E21F15/02
Method for recovering room-mining coal pillars by solid filling in synergy with artificial pillars
A method for recovering room-mining coal pillars by solid filling in synergy with artificial pillars. Solid materials and cementing materials on the ground are conveyed through a feeding well and a pipeline to a room-and-pillar goaf, a plurality of artificial pillars is cast at an interval in a coal room area, and gangue is cast to fill other regions of the coal room using a gangue casting machine. Under joint support by the artificial pillars and the coal room filler, coal pillars are recovered using a continuous coal mining machine, artificial pillars are cast in the original coal pillar area after recovery, and gangue is cast to fill the original coal pillar area using the gangue casting machine. A system for recovering room-mining coal pillars by solid filling in synergy with artificial pillars mainly includes a material conveying system, a joint support system, and a coal pillar recovery system.
Method for recovering room-mining coal pillars by solid filling in synergy with artificial pillars
A method for recovering room-mining coal pillars by solid filling in synergy with artificial pillars. Solid materials and cementing materials on the ground are conveyed through a feeding well and a pipeline to a room-and-pillar goaf, a plurality of artificial pillars is cast at an interval in a coal room area, and gangue is cast to fill other regions of the coal room using a gangue casting machine. Under joint support by the artificial pillars and the coal room filler, coal pillars are recovered using a continuous coal mining machine, artificial pillars are cast in the original coal pillar area after recovery, and gangue is cast to fill the original coal pillar area using the gangue casting machine. A system for recovering room-mining coal pillars by solid filling in synergy with artificial pillars mainly includes a material conveying system, a joint support system, and a coal pillar recovery system.
METHOD OF FORMING A ROADWAY BY FILLING GANGUE PASTE DURING WIDE-ROADWAY EXCAVATION OF THICK COAL SEAM
Provided is a method of forming a roadway by filling gangue paste during wide roadway excavation of a thick coal seam belonging to the technical field of mining industry. The method comprises: firstly designing a width of a filing strip and a width of a new excavation roadway according to a geological condition of a coal seam; secondly, determining a length of each filling, i.e. a cyclic filling interval, according to an existing excavation technical condition of a mining shaft; when the new excavation roadway is excavated, performing supporting for a roof, a floor and an inner side of a roadway by using a strong bolt and bolt-mesh-cable; then, after the new excavation roadway is excavated for the cyclic filling interval, starting to perform roadway-expanding excavation along an outer side of the roadway; when roadway-expanding excavation is performed, performing temporary supporting for a filling strip and a junction of the filling strip and the new excavation roadway by using a single hydraulic prop in cooperation with a metal articulated roof beam; finally, after roadway-expanding excavation is completed, removing temporary supports and filling the filling strip; afterwards, the above steps are performed alternately. In this way, coal losses caused by reserving coal pillars can be effectively reduced, the impact of the underground pressure during roadway excavation is relieved and the costs of gangue treatment and roadway excavation are lowered.
METHOD OF FORMING A ROADWAY BY FILLING GANGUE PASTE DURING WIDE-ROADWAY EXCAVATION OF THICK COAL SEAM
Provided is a method of forming a roadway by filling gangue paste during wide roadway excavation of a thick coal seam belonging to the technical field of mining industry. The method comprises: firstly designing a width of a filing strip and a width of a new excavation roadway according to a geological condition of a coal seam; secondly, determining a length of each filling, i.e. a cyclic filling interval, according to an existing excavation technical condition of a mining shaft; when the new excavation roadway is excavated, performing supporting for a roof, a floor and an inner side of a roadway by using a strong bolt and bolt-mesh-cable; then, after the new excavation roadway is excavated for the cyclic filling interval, starting to perform roadway-expanding excavation along an outer side of the roadway; when roadway-expanding excavation is performed, performing temporary supporting for a filling strip and a junction of the filling strip and the new excavation roadway by using a single hydraulic prop in cooperation with a metal articulated roof beam; finally, after roadway-expanding excavation is completed, removing temporary supports and filling the filling strip; afterwards, the above steps are performed alternately. In this way, coal losses caused by reserving coal pillars can be effectively reduced, the impact of the underground pressure during roadway excavation is relieved and the costs of gangue treatment and roadway excavation are lowered.
METHOD FOR RECOVERING ROOM-MINING COAL PILLARS BY SOLID FILLING IN SYNERGY WITH ARTIFICIAL PILLARS
A method for recovering room-mining coal pillars by solid filling in synergy with artificial pillars. Solid materials and cementing materials on the ground are conveyed through a feeding well and a pipeline to a room-and-pillar goaf, a plurality of artificial pillars is cast at an interval in a coal room area, and gangue is cast to fill other regions of the coal room using a gangue casting machine. Under joint support by the artificial pillars and the coal room filler, coal pillars are recovered using a continuous coal mining machine, artificial pillars are cast in the original coal pillar area after recovery, and gangue is cast to fill the original coal pillar area using the gangue casting machine. A system for recovering room-mining coal pillars by solid filling in synergy with artificial pillars mainly includes a material conveying system, a joint support system, and a coal pillar recovery system. By constructing pillar grooves, casting artificial pillars, casting gangue to fill a goaf, and recovering coal pillars, the recovery rate of coal resources can be increased, and room-mining coal pillar recovery theories and technologies in China can be enriched while harmonious development of environmental protection and resource exploitation is promoted.
SYSTEM AND METHOD FOR FORMING A CAVITY IN A BACKFILLED STOPE
A system for forming a cavity in a backfill mixture comprising granular material and water positioned in an at least partially excavated stope. The system includes a base and a drainage tube assembly in an extended condition thereof. The drainage tube assembly extends between a lower end secured to the base and an upper end positioned above an upper surface of the backfill mixture. The extended drainage tube assembly includes a tube portion thereof with a permeable material and defining the cavity therein into which the water from the backfill mixture is drainable, through the permeable material. The system also includes a drainage pipe, for permitting the water that has drained into the cavity of the extended drainage tube assembly to exit the stope.
METHOD AND APPARATUS FOR CREATING A VOID FOR UNDERGROUND MINING
A method and an apparatus for creating a void, low-density fill or combination of void and low-density fill for underground mining having at least one module of formwork to be positioned in an open slope of an underground mine prior to carrying out a backfilling operation.
Method for removing hydraulic support for solid filling coal mining
A method for removing a hydraulic support for solid filling coal mining includes digging a support removing channel (3) in a coal body (2) in front of the hydraulic support (1), and laying a support removing track (4), then removing the hydraulic support from a coal conveying gateway (11) to a track gateway (5), temporary supporting is carried out by matching a single supporting column with a n-type steel beam before each hydraulic support is removed. A supporting roof is reinforced in time by means of erecting a crib (13) and grouting after each hydraulic support is removed, three grouting pipelines (12) are laid after the supports of the whole work surface are removed, and grouting is carried out in the whole finishing cut space. The roof of the support removing space of the work surface is stable so that the hydraulic supports on the work surface of solid filling coal mining are ensured to be safely and efficiently removed.
Method for removing hydraulic support for solid filling coal mining
A method for removing a hydraulic support for solid filling coal mining includes digging a support removing channel (3) in a coal body (2) in front of the hydraulic support (1), and laying a support removing track (4), then removing the hydraulic support from a coal conveying gateway (11) to a track gateway (5), temporary supporting is carried out by matching a single supporting column with a n-type steel beam before each hydraulic support is removed. A supporting roof is reinforced in time by means of erecting a crib (13) and grouting after each hydraulic support is removed, three grouting pipelines (12) are laid after the supports of the whole work surface are removed, and grouting is carried out in the whole finishing cut space. The roof of the support removing space of the work surface is stable so that the hydraulic supports on the work surface of solid filling coal mining are ensured to be safely and efficiently removed.
Fill fence system and method for installing same
A method of installing a fill fence system at a predetermined location to at least partially cover an opening defined by a back, a floor, and side walls. The method includes providing a carrier system including a carrier assembly, locating the carrier assembly in a safe zone adjacent to the unsafe zone, and positioning an assembled fill fence assembly on the carrier assembly. The carrier assembly and the full fence assembly are moved to a preselected location. With the carrier assembly at the preselected location, the fill fence assembly is positioned at the predetermined location, and installed at least partially to cover the opening. The carrier assembly is disengaged from the fill fence assembly and removed from the preselected location. The fill fence system includes a securing element is applied to help secure the fill fence assembly in the opening.