E02D5/30

Tip-grouting tools including distribution materials and related methods

Tip-grouting tools may include at least one inlet, an outlet in communication with the at least one inlet, and a distribution material defining a tortuous path between the at least one inlet and the outlet. The distribution material may be configured to distribute at least one of pressure, mass, and flow of grouting material across the outlet.

PILE JOINT
20210388570 · 2021-12-16 ·

The invention relates to a pile joint, which comprises a first concrete pile, a second concrete pile, and a coupling system therebetween for connecting and locking the concrete piles relative to each other. The coupling system includes a lock housing and a lock spindle connectible to each other and provided with transverse holes in such a way that the lock housing's transverse holes and the lock spindle's transverse hole settle substantially in line with each other for receiving a locking pin when the lock housing and the lock spindle are connected to each other. In addition, the lock housing is provided with a locking ring for retaining the locking pin in a position locking the lock housing and the lock spindle to each other. For ensuring the pipe joint's installation and durability there is in alignment with a first transverse hole of the lock housing a guidance pipe and in alignment with a second transverse hole of the lock housing, opposite to its first hole, a locking seat closed at one end and intended for the locking ring. The locking ring is adapted to be movable in a groove included in the locking seat and the locking pin is provided with a recess in the lengthwise direction of the locking pin to receive the locking ring.

PILE JOINT
20210388570 · 2021-12-16 ·

The invention relates to a pile joint, which comprises a first concrete pile, a second concrete pile, and a coupling system therebetween for connecting and locking the concrete piles relative to each other. The coupling system includes a lock housing and a lock spindle connectible to each other and provided with transverse holes in such a way that the lock housing's transverse holes and the lock spindle's transverse hole settle substantially in line with each other for receiving a locking pin when the lock housing and the lock spindle are connected to each other. In addition, the lock housing is provided with a locking ring for retaining the locking pin in a position locking the lock housing and the lock spindle to each other. For ensuring the pipe joint's installation and durability there is in alignment with a first transverse hole of the lock housing a guidance pipe and in alignment with a second transverse hole of the lock housing, opposite to its first hole, a locking seat closed at one end and intended for the locking ring. The locking ring is adapted to be movable in a groove included in the locking seat and the locking pin is provided with a recess in the lengthwise direction of the locking pin to receive the locking ring.

PILE FOUNDATION AND METHOD OF CONTRUCTING PILE FOUNDATION

The present invention relates to a pile foundation includes: a pile that extends in a vertical direction and that supports a tower structure, a pile head protruding above the ground, and a lower end of the pile being open; and a ground improving body that, in a state in which the pile has been driven into the ground, is provided inside the pile, and at least a part of the ground improving body being in close contact with an inner peripheral surface of the pile.

Modular Slab, Slab System, Piles and Methods of Use Thereof
20220205240 · 2022-06-30 ·

A modular slab, slab system, piles and methods of use thereof are described along with specific applications and methods of manufacture. The slab or slab system may be pre-insulated and pre-finished before being assembled on site. The slab system may be advantageous to use as a replacement for traditional in-situ poured building foundations. The slab system may also have uses in other fields such as for floors, roads, bridges, pavements/side walks and other civil and structural applications.

FOUNDATION FOR A TOWER STRUCTURE, TOWER FOR A WIND POWER INSTALLATION, AND WIND POWER INSTALLATION, AND ALSO METHOD FOR ESTABLISHING A FOUNDATION FOR A TOWER STRUCTURE
20220154418 · 2022-05-19 ·

A foundation for a tower structure, in particular for a tower of a wind power installation, comprising a soil improvement unit with piles and with a slab which is arranged on the piles and which has a foundation side, wherein the foundation side forms a foundation plane, and a shallow foundation which has an areal standing side for mounting onto the foundation plane, wherein the shallow foundation is arranged on the slab.

FOUNDATION FOR A TOWER STRUCTURE, TOWER FOR A WIND POWER INSTALLATION, AND WIND POWER INSTALLATION, AND ALSO METHOD FOR ESTABLISHING A FOUNDATION FOR A TOWER STRUCTURE
20220154418 · 2022-05-19 ·

A foundation for a tower structure, in particular for a tower of a wind power installation, comprising a soil improvement unit with piles and with a slab which is arranged on the piles and which has a foundation side, wherein the foundation side forms a foundation plane, and a shallow foundation which has an areal standing side for mounting onto the foundation plane, wherein the shallow foundation is arranged on the slab.

CONCRETE INSIDE INTERFACE PROCESSING STRUCTURE AND METHOD FOR SECANT PILE CONSTRUCTION

A concrete inside interface processing structure for secant pile construction, including secant concrete pile, formed plain concrete pile, rotary jet grouting piles, steel mesh sheet, ribbed steel bar, Y-shaped connecting piece, reinforced concrete pile, and U-shaped connecting piece; drilled holes are arranged at intervals along axis of the formed plain concrete pile; the ribbed steel bar is anchored in each drilled hole; the steel mesh sheet is formed by connecting longitudinal bars and transverse bars, and driven into a soil body between the formed plain concrete piles; the concrete layer is formed by spraying concrete on the steel mesh sheet; the reinforced concrete pile is cast at outside of the formed plain concrete pile, and tangent to the formed plain concrete pile, and interlocked with the rotary jet grouting piles; the rotary jet grouting piles are tangent to the formed plain concrete pile or secant concrete pile.

CONCRETE INSIDE INTERFACE PROCESSING STRUCTURE AND METHOD FOR SECANT PILE CONSTRUCTION

A concrete inside interface processing structure for secant pile construction, including secant concrete pile, formed plain concrete pile, rotary jet grouting piles, steel mesh sheet, ribbed steel bar, Y-shaped connecting piece, reinforced concrete pile, and U-shaped connecting piece; drilled holes are arranged at intervals along axis of the formed plain concrete pile; the ribbed steel bar is anchored in each drilled hole; the steel mesh sheet is formed by connecting longitudinal bars and transverse bars, and driven into a soil body between the formed plain concrete piles; the concrete layer is formed by spraying concrete on the steel mesh sheet; the reinforced concrete pile is cast at outside of the formed plain concrete pile, and tangent to the formed plain concrete pile, and interlocked with the rotary jet grouting piles; the rotary jet grouting piles are tangent to the formed plain concrete pile or secant concrete pile.

SYSTEM AND METHOD FOR MONITORING EARTH PRESSURE AND DISPLACEMENT OF MINIATURE STEEL PIPE PILE BODY

A system and method for monitoring an earth pressure and displacement of a miniature steel pipe pile body. Sensor installation holes are drilled at predetermined positions outside the steel pipe pile body and sensor metal protective shell with a thickness slightly lower than that of the XY-TY02A resistance-type miniature earth pressure gauge is welded on the steel pipe pile body. The XY-TY02A resistance-type miniature earth pressure gauges are stuck on the steel pipe pile body. The transmission line of the XY-TY02A resistance-type miniature earth pressure gauges passes through the sensor installation holes and are connected to data acquisition system. The reflective sheet base is welded at the preset position of the miniature steel pipe pile and the reflective sheet is attached to the reflective sheet base to realize displacement monitoring.