concrete and an expanded high polymer from top to bottom, an annular elastic diaphragm is further connected to the inner walls of the pile shoes, and the expanded polymer is wrapped by the elastic diaphragm, such that the expanded polymer is isolated from the steel pipe piles and the concrete.

Method for sealing post-cast strip in foundation with no gap

A method for sealing a post-cast strip in a foundation with no gap includes the following steps: mounting steel plates, horizontal pipes and vertical pipes cooperatively layer by layer in a post-cast strip, respectively, such that the upper open end of each vertical pipe protrudes from the ground through the post-cast strip; pouring grout into the post-cast strip from the top of the post-cast strip after the end of the settlement of the foundation, and carrying out high-pressure grouting into the vertical pipe using grouting equipment simultaneously; delivering the sealing grout poured into the vertical pipe to the horizontal pipes, such that the sealing grout overflows from the grout outlets of the horizontal pipes to densely fill up existing gaps; and cutting off the portion of the vertical pipe above the ground after the post-cast strip is completely sealed, and levelling the top of the cut-off vertical pipe with concrete.

INJECTABLE TIE BACK COVER FOR WATERPROOFING, APPARATUS, AND A METHOD OF USING SAME

The present invention relates generally to an injectable tie back cover for waterproofing, apparatus, and a method of using same. The invention encompasses a substantially domed shaped structure having at least one surface along the domed shaped structure, and having an edge flanged surface which is placed over a tieback head, and where the injectable tieback cover is used as a waterproofing apparatus. A supplemental injectable tubing can also be provided around the outside of the substantially domed shaped structure, which injectable tubing can be injected with a secondary waterproofing material to provide additional waterproofing to the area around the injectable tie back cover facing the concrete or shotcrete. The domed shaped structure can also have at least one dome channel to accommodate at least one injectable tieback cover tubing. The invention also provides a method of using the inventive injectable tie back cover for waterproofing structures.

Jetting, expansion and extrusion combined pile, construction method thereof and spiral jetting, expansion and extrusion drilling rig used in method

The present invention discloses a jetting, expansion and extrusion combined pile, a construction method thereof and a spiral jetting, expansion and extrusion drilling rig used in the method. A pile of the combined pile comprises a pile body (101), an expanded body (103) and a pile end (106). At least one double-frustum-shaped expanded body (103), which is integrally formed with the pile body (101), is arranged on the pile body (101). The expanded body (103) is located in a vertical soil layer position, which has higher deformation modulus and shear strength, of the pile body (101), and at least two wing plates (102) which are uniformly distributed in the circumference direction and basically perpendicular to the axis of the pile are arranged on the pile body (101). The diameter of the pile above the expanded body (103) is larger than or equal to that of the pile below the expanded body (103). The drilling rig in the present invention comprises an upper section and a lower section, the diameter of the upper section is larger than that of the lower section, and the expanded body can be produced in any required position conveniently. When the expanded body (103) is located at the upper part or in the middle of the combined pile, if the diameter of the pile above the expanded body (103) is larger than that of the pile below the expanded body (103), the consumption of concrete can be greatly reduced.

METHOD FOR STRENGTHENING AND LIFTING HIGH-RISE BUILDING HAVING RAFT FOUNDATION
20220098819 · 2022-03-31 ·

Disclosed is a method for strengthening and lifting a high-rise building that has a raft foundation, comprising: arranging a plurality of measuring points at intervals around the outer contour of a building, and determining the side to be lifted of the building according to the elevation of the measuring points; distributing a plurality of reinforcement grouting holes perpendicular to a raft foundation at intervals within the range of the raft foundation, and using pressure grouting in the reinforcement grouting holes to form a reinforcement under the raft foundation; laying downwardly inclined lifting holes on the outer side of the raft foundation at two ends close to the side to be lifted of the building; and performing simultaneous pressure grouting in the lifting holes to lift the side to be lifted of the building.

Thin-slotting lifting synchronous grouting device and its usage method

A thin-slotting lifting synchronous grouting device and its usage method are provided. The device includes a hollow force-bearing column through which a feeding pipe passes; wherein: left and right cutting plates are respectively fixedly arranged on each side of the hollow force-bearing column; a left connecting plate is fixedly arranged on an outside of the left cutting plate; a right guiding column is fixedly arranged on an outside of the right cutting plate; center lines of the left connecting plate, the right guiding column and the hollow force-bearing column are in a same plane; a top end of to the feeding pipe is connected to a grouting device, and a bottom end is connected to a spraying device; a spraying nozzle of the spraying device stretches out along the hollow force-bearing column; and a lower end of the hollow force-bearing column is connected with a disposable conical head.