E21F15/06

Plug for a void, system and method

A plug for a void in a mine to divert water having a rigid closed cell foam which fills the void. The rigid closed cell foam having a plurality of pipes disposed within the foam. The pipes distributed throughout the void. The pipes are positioned in the foam so the pipes are staggered in length vertically with respect to various heights in the void, and the pipes are positioned in the foam every 4 to 6 horizontally with respect to the void. A method for diverting water from a void in a mine.

Plug for a void, system and method

A plug for a void in a mine to divert water having a rigid closed cell foam which fills the void. The rigid closed cell foam having a plurality of pipes disposed within the foam. The pipes distributed throughout the void. The pipes are positioned in the foam so the pipes are staggered in length vertically with respect to various heights in the void, and the pipes are positioned in the foam every 4 to 6 horizontally with respect to the void. A method for diverting water from a void in a mine.

ISOLATED OVERBURDEN GROUTING FILLING METHOD FOR COAL GANGUE UNDERGROUND EMISSION REDUCTION

An isolated overburden grouting filling method for coal gangue underground emission reduction includes determining a grouting filling key stratum according to information of a coal face; constructing a directional borehole from an underground tunnel to the inside of the grouting filling key stratum; constructing a plurality of branch holes downward in a main hole of the directional borehole; and by establishing a grouting filling system under a mine, gangue obtained from excavation gangue of the mine and gangue sorting being made into a filling slurry by means of breaking and grinding, and the filling slurry filling fractures below the key stratum through the directional borehole. The gangue generated from a mine is directly made into a filling slurry under the mine and then fills overburden mining-induced fractures, thereby achieving harmless disposal of the gangue, effectively supporting a key stratum, and controlling stratum movement and surface subsidence.

ISOLATED OVERBURDEN GROUTING FILLING METHOD FOR COAL GANGUE UNDERGROUND EMISSION REDUCTION

An isolated overburden grouting filling method for coal gangue underground emission reduction includes determining a grouting filling key stratum according to information of a coal face; constructing a directional borehole from an underground tunnel to the inside of the grouting filling key stratum; constructing a plurality of branch holes downward in a main hole of the directional borehole; and by establishing a grouting filling system under a mine, gangue obtained from excavation gangue of the mine and gangue sorting being made into a filling slurry by means of breaking and grinding, and the filling slurry filling fractures below the key stratum through the directional borehole. The gangue generated from a mine is directly made into a filling slurry under the mine and then fills overburden mining-induced fractures, thereby achieving harmless disposal of the gangue, effectively supporting a key stratum, and controlling stratum movement and surface subsidence.

Plug for a Void, System and Method
20240093607 · 2024-03-21 · ·

A plug for a void in a mine to divert water having a rigid closed cell foam which fills the void. The rigid closed cell foam having a plurality of pipes disposed within the foam. The pipes distributed throughout the void. The pipes are positioned in the foam so the pipes are staggered in length vertically with respect to various heights in the void, and the pipes are positioned in the foam every 4 to 6 horizontally with respect to the void. Each pipe has a mixing stick. A method for diverting water from a void in a mine.

Plug for a Void, System and Method
20240093607 · 2024-03-21 · ·

A plug for a void in a mine to divert water having a rigid closed cell foam which fills the void. The rigid closed cell foam having a plurality of pipes disposed within the foam. The pipes distributed throughout the void. The pipes are positioned in the foam so the pipes are staggered in length vertically with respect to various heights in the void, and the pipes are positioned in the foam every 4 to 6 horizontally with respect to the void. Each pipe has a mixing stick. A method for diverting water from a void in a mine.

Method for filling deformable karst cave

The present invention relates to method for filling deformable karst cave, and the steps are: penetrating a grouting pipe into an elastic silicone tube, penetrating the grouting pipe and the elastic silicone tube into a deformable bracket, and lowering into a karst cave; sealing the elastic silicone tube, injecting silicate resin materials into the grouting pipe, and injecting steel fiber reinforced grout to implement a block stone-like structure; sealing the elastic silicone tube, separating the block stone-like structure from the elastic silicone tube to complete a block stone-like structure; lowering the elastic silicone tube and the deformable bracket, sealing the elastic silicone tube, lowering the elastic silicone tube and the deformable bracket tore construct the block stone-like structure, and completing the filling. The present invention may effectively stabilize the karst cave, ensure safe tunnel construction and stable surrounding rocks, and improve engineering construction speed.

Method for filling deformable karst cave

The present invention relates to method for filling deformable karst cave, and the steps are: penetrating a grouting pipe into an elastic silicone tube, penetrating the grouting pipe and the elastic silicone tube into a deformable bracket, and lowering into a karst cave; sealing the elastic silicone tube, injecting silicate resin materials into the grouting pipe, and injecting steel fiber reinforced grout to implement a block stone-like structure; sealing the elastic silicone tube, separating the block stone-like structure from the elastic silicone tube to complete a block stone-like structure; lowering the elastic silicone tube and the deformable bracket, sealing the elastic silicone tube, lowering the elastic silicone tube and the deformable bracket tore construct the block stone-like structure, and completing the filling. The present invention may effectively stabilize the karst cave, ensure safe tunnel construction and stable surrounding rocks, and improve engineering construction speed.

Plug for a Void, System and Method
20190368352 · 2019-12-05 · ·

A plug for a void in a mine to divert water having a rigid closed cell foam which fills the void. The rigid closed cell foam having a plurality of tremie pipes disposed within the foam. The tremie pipes distributed throughout the void. The tremie pipes are positioned in the foam so the pipes are staggered in length vertically with respect to various heights in the void, and the tremie pipes are positioned in the foam every 4 to 6 horizontally with respect to the void. Each tremie pipe has a mixing stick. A method for diverting water from a void in a mine.

Plug for a Void, System and Method
20190368352 · 2019-12-05 · ·

A plug for a void in a mine to divert water having a rigid closed cell foam which fills the void. The rigid closed cell foam having a plurality of tremie pipes disposed within the foam. The tremie pipes distributed throughout the void. The tremie pipes are positioned in the foam so the pipes are staggered in length vertically with respect to various heights in the void, and the tremie pipes are positioned in the foam every 4 to 6 horizontally with respect to the void. Each tremie pipe has a mixing stick. A method for diverting water from a void in a mine.