Patent classifications
E02B17/021
Jack-up platform with receiving space for a barge and method for offshore installation of a wind turbine
A jack-up platform is described having a horizontal working deck that may be jacked up out of the water by moving its legs to a position wherein they take support on an underwater bottom. The jack-up platform further includes a higher level deck and a lower level deck that define a receiving space for a barge, optionally suitable for carrying parts for construction of a wind turbine, and further a deballasting system configured to bring the floating hull between a receiving position at which the hull is ballasted to a receiving draft in which the lower level deck is submerged underwater and the barge may be received in the receiving space through an opening in the hull, and an operational smaller draft where substantially no water can flow on either of the lower and higher level decks. The receiving space has a centralizing system configured to substantially centralize the received floating barge in the receiving space. A method for facilitating the offshore installation of a wind turbine using the jack-up platform is also described.
Drilling installation: handling system, method for independent operations
Drilling installation comprising a cantilever with a drilling floor for performing drilling operations; further comprising an independent operations handling system arranged for handling equipment underneath the drilling floor independent of the drilling operations on the drilling floor, wherein the independent operations handling system comprises a handling element for cooperation with the equipment to be handled, wherein the handling element is extendible underneath the cantilever.
Method of securing and transferring a load between a vessel and an offshore installation and an apparatus therefor
The offshore jack-up has a hull and a plurality of moveable legs engageable with the seafloor. The offshore jack-up is arranged to move the legs with respect to the hull to position the hull out of the water. The method comprises securing the vessel with respect to the hull of the offshore jack-up when the hull is positioned out of the water and the legs engage the seafloor. A lifting mechanism mounted on the offshore jack-up engages with a cargo carrying platform positioned on the vessel. The platform is lifted with the lifting mechanism between a first position on the vessel and a second position clear of the vessel.
Offshore LNG processing facility
An offshore LNG processing plant includes a first module including a personnel accommodation facility on a first vessel, a second module including a gas treatment facility on a second vessel, and a third module including a gas liquefaction facility on a third vessel. Each of the first, second, and third modules are assembled on the corresponding vessels, and then transported to an offshore location in a body of water, such as a river, a lake, or a sea. At the offshore location, each vessel deploys legs to the bed of the body of water to raise a hull of each vessel out of the water. The first module is then coupled to the second module, and the second module is coupled to the third module. A fourth module on a fourth vessel is coupled to the third module to provide LNG storage.
Crane vessel
A jack-up crane vessel or semi-submersible crane vessel is provided including a hull with a deck, and a crane on the hull for hoisting a load outside the deck. The crane includes a slewing crane base with a first suspension, an elongated boom that is rotatable around a horizontal rotation axis with respect to the first suspension, at least two pendants between the boom and the first suspension that mutually converge toward the distal boom section, a boom spacer between the boom and the first suspension, and a boom luffing installation for driving the rotation of the boom around the horizontal rotation axis between a lowered transport position and a raised operational position. In the direction of the vertical rotation axis the first suspension extends at least in the lowered transport position of the boom above the boom heel of the boom.
Installation arrangement with jack-up rig and a barge and a method for setting up the installation arrangement
An installation arrangement with a barge and a jack-up rig which floats in a first position on the sea and has a hull which is slotted vertically from the surface of the sea and has a slot width which is greater than that of the barge so that the barge can move into a slot, wherein the jack-up rig has supporting legs which can move to and from along a height relative to the hull and can be set down on the seabed. The hull and the barge can be lifted along the support legs. The slot extends along the entire longitudinal extent of the barge over the entire height of the hull, and securing means are arranged on the barge and on the slot and said securing means interact and secure the barge in the raised position in a fixed position on the jack-up rig.
HABITABLE STRUCTURE FOR MARINE ENVIRONMENTS
Scale habitable units are disclosed for use in marine environments, such as the open sea, which are inexpensive to assemble and maintain, while providing habitable space.
Method for Lifting an Object From a Vessel Deck
Described is a method for lifting an object from a vessel deck. A hoisting means present on the vessel deck is provided with a hoisting cable to which an attaching means for the object is coupled. The object is connected to the attaching means and then taken up and displaced relative to the vessel deck using the attaching means. The swinging movements of the attaching means and of the object connected thereto, occurring under the influence of wave and wind forces, are damped during displacement by a gyroscope which is connected to the hoisting cable, attaching means and/or object and which includes a rotation-symmetrical body rotating around a primary rotation axis.
JACK-UP PLATFORM COMPRISING A MOORING SYSTEM AND A METHOD FOR MOORING A FLOATING VESSEL
A jack-up platform is described having a horizontal working deck that may be jacked up out of the water by moving its legs to a position wherein they take support on an underwater bottom. The jack-up platform further comprises a mooring system for mooring a floating vessel at a mooring side of the jack-up platform. The mooring system comprises an elongated support means for supporting a hull part of the floating vessel, and guiding means connected to the hull of the jack-up platform at the mooring side. The guiding means are able to rigidly hold the elongated support means in a support position, in which the elongated support means is within reach of the hull part of the floating vessel to be supported when the hull is jacked out of the water and the jack-up platform rests on its legs. A method for mooring a floating vessel using the jack-up platform is also described.
Drilling installation: handling system, method for independent operations
Drilling installation comprising a cantilever with a drilling floor for performing drilling operations; further comprising an independent operations handling system arranged for handling equipment underneath the drilling floor independent of the drilling operations on the drilling floor, wherein the independent operations handling system comprises a handling element for cooperation with the equipment to be handled, wherein the handling element is extendible underneath the cantilever.