E21C41/26

METHOD AND SYSTEM FOR ASSIGNING TASKS TO DRILL RIGS

A method for assigning a set of tasks to a plurality of drill rigs, said tasks including drilling of holes by said plurality of drill rigs. The method includes defining a first set of constraints to be fulfilled when assigning tasks to said plurality of drill rigs finding an overall solution fulfilling said first set of constraints by solving each constraint as a sub-problem, a solution to at least one sub-problem being dependent on the solution of at least one other sub-problem; said overall solution fulfilling said first set of constraints being determined when a solution to a first of said sub-problems is validated by solutions of others of said sub-problems, and assigning tasks to said plurality of drill rigs according to the determined validated overall solution, wherein tasks of said set of tasks are arranged to be carried out at least partially overlapping in time by said plurality of drill rigs.

METHODS & SYSTEMS FOR MONITORING WORK ZONE IN WORKSITE
20180334783 · 2018-11-22 · ·

A method for monitoring a work zone in a worksite is disclosed. The work zone includes an overburden region, a dump region having an incline of positive slope, and an initial pivot point at a junction of the overburden region and the incline. The method includes monitoring, by a controller, an elevation of the work zone based on an elevation data received from one or more sensors. Further, the method comprises detecting, by the controller, a location in the work zone having an elevation lower than an elevation of the initial pivot point based on the elevation data. Furthermore, the method comprises updating, by the controller, the detected location as a new pivot point if the detected location is within a predetermined distance from the initial pivot point.

METHOD AND SYSTEM FOR MINING

A method for mining narrow vein deposit of ore, the narrow vein deposit having a hanging wall and a foot wall, the method comprising: drilling a pilot hole into the narrow vein deposit along a path substantially centrally between the hanging wall and the foot wall to a depth within the vein; following the pilot hole with a larger diameter drilling assembly to fragment the ore into drill cuttings; circulating the drill cuttings to a wellhead; and collecting the drill cuttings for processing to recover the ore therefrom.

METHOD AND SYSTEM FOR MINING

A method for mining narrow vein deposit of ore, the narrow vein deposit having a hanging wall and a foot wall, the method comprising: drilling a pilot hole into the narrow vein deposit along a path substantially centrally between the hanging wall and the foot wall to a depth within the vein; following the pilot hole with a larger diameter drilling assembly to fragment the ore into drill cuttings; circulating the drill cuttings to a wellhead; and collecting the drill cuttings for processing to recover the ore therefrom.

System for the reduction in applied energy, improved efficiencies and reduced costs in open pit mining

The present invention relates to an open pit mining system. The system includes a material lifting machine configured to both: (1) excavate and remove overburden from an open pit of a mine; and (2) excavate and remove valuable material from the open pit. Advantageously, the machine removes the overburden waste material as well as the mined valuable material which would otherwise be conventionally removed by trucks in the pit, out of the pit up the ramps and then onto the processing plant. Accordingly, the use of trucks for transporting valuable material both along and up out of the pit is at least to some extent reduced thereby resulting in improved cost and energy efficiency.

System for the reduction in applied energy, improved efficiencies and reduced costs in open pit mining

The present invention relates to an open pit mining system. The system includes a material lifting machine configured to both: (1) excavate and remove overburden from an open pit of a mine; and (2) excavate and remove valuable material from the open pit. Advantageously, the machine removes the overburden waste material as well as the mined valuable material which would otherwise be conventionally removed by trucks in the pit, out of the pit up the ramps and then onto the processing plant. Accordingly, the use of trucks for transporting valuable material both along and up out of the pit is at least to some extent reduced thereby resulting in improved cost and energy efficiency.

METHOD AND SYSTEM FOR ASSIGNING TASKS TO MINING AND/OR CONSTRUCTION MACHINES

A method for assigning a set of tasks to a plurality of mining machines, said machines being arranged to be driven between positions for performing tasks is provided. The method includes defining a first set of constraints to be fulfilled finding an overall solution fulfilling the first set of constraints by solving each constraint as a sub-problem, a solution to at least one sub-problem being dependent on the solution of at least one other sub-problem; the overall solution fulfilling the first set of constraints being an overall solution where a first of said sub-problems is validated by solutions of others of the sub-problems, and assigning tasks to the machines according to the determined validated overall solution, wherein tasks are arranged to be carried out at least partially overlapping in time by the mining machines.

METHOD AND SYSTEM FOR ASSIGNING TASKS TO MINING AND/OR CONSTRUCTION MACHINES

A method for assigning a set of tasks to a plurality of mining machines, said machines being arranged to be driven between positions for performing tasks is provided. The method includes defining a first set of constraints to be fulfilled finding an overall solution fulfilling the first set of constraints by solving each constraint as a sub-problem, a solution to at least one sub-problem being dependent on the solution of at least one other sub-problem; the overall solution fulfilling the first set of constraints being an overall solution where a first of said sub-problems is validated by solutions of others of the sub-problems, and assigning tasks to the machines according to the determined validated overall solution, wherein tasks are arranged to be carried out at least partially overlapping in time by the mining machines.

Milling machine, in particular surface miner, and method for mining milled material of an open cast surface
10077655 · 2018-09-18 · ·

In a method for milling an opencast mining surface or for milling off layers of an asphalt or concrete traffic surface with a milling machine removing the ground surface, by milling the ground surface along a predetermined milling track and by transporting the milled material via a conveying device to at least one container of a truck that travels along next to the milling machine, a relative position between the container and the conveying device is automatically controlled to regulate the loading of the container.

Milling machine, in particular surface miner, and method for mining milled material of an open cast surface
10077655 · 2018-09-18 · ·

In a method for milling an opencast mining surface or for milling off layers of an asphalt or concrete traffic surface with a milling machine removing the ground surface, by milling the ground surface along a predetermined milling track and by transporting the milled material via a conveying device to at least one container of a truck that travels along next to the milling machine, a relative position between the container and the conveying device is automatically controlled to regulate the loading of the container.