Patent classifications
H01H43/16
Schedule preparation method for substrate processing device and substrate processing device
A method by which a schedule preparing portion included in a substrate processing apparatus, having at least one single substrate processing unit and a controller, prepares a chronological schedule for operations of the substrate processing apparatus. The method includes a schedule preparation step of preparing a schedule for each substrate by positioning, in chronological order, a plurality of blocks, each specifying an operation to be performed on the substrate. The schedule preparation step includes a high load avoidance positioning step in which, in preparing a schedule for a plurality of substrates, blocks corresponding to a high load operation in which a high control load occurs at least temporarily in the controller are positioned on a time axis so that high load time slots, during which a high control load occurs in the controller, are not concentrated.
Schedule preparation method for substrate processing device and substrate processing device
A method by which a schedule preparing portion included in a substrate processing apparatus, having at least one single substrate processing unit and a controller, prepares a chronological schedule for operations of the substrate processing apparatus. The method includes a schedule preparation step of preparing a schedule for each substrate by positioning, in chronological order, a plurality of blocks, each specifying an operation to be performed on the substrate. The schedule preparation step includes a high load avoidance positioning step in which, in preparing a schedule for a plurality of substrates, blocks corresponding to a high load operation in which a high control load occurs at least temporarily in the controller are positioned on a time axis so that high load time slots, during which a high control load occurs in the controller, are not concentrated.
SCHEDULE PREPARATION METHOD FOR SUBSTRATE PROCESSING DEVICE AND SUBSTRATE PROCESSING DEVICE
A method by which a schedule preparing portion included in a substrate processing apparatus, having at least one single substrate processing unit and a controller, prepares a chronological schedule for operations of the substrate processing apparatus. The method includes a schedule preparation step of preparing a schedule for each substrate by positioning, in chronological order, a plurality of blocks, each specifying an operation to be performed on the substrate. The schedule preparation step includes a high load avoidance positioning step in which, in preparing a schedule for a plurality of substrates, blocks corresponding to a high load operation in which a high control load occurs at least temporarily in the controller are positioned on a time axis so that high load time slots, during which a high control load occurs in the controller, are not concentrated.
SCHEDULE PREPARATION METHOD FOR SUBSTRATE PROCESSING DEVICE AND SUBSTRATE PROCESSING DEVICE
A method by which a schedule preparing portion included in a substrate processing apparatus, having at least one single substrate processing unit and a controller, prepares a chronological schedule for operations of the substrate processing apparatus. The method includes a schedule preparation step of preparing a schedule for each substrate by positioning, in chronological order, a plurality of blocks, each specifying an operation to be performed on the substrate. The schedule preparation step includes a high load avoidance positioning step in which, in preparing a schedule for a plurality of substrates, blocks corresponding to a high load operation in which a high control load occurs at least temporarily in the controller are positioned on a time axis so that high load time slots, during which a high control load occurs in the controller, are not concentrated.