F17C2250/03

FUEL GAUGING SENSING DEVICES

A fuel gauging sensing device for a fuel tank for aircrafts includes an optical fiber harness along the internal surface of the tank, a master optical controller connected to a first terminal of the optical fiber harness, a slave optical controller connected to a second terminal of the optical fiber harness, wherein the optical fiber harness includes Fiber Bragg Grating (FBG) sensors spaced in the optical fiber harness between 1 mm and 25 mm to provide temperature gradients inside the tank and wherein the master and slave optical controllers are configured to obtain the fuel gauging of the tank based on the output from the FBG sensors.

HYDROGEN REFUELING SYSTEM AND METHOD OF HYDROGEN REFUELING

This invention can provide a hydrogen refueling system capable to reduce waiting time for refueling H.sub.2 to vehicles. The system is designed and operated to acquire the residual pressure in the vehicle the that connects to the dispenser, then to calculate sufficient conditions to perform complete refueling of the connected vehicle (in particular minimum pressure in buffers), and then to start H.sub.2 transfer to the vehicle as soon as the conditions are met. Waiting time can be further reduced with minimum investment by having a H.sub.2 dispenser with two H.sub.2 refueling hoses which has only one H.sub.2 flow control valve and/or only one H.sub.2 cooling heat exchanger and/or only one H.sub.2 flow metering system.

NATURAL GAS HYDRATE TANK CONTAINER LOADING SYSTEM ENABLING AUTOMATED CONNECTION OF ELECTRIC POWER LINE AND BOIL-OFF GAS PIPE

The present invention relates to a natural gas hydrate tank container loading system for transporting natural gas hydrate, and the present invention provides a natural gas hydrate tank container loading system which enables automated connection of an electric power line and a boil-off pipe, and may automatically connect an electric power line and automatically connect the pipe by simultaneously stacking respective natural gas hydrate tank containers, in order to solve problems of a transportation method using the existing natural gas hydrate tank containers in the related art in that an operation of connecting an electric power line to a refrigerator for minimizing the occurrence of boil-off gas and maintaining a phase equilibrium condition in the tank containers and an operation of connecting the pipe for discharging the boil-off gas need to be manually and individually performed for long-distance transportation of a large amount of natural gas hydrate by using a ship, which causes an inconvenience.

Filling Station for Pressurized Fluids
20230194051 · 2023-06-22 ·

A filling station for pressurized fluids has a storage container and a dispenser supplied thereby, comprising a high-pressure path and a low-pressure path. The storage container is partitioned into separate sections, which are each connected to the input of a high-pressure pump via a first switching valve and to the output of said high-pressure pump via a second switching valve. The first or second switching valves are connected on their pump sides to the low-pressure path of the dispenser via a third switching valve. The output of the high-pressure pump supplies a high-pressure reservoir via a fourth switching valve, which high-pressure reservoir is connected to the high-pressure path of the dispenser via a fifth switching valve.

Control Unit and Method for Operating a Pressure Vessel Valve of a Pressure Vessel
20230184388 · 2023-06-15 ·

A control unit is provided for a pressure vessel system having at least one pressure vessel with a pressure vessel valve designed to convey fuel from the pressure vessel into a discharge line in order to supply an energy converter. The control unit is configured to determine that a reduced-power operating mode of the energy converter is present, wherein, in the reduced-power operating mode, the fuel mass flow for supplying the energy converter is less than or equal to a predefined mass flow threshold value. The control unit is further configured to cause the pressure vessel valve to be intermittently opened during the execution of the reduced-power operating mode, in order to convey in each case a surge of fuel from the pressure vessel into the discharge line.

VEHICLE AIR MANAGEMENT SYSTEM
20230182664 · 2023-06-15 · ·

A vehicle air management system is provided. The vehicle air management system comprises an air tank and a boost air tank. Based on a signal indicative of an air consumption level of at least one air consumer, a control unit is configured to control the vehicle air management system to deliver pressurized air from the boost air tank to be supplied to an air compressor.

Cryogenic liquid tank

A hydrogen storage tank for a hydrogen fueled aircraft. The tank has a wall made of layers of aerogel sections around a hard shell layer, sealed within a flexible outer layer, and having the air removed to form a vacuum. The periphery of each layer section abuts other sections of that layer, but only overlies the periphery of the sections of other layers at individual points. The wall is characterized by a thermal conductivity that is lower near its gravitational top than its gravitational bottom. The tank has two exit passageways, one being direct, and the other passing through a vapor shield that extends through the wall between two layers of aerogel. A control system controls the relative flow through the two passages to regulate the boil-off rate of the tank.

DEVICE FOR REGULATING THE PRESSURE OF AN AIRCRAFT CRYOGENIC FUEL TANK

A pressure regulating device includes an on-board storage tank, a mixing chamber, first and second lines, a recirculation line, a pressure sensor and a controller. The storage tank stores and supplies cryogenic fuel to a combustion chamber and includes a booster pump. The first line supplies cryogenic fuel in the liquid state and includes a pressurizing pump and a first regulation valve. The second line supplies cryogenic fuel in the gaseous state and includes a compressor and a first control valve. The recirculation line includes a second regulation valve and with a first heat exchanger. The pressure sensor detects the pressure inside the storage tank. The controller receives the pressure and controls the first and second regulation valves, the first control valve, the pressurizing pump, the booster pump and the compressor, as a function of a value of a setpoint pressure inside the storage tank.

Gas Supply System and Method of Gas Supply
20170314739 · 2017-11-02 · ·

A valve arrangement (10) adapted to be coupled to, and to provide a gas flow from, a gas cylinder (20) containing a pressurized gas (21), the valve arrangement (10) comprising a blocking valve (1) with an obturator (11) movable by an actuator (12) from an opening position permitting a flow of the pressurized gas (21) through the blocking valve (1) into a closing position blocking the flow of the pressurized gas (21) through the blocking valve (1) is provided. Temperature sensing means (4) are provided which are adapted to provide at least one signal, the at least one signal being indicative of one or more temperatures of, in, and/or in vicinity to, the valve arrangement (10), and the actuator (12) is adapted to move the obturator (11) from the opening position into the closing position if the one or more temperatures indicated by the at least one signal are above a predetermined threshold value. A gas supply system (100) and a corresponding method of gas supply is also part of the invention.

FILLING STATION FOR GAS BOTTLES AND FILLING METHOD
20170314733 · 2017-11-02 ·

The filling station according to the invention enables an automated refilling of a gas bottle by an end-user. This comprises an insertion device, which enables an end-user to insert an emptied gas bottle into the filling station. The filling station comprises a closing device for closing the filling station after the insertion of the gas bottle such that a removal of the gas bottle subsequent to the closing is not possible. The end-user may not remove the gas bottle in a closed state. Furthermore, the filling station comprises a filling device for an automated filling of an into the filling station inserted emptied gas bottle subsequent to the closing. A filling may thus only take place, if the filling station is closed and in consequence the gas bottle cannot be removed. There is a gas testing device for an automated gas leakage test after a refilling of an inserted gas bottle. With it, the tightness of a once again filled gas bottle is tested. There is a release device that releases an afore filled or full gas bottle only after a successful gas leakage test and thus enables a removal of a once again filled gas bottle. A removal of a gas bottled filled with gas respectively liquid gas is thus only possible, if the gas leakage test revealed that no gas escapes from the filled bottle. The invention further concerns a method for refilling.