Patent classifications
E02D2300/0034
NOVEL WIND TURBINE AND ANCHORING SYSTEM THEREOF
A novel wind turbine, the tower of which ending with three legs and which is also anchored to the ground by means of a characteristic anchoring system depending on the type of existing soil. It is anchored on conventional rock soil with a pile foundation, it is anchored in a hard-rock soil with an anchor-rock foundation, it is anchored in a non-rocky soil with a gravitational foundation and it is anchored on clayey or swampy soil with a gravitational foundation reinforced with piles.
Hybrid permanent anchor
A hybrid permanent anchor is proposed. The hybrid permanent anchor includes: a fixed body disposed between a compression part and a tension part and coupling the compression part and the tension part to each other; the tension part coupled to a front end of the fixed body and transmitting tension to the permanent anchor when tensile stress is generated; the compression part coupled to a rear end of the fixed body and transmitting compressive force to the permanent anchor when compressive stress is generated; a PC steel strand coupled to a rear end of the compression part and having a protective pipe thereon; and an anchor head part fixing the permanent anchor to a structure.
NOVEL WIND TURBINE AND ANCHORING SYSTEM THEREOF
A novel wind turbine, the tower of which ending with three legs and which is also anchored to the ground by means of a characteristic anchoring system depending on the type of existing soil. It is anchored on conventional rock soil with a pile foundation, it is anchored in a hard-rock soil with an anchor-rock foundation, it is anchored in a non-rocky soil with a gravitational foundation and it is anchored on clayey or swampy soil with a gravitational foundation reinforced with piles.
Multi-piece pre-assembled raft foundation and construction method thereof
A multi-piece pre-assembled raft foundation is provided and includes pre-assemble bottom layer rebars of foundation slab, foundation steel columns, upper layer rebars of the foundation slab, and foundation rebars. The pre-assembled raft foundation is transported to a construction site for final assembly. A construction method of the multi-piece pre-assembled raft foundation is also provided.
SLOPE REPAIR METHOD
The present invention provides a slope repair method. The method includes pretreating a slope, so that an average roughness of the pretreated slope is not greater than ±8 cm to ±12 cm per linear meter; (2) hanging a hard protective mesh on the pretreated slope, where the distance between the hard protective mesh and the slope is 3-4 cm, and the hard protective mesh has an aperture size of 4-6 cm; and (3) spraying a loam-like matrix on the slope with the hard protective mesh hanged, where the loam-like matrix includes not less than 0.04/m.sup.2 of plant seeds; the plant seeds include tree seeds, shrub seeds and herb seeds with a mass ratio of (2.5-3.5):(4-6):(1.5-2.5). The method provided by the present invention effectively restores the mountain vegetation, and only needs 1-2 years of artificial maintenance after the restoration to form a cyclically stable ecosystem.
PROTECTIVE DEVICE, SLOPE SECURING MEANS AS WELL AS USE OF AND METHOD FOR PRODUCING THE PROTECTIVE DEVICE
A protective device, in particular an anti-erosion protective device, preferably a geotextile, is at least configured to be planarly spread over a surface, in particular an earth surface, that is to be protected, and which is at least largely implemented of a plurality of synthetic fibers interconnected via force-fit connection and/or substance-to-substance bond and arranged in such a way that they form an essentially three-dimensional structuring, wherein at least a large portion of the synthetic fibers are at least largely biodegradable.
METHOD FOR SEALING POST-CAST STRIP IN FOUNDATION WITH NO GAP
A method for sealing a post-cast strip in a foundation with no gap includes the following steps: mounting steel plates, horizontal pipes and vertical pipes cooperatively layer by layer in a post-cast strip, respectively, such that the upper open end of each vertical pipe protrudes from the ground through the post-cast strip; pouring grout into the post-cast strip from the top of the post-cast strip after the end of the settlement of the foundation, and carrying out high-pressure grouting into the vertical pipe using grouting equipment simultaneously; delivering the sealing grout poured into the vertical pipe to the horizontal pipes, such that the sealing grout overflows from the grout outlets of the horizontal pipes to densely fill up existing gaps; and cutting off the portion of the vertical pipe above the ground after the post-cast strip is completely sealed, and levelling the top of the cut-off vertical pipe with concrete.
HYBRID PERMANENT ANCHOR
A hybrid permanent anchor is proposed. The hybrid permanent anchor includes: a fixed body disposed between a compression part and a tension part and coupling the compression part and the tension part to each other; the tension part coupled to a front end of the fixed body and transmitting tension to the permanent anchor when tensile stress is generated; the compression part coupled to a rear end of the fixed body and transmitting compressive force to the permanent anchor when compressive stress is generated; a PC steel strand coupled to a rear end of the compression part and having a protective pipe thereon; and an anchor head part fixing the permanent anchor to a structure.
CONNECTOR FOR SOIL REINFORCING AND METHOD OF MANUFACTURING
An apparatus, system and method of connecting an earthen formation to a facing of a mechanically stabilized earth (MSE) structure in which a connector includes a single piece of wire that defines an opening for coupling the connector to an anchor and a pair parallel legs for mechanically connecting the to a soil reinforcing element.
Protective device, slope securing means as well as use of and method for producing the protective device
A protective device, in particular an anti-erosion protective device, preferably a geotextile, is at least configured to be planarly spread over a surface, in particular an earth surface, that is to be protected, and which is at least largely implemented of a plurality of synthetic fibers interconnected via force-fit connection and/or substance-to-substance bond and arranged in such a way that they form an essentially three-dimensional structuring, wherein at least a large portion of the synthetic fibers are at least largely biodegradable.