E04H4/0062

Mikveh and method for constructing thereof
09693647 · 2017-07-04 ·

Constructing a mikveh by permanently fixing at least one initial building unit to the ground of an installation site, connecting, in a sealed manner, additional building units to the initial building unit(s), for producing a sealed vessel, where the length of each of most of said building units is at least 50 centimeters, and the weight per area thereof is less than 250 kg per square meter.