E04B1/046
MODULAR INTEGRATED BUILDING AND CONSTRUCTION METHOD THEREOF
Disclosed herewith a modular integrated building and a construction method thereof. The building comprises multiple prefabricated room units (1). A bottom of a load-bearing structure of the prefabricated room unit (1) is provided with a semi-prefabricated connecting port (2). Reinforcing bars arranged at a top of the prefabricated room unit (1) of a next floor are inserted in the connecting port (2) and thus connected with reinforcing bars arranged therein, so that the prefabricated room units (1) of two adjacent floors are connected with each other through in-situ casting concrete in the connecting port (2). A cast-in-situ concrete interlayer (3) is arranged on a top plate (11) of the prefabricated room unit (1) of a next floor, for connecting adjacent prefabricated room units (1) of a same floor together.
Modular integrated building and construction method thereof
Disclosed herewith a modular integrated building and a construction method thereof. The building comprises multiple prefabricated room units (1). A bottom of a load-bearing structure of the prefabricated room unit (1) is provided with a semi-prefabricated connecting port (2). Reinforcing bars arranged at a top of the prefabricated room unit (1) of a next floor are inserted in the connecting port (2) and thus connected with reinforcing bars arranged therein, so that the prefabricated room units (1) of two adjacent floors are connected with each other through in-situ casting concrete in the connecting port (2). A cast-in-situ concrete interlayer (3) is arranged on a top plate (11) of the prefabricated room unit (1) of a next floor, for connecting adjacent prefabricated room units (1) of a same floor together.
Ductile Connections for Pre-Formed Construction Elements
Precast construction elements are described suitable for use in high seismic area. The precast construction elements can be precast, pre-topped double tees. The precast construction elements incorporate a passive energy dissipation device in a flange. The energy dissipation device provides a ductile connection having a deformation capacity of larger than 0.6. Adjacent elements are connected to one another at joints that include the passive energy dissipation device. Passive energy dissipation devices can be passive hysteretic dampeners, such as U-shaped flexural plates. Passive energy dissipation devices can be bar dissipaters (e.g., grooved dissipaters). Also described are passive hysteretic dampers that include U-shaped flexural plates held in conjunction with a reinforcement element that defines a circle around which the flexural plate can bend.
CONCRETE STRUCTURE BODY AND MANUFACTURING METHOD THEREOF
A concrete structure body includes a first concrete member having a first facing surface; a second concrete member having a second facing surface and disposed such that the first facing surface and the second facing surface face each other; a connection portion that fills a gap between the first facing surface and the second facing surface; and a tendon disposed in the connection portion to extend along the first facing surface and the second facing surface and to which a tensile force is applied in a longitudinal direction.
PRECAST MODULAR STRUCTURAL BUILDING METHOD
The present invention is a modular structural building method consisting of prefabricated, precast, composite reinforced concrete raised floor and steel beam panels with adjustable levelling connection assemblies between panels, supported by columns. The system has the ability to accommodate the use of the floor by construction personnel during the on-site assembly process. The perimeter of the raised floor slab can be provided with ducts for a field installed conventional reinforcement means to create a continuous structural diaphragm for the floor panel.
MODULAR INTEGRATED BUILDING AND CONSTRUCTION METHOD THEREOF
Disclosed herewith a modular integrated building and a construction method thereof. The building comprises multiple prefabricated room units (1). A bottom of a load-bearing structure of the prefabricated room unit (1) is provided with a semi-prefabricated connecting port (2). Reinforcing bars arranged at a top of the prefabricated room unit (1) of a next floor are inserted in the connecting port (2) and thus connected with reinforcing bars arranged therein, so that the prefabricated room units (1) of two adjacent floors are connected with each other through in-situ casting concrete in the connecting port (2). A cast-in-situ concrete interlayer (3) is arranged on a top plate (11) of the prefabricated room unit (1) of a next floor, for connecting adjacent prefabricated room units (1) of a same floor together.
Precast modular structural building system and method
The present invention is a modular structural building system and method consisting of prefabricated, precast, composite reinforced concrete raised floor and steel beam panels with adjustable levelling connection assemblies between panels, supported by columns. The system has the ability to accommodate the use of the floor by construction personnel during the on-site assembly process. The perimeter of the raised floor slab can be provided with ducts for a field installed conventional reinforcement means to create a continuous structural diaphragm for the floor panel.
PRECAST MODULAR STRUCTURAL BUILDING SYSTEM AND METHOD
The present invention is a modular structural building system and method consisting of prefabricated, precast, composite reinforced concrete raised floor and steel beam panels with adjustable levelling connection assemblies between panels, supported by columns. The system has the ability to accommodate the use of the floor by construction personnel during the on-site assembly process. The perimeter of the raised floor slab can be provided with ducts for a field installed conventional reinforcement means to create a continuous structural diaphragm for the floor panel.
Tank and method for constructing dike
In an LNG tank, a dike is formed by arranging precast blocks in the circumferential direction and layering the precast blocks in the vertical direction. Each of the precast blocks has loop joints on the top, bottom, left, and right side faces, and concrete is deposited between each two precast blocks adjacent in the circumferential direction and the vertical direction, whereby masonry joints are formed in the vertical direction and the circumferential direction. Prestress is imparted to the dike by PC steel members. The PC steel members are provided in the circumferential direction and the vertical direction of the dike, and are arranged so as to avoid the masonry joints in the circumferential direction and the vertical direction. Therefore, it is possible to construct the dike in a short time, and it is possible to provide a tank or the like that can reduce the construction period.
TANK AND METHOD FOR CONSTRUCTING DIKE
In an LNG tank, a dike is formed by arranging precast blocks in the circumferential direction and layering the precast blocks in the vertical direction. Each of the precast blocks has loop joints on the top, bottom, left, and right side faces, and concrete is deposited between each two precast blocks adjacent in the circumferential direction and the vertical direction, whereby masonry joints are formed in the vertical direction and the circumferential direction. Prestress is imparted to the dike by PC steel members. The PC steel members are provided in the circumferential direction and the vertical direction of the dike, and are arranged so as to avoid the masonry joints in the circumferential direction and the vertical direction. Therefore, it is possible to construct the dike in a short time, and it is possible to provide a tank or the like that can reduce the construction period.