Patent classifications
E04B5/38
Methods and apparatus for constructing multi-storey buildings
The invention provides a method of constructing a modular multi-storey building including: assembling first and second building modules in a vertical arrangement at an 5 installation location to form a multi-storey building structure, wherein temporary support members between the first and second building modules vertically support at least part of the second building module above the first building module; installing a permanent support structure 10 and connecting it to the first and second building modules to vertically support the second building module above the first building module; and removing the temporary support members.
Methods and apparatus for constructing multi-storey buildings
The invention provides a method of constructing a modular multi-storey building including: assembling first and second building modules in a vertical arrangement at an 5 installation location to form a multi-storey building structure, wherein temporary support members between the first and second building modules vertically support at least part of the second building module above the first building module; installing a permanent support structure 10 and connecting it to the first and second building modules to vertically support the second building module above the first building module; and removing the temporary support members.
Sensor device, and systems and methods for obtaining and providing information relating to concrete mixtures and construction projects
A plurality of sensor devices are placed at a plurality of locations at which concrete is to be poured, wherein each sensor device is adapted to measure humidity. For example, the plurality of sensors may be placed at selected locations within a form at a construction site associated with a construction project. Concrete is poured at the plurality of locations. Data representing humidity measurements is received from the plurality of sensor devices. For each of the plurality of sensor devices, a respective spike in humidity and a respective time associated with the spike in humidity are determined, thereby determining a plurality of spikes in humidity and a plurality of corresponding times. A build rate is determined for the construction project based on the plurality of spikes in humidity and a plurality of corresponding times.
Sensor device, and systems and methods for obtaining and providing information relating to concrete mixtures and construction projects
A plurality of sensor devices are placed at a plurality of locations at which concrete is to be poured, wherein each sensor device is adapted to measure humidity. For example, the plurality of sensors may be placed at selected locations within a form at a construction site associated with a construction project. Concrete is poured at the plurality of locations. Data representing humidity measurements is received from the plurality of sensor devices. For each of the plurality of sensor devices, a respective spike in humidity and a respective time associated with the spike in humidity are determined, thereby determining a plurality of spikes in humidity and a plurality of corresponding times. A build rate is determined for the construction project based on the plurality of spikes in humidity and a plurality of corresponding times.
Method for constructing a concrete floor in a multistorey building
The invention provides a method of forming a concrete floor of a multistorey building, the method including: installing a first building module having a first precast concrete floor slab adjacently spaced from a second building module having a second precast concrete floor slab, at least the first precast concrete floor slab supporting an upstanding support member for supporting an upper floor; forming a channel between the spaced first and second precast concrete floor slabs by providing supporting formwork between the floor slabs for supporting poured concrete; and pouring concrete into the channel to form a concrete connection between the first and second precast slabs, thereby forming a concrete floor of a building.
Method for constructing a concrete floor in a multistorey building
The invention provides a method of forming a concrete floor of a multistorey building, the method including: installing a first building module having a first precast concrete floor slab adjacently spaced from a second building module having a second precast concrete floor slab, at least the first precast concrete floor slab supporting an upstanding support member for supporting an upper floor; forming a channel between the spaced first and second precast concrete floor slabs by providing supporting formwork between the floor slabs for supporting poured concrete; and pouring concrete into the channel to form a concrete connection between the first and second precast slabs, thereby forming a concrete floor of a building.
Composite subgrade formwork and method of use
The disclosure presents a formwork system which utilizes Fiber Reinforced Polymer (FRP) panels to create modular segments to form and reinforce concrete subgrade structures. The segments may be rearranged and bonded together to conform to intended dimensions of many subgrade structures. The segments are manufactured by cast molding, bonding or vacuum forming. The segments may include integrated FRP stanchions to prevent deflection of the panels during concrete placement. The stanchions also may be used for positioning structural steel or FRP rebar. FRP bars are permanently bonded to the interior sides of the panels inside the segments. In use, the assembled segments are filled with concrete. After the concrete is cured, the segments remain in place and function as external protection and reinforcement for the cured concrete.
Panel and slab designed for forming a floor or a wall and methods for manufacturing such panels and slabs
A panel designed for forming a floor or a wall, including several beams, each beam including an armature fixed to a base, each base being made from a settable fixing material, the panel including a support having several formwork parts arranged salient from a surface receiving the support, the formwork parts forming housings to respectively receive the beams and having a bottom that is formed by the surface receiving the support, each beam being located in a respective housing where the base of the beam is fixed to the bottom of the housing, the support being formed by a single piece.
REBAR-EQUIPPED LUMBER FORM AND CONSTRUCTION METHOD USING REBAR-EQUIPPED LUMBER FORM
Provided are a rebar-equipped lumber form and a construction method using a rebar-equipped lumber form capable of shortening construction time by replacing a deck plate. The lumbering form 10 includes a wood panel 11, and a unitized rebar 12 disposed and fixed on the wood panel 11.
REBAR-EQUIPPED LUMBER FORM AND CONSTRUCTION METHOD USING REBAR-EQUIPPED LUMBER FORM
Provided are a rebar-equipped lumber form and a construction method using a rebar-equipped lumber form capable of shortening construction time by replacing a deck plate. The lumbering form 10 includes a wood panel 11, and a unitized rebar 12 disposed and fixed on the wood panel 11.