Patent classifications
E21D11/10
Bearing Plate of an Integrated Construction System
Various implementations described herein are directed to a load bearing ledger fitting, a modular header beam, a perimeter safety deck, a multi-purpose bearing plate, and a mega-shore bearing plate of an integrated construction system.
Bearing Plate of an Integrated Construction System
Various implementations described herein are directed to a load bearing ledger fitting, a modular header beam, a perimeter safety deck, a multi-purpose bearing plate, and a mega-shore bearing plate of an integrated construction system.
BULKHEAD FOR FACILITATING BACKFILLING OF A STOPE UPON MINING THEREOF
A bulkhead for use in facilitating backfilling of a stope upon mining thereof includes a skid having a base and a pair of post members extending upwardly from the base. The bulkhead also includes a barrier having a primary grid assembly pivotally supported on the pair of post members, at least one secondary grid assembly selectively, and sequentially, stacked upon the primary grid assembly; and a brace selectively stacked upon an uppermost one of the primary grid assembly and the at least one secondary grid assembly. An aspect ratio of the barrier, prior to, backfilling, is operably adjustable by individually adjusting one or more of the primary grid assembly, the secondary grid assembly and the brace to confirm with an aspect ratio of an access tunnel, or a brow, adjacent to the stope for subsequently facilitating backfilling of the stope.
Construction system for subway station
Described herein is a construction system for a subway station, wherein the construction of guide walls is accomplished using a guide wall steel formwork system, the construction of support beams is accomplished using a support beam steel formwork system, the construction of sidewalls is accomplished using a sidewall trolley, and the construction of floor slabs is accomplished using a floor slab trolley.
Construction system for subway station
Described herein is a construction system for a subway station, wherein the construction of guide walls is accomplished using a guide wall steel formwork system, the construction of support beams is accomplished using a support beam steel formwork system, the construction of sidewalls is accomplished using a sidewall trolley, and the construction of floor slabs is accomplished using a floor slab trolley.
Tunnel waterproofing composition and system
Disclosed are methods, compositions, and composition packages for spray-coating a membrane for waterproofing a concrete tunnel applications. After primer coating is applied onto a surface in the tunnel, the coating composition is sprayed to form a membrane, and then concrete is cast or sprayed against the membrane so that it can bond to the membrane. Coating compositions comprise two or more acrylate monomers, as well as initiator, accelerator, and optional additive. Preferably, the coating composition is established by using a two-part package, one part having initiator, the other part having accelerator, and each part containing the monomers and optional additives so that the two parts can be shipped to the application site and mixed in a 1:1 ratio during spraying. The waterproofing coating composition provides excellent bonding with concrete.
Tunnel waterproofing composition and system
Disclosed are methods, compositions, and composition packages for spray-coating a membrane for waterproofing a concrete tunnel applications. After primer coating is applied onto a surface in the tunnel, the coating composition is sprayed to form a membrane, and then concrete is cast or sprayed against the membrane so that it can bond to the membrane. Coating compositions comprise two or more acrylate monomers, as well as initiator, accelerator, and optional additive. Preferably, the coating composition is established by using a two-part package, one part having initiator, the other part having accelerator, and each part containing the monomers and optional additives so that the two parts can be shipped to the application site and mixed in a 1:1 ratio during spraying. The waterproofing coating composition provides excellent bonding with concrete.
ROLLER BRACKET FOR TUNNEL FORMS
A roller bracket having a base, a raising and lowering mechanism, a platform, and horizontal and vertical rollers. The base is attached to the vertical face of a starter wall at a level to provide a desired height for a concrete ceiling. With the platform in the raised position, the bottom edge of a tunnel form is lowered between the vertical roller and the starter wall onto the horizontal rollers. A wedge is driven between the vertical roller and the tunnel form to seal the tunnel form against the starter wall. After concrete has been poured, retained by the seal, and cured to form the concrete walls and ceiling, the mechanism can lower the platform to strip the tunnel form from the tunnel. The tunnel form can then be rolled away on the horizontal rollers while being retained on the horizontal rollers by the vertical roller and the starter wall.
Method of treating tunnel collapse with roof-contacted shield support
A method of treating tunnel collapse includes mounting a shield plate, a column, a support column to form a combined support and moving the combined support onto an operation platform, lifting up the combined support, and enabling the height of canopy to be greater than the height of an initial supporting arch. Actively contacting a surface of a collapse cavity by a fixed support column and bearing a load, and lifting a movable support column to the top of the collapse cavity and bearing a load. Mounting an initial supporting arch, and welding the initial supporting arch with the support column. Removing a hydraulic prop after the support column contacting the initial supporting arch is cut off and the load of the shield plate is transferred to a supporting shed. Mounting an exhaust pipe and a filling material pumping pipe, and pumping a filling material into a collapse cavity space.
Formwork System
A formwork system (10; 60), especially for tunnel construction, includes at least one support arrangement (14) for supporting at least one formwork element (16-26; 72-78). The formwork system further includes at least one concrete pump (36), a plurality of concrete supply units (42) for supply to the formwork element and at least one controller (32). On the formwork element (16-26; 72-78) and/or on the support arrangement (14) at least two pressure sensors (44; 92) are disposed at different vertical positions and are connected to the controller (32) of the formwork system, which pressure sensors (44; 92) are designed to measure the pressure acting upon the formwork elements (16-26; 72-78) at a minimum of two different heights of the formwork element, and that the controller (32) is designed to control the concrete supply units (42) individually, dependent on the signal from the pressure sensors (44; 92).