E21B7/185

System and method for construction and completion of production and injection wells in the pre-salt fields

The present invention refers to a system and method for construction and completion of wells in the pre-salt production and injection fields. The application of the present invention allows a reduction in well construction time of approximately seven days considering the drilling and completion of the well. The system comprises string accessories, cement, AMB, production string, casings, HFIV, fluid, wellhead system, subsea equipment, DHSV and packer. The method aims at reducing one well phase, resulting in three drilling phases, with the running in of only two casings and the completion in an open well with part of the same exposed to the saline formation, herein called 2R-PAC.

SYSTEM AND METHOD FOR CONSTRUCTION AND COMPLETION OF PRODUCTION AND INJECTION WELLS IN THE PRE-SALT FIELDS

The present invention refers to a system and method for construction and completion of wells in the pre-salt production and injection fields. The application of the present invention allows a reduction in well construction time of approximately seven days considering the drilling and completion of the well. The system comprises string accessories, cement, AMB, production string, casings, HFIV, fluid, wellhead system, subsea equipment, DHSV and packer. The method aims at reducing one well phase, resulting in three drilling phases, with the running in of only two casings and the completion in an open well with part of the same exposed to the saline formation, herein called 2R-PAC.

System and method for construction and completion of production and injection wells in the pre-salt fields

The present invention refers to a system and method for construction and completion of wells in the pre-salt production and injection fields. The application of the present invention allows a reduction in well construction time of approximately seven days considering the drilling and completion of the well. The system comprises string accessories, cement, AMB, production string, casings, HFIV, fluid, wellhead system, subsea equipment, DHSV and packer. The method aims at reducing one well phase, resulting in three drilling phases, with the running in of only two casings and the completion in an open well with part of the same exposed to the saline formation, herein called 2R-PAC.