E02B2017/0065

CANTILEVERED RESILIENT STRUT CONNECTOR
20210262187 · 2021-08-26 ·

The present invention relates to a joint arrangement for joining first and second longitudinally aligned members, said joint arrangement comprising at least one strut arranged to project from at least one of said first and second longitudinally aligned members, said at least one strut comprising a proximal end attached to the member from which it projects and a remote (distal) end arranged to be displaced away from said member, said distal end arranged to abut a complementary stop in/on the other member when said second member penetrates said first member, wherein said at least one strut is a compression strut which acts to resist withdrawal of the second member via compression in the strut.

WIND TURBINE INSTALLATION METHOD

The present invention relates to a method for installing an offshore wind turbine at a target location at sea with an installation vessel, the vessel comprising:—a nacelle support structure for temporarily supporting a nacelle comprising a hub having a plurality of root end connectors to which the root ends of the blades are to be connected, the nacelle support structure comprising:—a support tower extending upwardly from a deck of the installation vessel,—a support platform configured to temporarily support the nacelle,—one or more lifting devices configured for:—lifting the nacelle onto the support platform,—lifting a nacelle assembly including the blades onto a wind turbine mast located adjacent the vessel, wherein the method comprises: a) lifting the nacelle onto the support platform, and securing the nacelle to the support platform, b) orienting a root end connector of the hub of the nacelle in a direction facing a guide path of the blade moving system, c) connecting the root end of the first blade to the corresponding first root end connector of the hub, d) repeating steps b) and c) for subsequent blades and root end connectors until all blades are connected to the hub of the nacelle, thereby providing a RNA, e) lifting the RNA from the nacelle support structure and positioning the RNA onto a wind turbine mast located adjacent the vessel.

Offshore installation
11066800 · 2021-07-20 · ·

The invention relates to an offshore installation, comprising an underwater foundation structure, a construction placed onto the foundation structure, a docking device for a boat, and a device for cathodic corrosion protection for the underwater foundation structure, said device having at least two anodes (2), which are arranged at a distance from each other and are each fastened to a beam (4) or a support of the foundation structure, the extension arms or the supports being connected directly to the foundation structure below the waterline.

FLEXIBLE ROPE NET GABION

Disclosed herein is an eco-friendly, flexible rope net gabion (5) for facilitating scour protection. Said flexible rope net gabion is packed to the extent of 45% with rocks or boulders. The packing to the extent of 45% allows the flexible rope net gabion to be evenly position around the structure (100) to provide uniform anchorage.

Foundation for a structure
11072901 · 2021-07-27 · ·

A foundation (1) for a structure such as an off-shore wind turbine. The foundation (1) comprises a body (4) having a lateral surface (8,9) and a distal end (5) for insertion into a soil (2). At least a region of the lateral surface (8,9) forms a first electrode. A second electrode (7) is provided on the lateral surface (8,9) of the body (4) and is electrically insulated from the first electrode. The body (4) further comprises a spacing formation (6) for forming a gap (11) between the second electrode (7) and the soil (2) when the body (4) is inserted into the soil (2). In use, an electric potential may be established between the electrodes to induce electro-osmosis in the soil for allowing the foundation to be installed more easily. The polarity of the electric potential may also be reversed for stabilising the foundation.

Methods for retrofitting a wind turbine foundation and wind turbine foundations

A method for retrofitting a wind turbine foundation is provided. The foundation comprises a first substantially elongated pile (31) in the ground. The method further comprises: arranging a lower end of an elongated channel (41) of a second substantially elongated pile (40) around the first pile (31), wherein the elongated channel (41) extends substantially along a longitudinal direction of the second pile (40), wherein the channel (41) is configured to receive at least a portion of the first pile. The method further comprises lowering the second pile (40) such that the elongated channel (41) surrounds at least a portion of the first pile (31). Finally, the second pile (40) is driven into the ground (35).

Device and Method for Providing a Sizeable, Slender Object with a Longitudinal Direction Into an Underwater Bottom

Described is a device for providing a sizeable, slender object having a longitudinal direction into an underwater bottom from a deck of a vessel. The device includes a lifting means configured to take up the object at a lifting point thereof and position it on the underwater bottom; an upending tool connected to an edge of the vessel and configured to engage a first circumferential part of the object suspended from the lifting means and provide a pivot around which the object can be upended; and a gripping tool connected to an edge of the vessel and configured to engage a second circumferential part of the object suspended from the lifting means, whereby the first and second circumferential parts are optionally spaced apart in the longitudinal direction of the object. The gripping tool includes an actuator system configured to act on at least one of the upending tool and the gripping tool and control movements of at least one of the first and the second circumferential parts, relative to the vessel. A method using the device is also described.

Cable hang-off arrangement

Provided is a cable hang-off arrangement of an elevated platform including a number of tubular enclosures, wherein a tubular enclosure is configured to accommodate a transmission cable arrangement and includes a vertical section arranged for connection to a supporting structure of the elevated platform; a horizontal section arranged at the level of the elevated platform; and a curved section between the vertical section and the horizontal section. Also provided is a tubular enclosure of such a cable hang-off arrangement; an offshore facility; and a method of securing a transmission cable arrangement to such an offshore facility.

Assembly comprising a first and a second section and a fixation

An assembly includes a first and a second section, where each section includes a longitudinal axis, and a fixation configured to fix the first and the second sections. At least one of the first and the second sections includes a body that is configured to be engaged by the fixation. The fixation includes an abutment and a displaceable actuator, and the actuator is radially displaceable.

Offshore structure

An offshore structure having a foundation structure, wherein the foundation structure has at least a first and a second profile, the first profile is designed as a pile and the second profile is designed as a pile sleeve, the second profile encloses the first profile over a penetration length, wherein an interspace is formed between the first and the second profile, the interspace has a casting compound filling over the total penetration length, shear elements are provided on the first and/or the second profile, the shear elements extend into the interspace and effect an axial load dissipation into the casting compound filling, the shear elements are provided only over a first partial length of the penetration length, the first partial length is between 65 and 90% of the total penetration length and a second partial length is free of shear elements, wherein the second partial length forms the upper length of the penetration length in the installed position.