Patent classifications
E21F17/18
PROTECTING TROLLEY AND CONSTRUCTION METHOD OF ROCK BURST PREWARNING PROTECTION SYSTEM IN NON-CONTACT TUNNEL CONSTRUCTION
Provided are a protecting trolley and a construction method of rock burst prewarning protection system in non-contact tunnel construction. The protecting trolley includes a framework, a walking assembly, a rockfall buffering assembly, a spraying assembly and a rock burst prewarning system. The rockfall buffering assembly includes an arch frame in a fixed connection with the framework and a protecting net fixed on the arch frame. The spraying assembly includes a track car in connection with the rockfall buffering assembly and a spraying hose fixed on the track car, and the spraying hose sprays towards the surrounding rock. The rock burst prewarning assembly includes a thermosensitive infrared sensor used for detecting the temperature of the surrounding rock and a highly sensitive laser sensor used for detecting the deformation of the surrounding rock.
ROOF SUPPORT INCLUDING EXTENDABLE LINKS
A system for controlling a roof support, including a canopy for engaging a mine surface, includes a sensor configured to generate a signal indicative of a position of an end of the canopy, and a controller. The controller is configured to receive the signal and determine whether a portion of a mining machine will contact a portion of the canopy based on the signal.
ROOF SUPPORT INCLUDING EXTENDABLE LINKS
A system for controlling a roof support, including a canopy for engaging a mine surface, includes a sensor configured to generate a signal indicative of a position of an end of the canopy, and a controller. The controller is configured to receive the signal and determine whether a portion of a mining machine will contact a portion of the canopy based on the signal.
TUNNEL DEFECT DETECTION AND MANAGEMENT SYSTEM BASED ON VIBRATION SIGNAL OF MOVING TRAIN
A tunnel defect detection and management system based on a vibration signal of a moving train. This system identifies the defects in a subway tunnel structure and soil behind a wall through the acquisition, transmission and analysis of an on-board acceleration signal. A signal acquisition sensor is mounted on the moving train. A signal acquisition module and a signal transmission system are mounted in the train to preprocess and compress the signal. A data processing and analysis server performs data analysis to quickly identify the defects of the tunnel and the auxiliary structure thereof, and determine a defect location and type. A tunnel management platform releases real-time detection information and health status of the tunnel, alarms for the defects, and releases the defect data to relevant personnel to take measures.
Projected zone overlap
A system and method for zone projection are presented. Specifically, anticipated paths of travel are determined for a number of different vehicles operating within an environment. Based upon those anticipated paths of travel, as well as likely stopping distances of each vehicle, the system generate zones around each vehicle. These projected zones define a geographical region into which each vehicle is likely to proceed as it maneuvers about the environment. With the zones determined, the system is configured to detect zones that overlap, and, when such overlapping zones are detected, can generate an alarm warning of a potential collision condition that may exist between the two corresponding vehicles.
Loaded-to-frame detection equipment and method for backfill grouting of shield tunnel
The present invention relates to a loaded-to-frame detection equipment for backfill grouting of a shield tunnel, including an automatic loaded-to-frame transmission apparatus, a ground penetrating radar, and an intelligent backfill grouting processing and analysis software. The equipment is integrated by using software and hardware, and can implement real-time visual detection of a backfill grouting layer in a shield construction process. The loaded-to-frame automatic transmission apparatus mainly includes a track, a synchronous belt, a transmission mechanism, a servo machine, and a drive and reducer; and a new air-coupled radar detection apparatus is carried on the loaded-to-frame automatic transmission apparatus and is installed on a shield frame. With the shield performs tunneling, circular detection on a grouting body of the shield and visual layered display of the grouting body are implemented.
Loaded-to-frame detection equipment and method for backfill grouting of shield tunnel
The present invention relates to a loaded-to-frame detection equipment for backfill grouting of a shield tunnel, including an automatic loaded-to-frame transmission apparatus, a ground penetrating radar, and an intelligent backfill grouting processing and analysis software. The equipment is integrated by using software and hardware, and can implement real-time visual detection of a backfill grouting layer in a shield construction process. The loaded-to-frame automatic transmission apparatus mainly includes a track, a synchronous belt, a transmission mechanism, a servo machine, and a drive and reducer; and a new air-coupled radar detection apparatus is carried on the loaded-to-frame automatic transmission apparatus and is installed on a shield frame. With the shield performs tunneling, circular detection on a grouting body of the shield and visual layered display of the grouting body are implemented.
Blast reconciliation for mines
According to an example, with respect to blast reconciliation for mines, pre blast measurement data and post blast measurement data associated with a blasting operation for a mining site may be ascertained from a pre and post blast measurer. A blast reconciliation model may be generated using existing pre blast measurement data and existing post blast measurement data, and used to analyze the ascertained pre blast measurement data and the ascertained post blast measurement data. Based on the analysis of the ascertained pre blast measurement data and the ascertained post blast measurement data, a blast material yield for the mining site may be determined as a result of the blasting operation. An alert indicative of the blast material yield may be generated.
Monitoring device for deformation of locked patch crack of rock slope and arrangement method
An arrangement method for deformation of a locked patch crack of a rock slope, includes: connecting a filling pipeline on a bladder-type monitoring probe to a mortar guiding pipe through an automatic locking and unlocking device, clamping a portion to be clamped on a bladder by a clamping assembly, driving a clamping driving mechanism to move towards an adit by a push driving mechanism, and pushing the bladder into the adit; injecting cement mortar into the bladder through the mortar guiding pipe by utilizing a high-pressure injection machine to expand the bladder until an upper surface and a lower surface of the bladder abut against an upper surface and a lower surface of the adit, and making a monitor on the bladder abut against the upper and lower surfaces of the adit; and arranging a plurality of bladder-type monitoring probes in an array in the adit.
Wellbore inspection system and method for ultra-deep vertical shaft
Disclosed are a wellbore inspection system and method for an ultra-deep vertical shaft. The wellbore inspection system includes a wire rope moving system, inspection robots, a visual image acquisition system, a wireless communication module, a central control system, and an image post-processing system of an upper computer. The wire rope moving system includes a surface wire rope guide rail, an underground wire rope guide rail, a surface wire rope moving device, an underground wire rope moving device, and a wire rope. The visual image acquisition system includes explosion-proof cameras. After image information acquired by the explosion-proof cameras is processed by a lower computer, the processed image is transmitted by a wireless image transmission module to the image post-processing system of the upper computer. The central control system is connected to the inspection robots and the wire rope moving system, and the inspection robots are connected to the central control system.