E21B43/11

Shaped charge assembly, explosive units, and methods for selectively expanding wall of a tubular
11629568 · 2023-04-18 ·

A shaped charge assembly for selectively expanding a wall of a tubular includes first and second explosive units that are each symmetrical about an axis of revolution. Each explosive unit includes an explosive material that is liner-less. The first and second explosive units comprise a predetermined amount of explosive sufficient to expand, without puncturing, at least a portion of the wall of the tubular into a protrusion extending outward into an annulus adjacent the wall of the tubular.

HYDRAULIC FRACTURING PLAN AND EXECUTION OF SAME

A hydraulic fracturing plan executable by a hydraulic fracturing system to hydraulically fracture a plurality of oil and gas wells.

HYDRAULIC FRACTURING PLAN AND EXECUTION OF SAME

A hydraulic fracturing plan executable by a hydraulic fracturing system to hydraulically fracture a plurality of oil and gas wells.

Apparatuses and methods for sensing temperature along a wellbore using semiconductor elements

Apparatus for use in sensing temperature in a wellbore, comprising: tubing comprising a plurality of temperature sensor modules provided at locations along the inside of the tubing, said temperature sensor modules comprising temperature sensors provided at least in part by at least one semiconductor element having electrical properties that vary with temperature; an electrical network configured to electrically connect to the semiconductor elements to in use allow measuring of the respective electrical properties of the semiconductor elements to infer a thermal characteristic of the semiconductor element; and at least one control module electrically connected to multiple temperature sensor modules, via the electrical network, and configured to receive and process an electrical signal associated with the temperature sensor modules to enable inference of the temperature of the semiconductor elements and the environment to which the tubing is exposed at the location of that semiconductor element.

Methods for well completion

A downhole tool assembly for completing or cleaning a wellbore. The downhole tool assembly may include a perforation gun sub and a laser assembly sub. The perforation gun sub may be used to propagate a shockwave through one or more pre-existing perforations in a formation. The laser assembly sub may be used for treating perforations, e.g. treating the one or more pre-existing perforations. Depending on the parameters of the operation, the treating of the perforations may comprise changing the shape of the perforations and/or making the perforations wider, deeper, or otherwise adjusted.

Methods for well completion

A downhole tool assembly for completing or cleaning a wellbore. The downhole tool assembly may include a perforation gun sub and a laser assembly sub. The perforation gun sub may be used to propagate a shockwave through one or more pre-existing perforations in a formation. The laser assembly sub may be used for treating perforations, e.g. treating the one or more pre-existing perforations. Depending on the parameters of the operation, the treating of the perforations may comprise changing the shape of the perforations and/or making the perforations wider, deeper, or otherwise adjusted.

Anisotropic NMO correction and its application to attenuate noises in VSP data
11467305 · 2022-10-11 · ·

A method for performing a formation-related operation based on corrected vertical seismic profile (VSP) data of an earth formation includes performing a VSP survey and applying a normal moveout (NMO) correction equation to the survey data that is a function of source offset to wellhead. The method also includes solving the NMO correction equation using a simulated annealing algorithm having an object function that is a coherence coefficient of semblance analysis of an NMO corrected reflection event within a time window to provide NMO corrected data. The method further includes performing the formation-related operation at at least one of a location, a depth and a depth interval based on the VSP NMO corrected data.

Anisotropic NMO correction and its application to attenuate noises in VSP data
11467305 · 2022-10-11 · ·

A method for performing a formation-related operation based on corrected vertical seismic profile (VSP) data of an earth formation includes performing a VSP survey and applying a normal moveout (NMO) correction equation to the survey data that is a function of source offset to wellhead. The method also includes solving the NMO correction equation using a simulated annealing algorithm having an object function that is a coherence coefficient of semblance analysis of an NMO corrected reflection event within a time window to provide NMO corrected data. The method further includes performing the formation-related operation at at least one of a location, a depth and a depth interval based on the VSP NMO corrected data.

Wellbore flow monitoring using a partially dissolvable plug

A partially dissolvable plug is to be deployed in a position in a wellbore formed in a subsurface formation. The partially dissolvable plug comprises a first portion comprising a dissolvable material that is to dissolve over time after exposure to a downhole ambient environment in the wellbore and a second portion comprising a non-dissolvable material that is to create a flow restriction as the flow of fluid passes through the partially dissolvable plug. The first portion is to prevent a flow of fluid from downhole to a surface of the wellbore until at least a portion of the dissolvable material is dissolved. A flow rate is to be determined based on a detected change in a downhole attribute that is to change in response to the flow of fluid passing through the partially dissolvable plug after at least a portion of the partially dissolvable plug is dissolved.

A METHOD FOR THE EXTRACTION OF HYDROCARBON

A method to facilitate the extraction of hydrocarbon from a coal seam gas formation is described that includes. : (a) drilling a wellbore using a drill string to access the coal seam gas formation; (b) perforating a section of the drill string; (c) abandoning a section of the drill string in the wellbore; (d) setting a temporary plug to isolate the abandoned section of the drill string and the wellbore; (e) installing a production tubing string above the temporary plug to create a fluid passageway ; (f) displacing a fluid above the temporary plug ; (g) removing the temporary plug to create an initial stimulated reservoir volume and, resultantly, at least partially filling an annulus formed between the abandoned section of the drill string and the wellbore wall with coal fragments; and (h) extracting hydrocarbon from the coal seam gas formation via the fluid passageway to create an expanding stimulated reservoir volume.