Patent classifications
B09B1/004
Water and soil conservation and ecological restoration method of high and steep, abandoned slag piles at high elevation with large temperature difference in dry, hot valley
A water and soil conservation and ecological restoration method of high and steep, abandoned slag piles at high elevation with large temperature differential in xerothermic drought valleys, comprises: preparing a mixed material; collecting and cutting a plant to obtain a plant ingredient; preparing a treated material; digging tree holes; planting; spreading the treated material, and watering. The water and soil conservation method adds gelling material for cover soil, and stirs to allow fine particles in the cover soil to be uniformly coated on the coarse particles to realize coherence, thus effectively avoiding water erosion and wind erosion on the loose cover soil on a slope and slag pile, reducing the cover soil falling into gaps of large slag pieces on the slope surface, thus controlling the water and cover soil conservation of a slag pile, and the scale of fill earth, and ensuring the survival rate and preservation rate of planted trees.
SEDIMENT CAPPING LAYER CONSTRUCTED FROM SAND ADHERED SORBENT MATERIAL
The invention is a sediment capping structure which utilizes material comprised of an activated carbon physically attached to sand particles. Attachment of the sorbent material to sand particles improves particle density and heterogeneous delivery of the sorptive layer of the sediment cap.
WEDGE-WELDABLE MANUFACTURED COMPOSITE HAVING SYNTHETIC VEGETATION AND IMPERMEABLE GEOMEMBRANE
A manufactured composite comprising synthetic turf and impermeable geomembrane is used in a single-layer capping system as the single layer to provide permanent, impermeable and functional aesthetic cover for a job site. During installation of composite pieces at a job site, an edge portion of a tufted section of a second composite piece is overlaid onto an edge untufted section of the first composite piece already laid and anchored over foundation soil to form a reinforced overlapping seam, through which the two composite pieces are physically and permanently joined together. As composite pieces are joined together, the continuity of synthetic grass and the continuity of impermeability are extended and realized over the entire site to form permanent, impermeable and functional aesthetic cover for a job site.
Waste disposal closure system
An impoundment closure system that employs a low permeability membrane on top of a waste materials with ponded water on top of the low permeability membrane.
FLEXIBLE MAT FORMING SYSTEM AND METHOD
In an exemplary embodiment, a flexible mat forming system includes a rotating drum having a plurality of mold cavities about an outer periphery thereof; a hopper positioned adjacent the drum, the hopper shaped to receive a hardenable paste and deposit the hardenable paste into successive mold cavities of the plurality of mold cavities facing the hopper, as the drum rotates relative to the hopper; wherein the hopper includes an opening shaped and positioned to align with the mold cavities facing the hopper; and a sheet of mesh material that is fed between the hopper and the mold cavities facing the hopper.
ISOLATION AND RESTORATION METHOD FOR COMPOUND CONTAMINATED SOIL
The present disclosure provides an isolation and restoration method for compound contaminated soil. The isolation and restoration method for the compound contaminated soil provided by the present disclosure is used for isolation and restoration of a contaminated site, which includes: laying an isolation layer, a pure soil layer and an arable soil layer containing compound soil in turn on the contaminated site which is flattened and compacted, where the compound soil is composed of loess, slaked lime, fine sand and substances having an adsorption function in a volume ratio.
LOW-PROFILE FLUID CONDUIT/COLLECTOR AND SYSTEM
A low-profile fluid collection conduit includes an elongate outer cover having an upper portion and a lower portion generally opposite the upper portion, with the outer cover being much wider than it is tall and defining an interior volume. An elongate rigid spacer is fitted within the interior volume of the elongate outer cover, with the elongate spacer allowing the majority of the interior volume to be unfilled so as to permit the flow of fluid along and within the elongate outer cover. The collection conduit is used with a fluid-impermeable membrane as part of a landfill fluid collection and conveyance system.
Dynamic two-way guide and drainage control method for leachate and landfill gas
Provided is a dynamic two-way guide and drainage control method for leachate and landfill gas. The dynamic two-way guide and drainage control method is used in a waste landfill. By implementing the present invention, the water-guiding permeability inside the waste body is improved, and the problems that the water level of the leachate is raised, the landfill gas is escaped, the collection efficiency is extremely low and the like during a waste landfilling process at present are solved.
Flexible mat forming system
A flexible mat forming system may include an elongate, rotatable drum having a plurality of transverse rows of mold cavities about an outer periphery thereof, an elongate hopper positioned adjacent the drum, the hopper shaped to receive a hardenable paste and deposit the hardenable paste along a facing row of the plurality of transverse rows of mold cavities, a spool assembly for feeding a sheet of mesh material between the hopper and the facing row, and a retaining plate extending partially about the outer periphery of the drum and positioned on a downstream side of the elongate hopper, the retaining plate spaced sufficiently close to the outer periphery to retain the mesh material against the outer periphery of the drum and the hardenable paste within the mold cavities adjacent the retaining plate.
PAC-BASED CAP DELIVERY METHODS
Disclosed are novel remedial capping methods comprising: (a) providing an organic adsorption ingredient and an organic polymer delivery ingredient; (b) providing a non-organic silica carrier ingredient; (c) blending the organic adsorption ingredient, the organic polymer delivery ingredient, and the non-organic silica carrier ingredient to form a capping composition layer mixture; (d) delivering the capping composition layer mixture to a delivery means; and (e) distributing the capping composition layer mixture throughout a distribution pool and forming a capping composition layer in an area in need of remediation.