E02B2017/006
FOUNDATION WITH PEDESTAL AND RIBS FOR TOWERS
A wind turbine foundation comprising a concrete support slab having a horizontal rebar grid therein, a concrete pedestal integral with the support slab and having vertical post tensioning elements therein and a plurality of concrete ribs on top of and integral with the support slab and integral with the pedestal, the ribs having rebar therein and extend outwardly from the pedestal, the pedestal, slab and ribs are connected to each other to form a monolithic foundation. The foundation design reduces the weight and volume of materials used, reduces cost, and improves heat dissipation conditions during construction by having a small ratio of concrete mass to surface area thus eliminating the risk of thermal cracking due to heat of hydration.
METHOD OF SECURING AND TRANSFERRING A LOAD BETWEEN A VESSEL AND AN OFFSHORE INSTALLATION AND AN APPARATUS THEREFOR
The offshore jack-up has a hull and a plurality of moveable legs engageable with the seafloor. The offshore jack-up is arranged to move the legs with respect to the hull to position the hull out of the water. The method comprises moving at least a portion of a vessel underneath the hull of the offshore jack-up or within a cut-out of the hull when the hull is positioned out of the water and the legs engage the seafloor. A stabilizing mechanism mounted on the jack-up is engaged against the vessel. The stabilizing mechanism is pushed down on the vessel to increase the buoyant force acting on the vessel.
METHOD OF SECURING AND TRANSFERRING A LOAD BETWEEN A VESSEL AND AN OFFSHORE INSTALLATION AND AN APPARATUS THEREFOR
The offshore jack-up has a hull and a plurality of moveable legs engageable with the seafloor. The offshore jack-up is arranged to move the legs with respect to the hull to position the hull out of the water. The method comprises securing the vessel with respect to the hull of the offshore jack-up when the hull is positioned out of the water and the legs engage the seafloor. A lifting mechanism mounted on the offshore jack-up engages with a cargo carrying platform positioned on the vessel. The platform is lifted with the lifting mechanism between a first position on the vessel and a second position clear of the vessel.
METHOD OF SECURING AND TRANSFERRING A LOAD BETWEEN A VESSEL AND AN OFFSHORE INSTALLATION AND AN APPARATUS THEREFOR
The offshore jack-up has a hull and a plurality of moveable legs engageable with the seafloor. The offshore jack-up is arranged to move the legs with respect to the hull to position the hull out of the water. The method comprises securing the vessel with respect to the hull of the offshore jack-up when the hull is positioned out of the water and the legs engage the seafloor. A lifting mechanism mounted on the offshore jack-up engages with a cargo carrying platform positioned on the vessel. The platform is lifted with the lifting mechanism between a first position on the vessel and a second position clear of the vessel.
FOUNDATION WITH PEDESTAL AND RIBS FOR TOWERS
A wind turbine foundation comprising a concrete support slab having a horizontal rebar grid therein, a concrete pedestal integral with the support slab and having vertical post tensioning elements therein and a plurality of concrete ribs on top of and integral with the support slab and integral with the pedestal, the ribs having rebar therein and extend outwardly from the pedestal, the pedestal, slab and ribs are connected to each other to form a monolithic foundation. The foundation design reduces the weight and volume of materials used, reduces cost, and improves heat dissipation conditions during construction by having a small ratio of concrete mass to surface area thus eliminating the risk of thermal cracking due to heat of hydration.
A SELF-PROPELLED OFFSHORE INSTALLATION VESSEL
A self-propelled offshore installation vessel (1) operates at an offshore position and has at least one water pump (27) being operable to pump water from a water inlet opening (22) to a water outlet opening (25) via water conduit pipes (24). The water system can eject water out through the water outlet opening(s), whereby the ejected water interacts with the waves to dampen waves in an affected area (35) of the sea at the self-propelled offshore installation vessel (1).
Drilling installation; handling system, method for independent operations
Drilling installation comprising a cantilever with a drilling floor for performing drilling operations; further comprising an independent operations handling system arranged for handling equipment underneath the drilling floor independent of the drilling operations on the drilling floor, wherein the independent operations handling system comprises a handling element for cooperation with the equipment to be handled, wherein the handling element is extendible underneath the cantilever.
Structural support system and methods of use
The present disclosure describes a base structural building module employing a core structural member having an array of upwardly and outwardly and downwardly and outwardly extending braces or arms extending therefrom. Tubular cans are mounted at the ends of each of the upper and lower arms to receive piles. One upper arm is aligned and paired with one lower arm and the pair's respective cans are aligned about their can axis. The modules employ flexible design by varying the lengths of the arms and their respective inclination or declination angles. Modules can be stacked one on top of another (and secured) to form multi-tiered structural building jackets for building vertical structures such as, for example, oil and gas platforms used onshore or offshore as well as other structures. Each tier can also comprise multiple modules joined laterally together to provide a wide variety of potential template configurations and building applications.
Continuous monitoring system of leg position and loading for a drilling rig
The present invention generally relates to a continuous monitoring system and method for monitoring the loads in a support leg of an offshore drilling rig through a remote unit mounted to the climbing pinion shaft of a jacking drive system when the brake is engaged.
Offshore crane
The invention relates to a crane, such as a hoisting crane (3000) having a hoisting boom (3010) having a lifting region (3020), configured to lift a load (3050) and an actuatable restraint device (3040), the device extending from the crane. The actuatable restraint device is configured to engage with a load being lifted, so as to control movement of that load with respect to the lifting region in at least one direction. The actuatable restraint device may be configured to control movement in as much as inhibiting, or mitigating, certain movement.