Patent classifications
B63B27/04
METHOD FOR RISER STRING HANDLING AND AN OFFSHORE DRILLING VESSEL
The present invention relates to a method for riser string handling on an offshore drilling vessel (1), the offshore drilling vessel comprising a multiple firing line hoist system, a riser tensioner system (50) arranged in the second firing line, and a suspended riser transfer device (60). The method comprising the steps of lowering a riser string in the first firing line, and simultaneously assembling and preparing a riser tensioner system in the second firing line, wherein the riser hang-off assembly displaces the riser string, leaving the top end of the riser string exposed, from the first firing line to the second firing line to be connected to the riser tensioner system.
METHOD FOR RISER STRING HANDLING AND AN OFFSHORE DRILLING VESSEL
The present invention relates to a method for riser string handling on an offshore drilling vessel (1), the offshore drilling vessel comprising a multiple firing line hoist system, a riser tensioner system (50) arranged in the second firing line, and a suspended riser transfer device (60). The method comprising the steps of lowering a riser string in the first firing line, and simultaneously assembling and preparing a riser tensioner system in the second firing line, wherein the riser hang-off assembly displaces the riser string, leaving the top end of the riser string exposed, from the first firing line to the second firing line to be connected to the riser tensioner system.
Offshore drilling vessel
An offshore drilling vessel includes a main deck, a moonpool a firing line hoist system having a tower, a BOP transport system and a pivotally supported U-shaped working deck. The U-shaped working deck can be pivoted between an active position, in which it extends in a substantially horizontal direction such that it covers a portion of the moonpool, and a non-active position, in which it extends in a substantially vertical direction such that it provides room for a BOP to be moved by the BOP transport system from a storage position adjacent the moonpool into a launch position above the moonpool, in which launch position the BOP is located between the tower and the working deck.
Offshore drilling vessel
An offshore drilling vessel includes a main deck, a moonpool a firing line hoist system having a tower, a BOP transport system and a pivotally supported U-shaped working deck. The U-shaped working deck can be pivoted between an active position, in which it extends in a substantially horizontal direction such that it covers a portion of the moonpool, and a non-active position, in which it extends in a substantially vertical direction such that it provides room for a BOP to be moved by the BOP transport system from a storage position adjacent the moonpool into a launch position above the moonpool, in which launch position the BOP is located between the tower and the working deck.
Method for riser string handling and an offshore drilling vessel
A method for riser string handling on an offshore drilling vessel, the offshore drilling vessel including a multiple firing line hoist system, a riser tensioner system arranged in the second firing line, and a suspended riser transfer device. The method including the steps of lowering a riser string in the first firing line, and simultaneously assembling and preparing a riser tensioner system in the second firing line, wherein the riser hang-off assembly displaces the riser string, leaving the top end of the riser string exposed, from the first firing line to the second firing line to be connected to the riser tensioner system.
Method for riser string handling and an offshore drilling vessel
A method for riser string handling on an offshore drilling vessel, the offshore drilling vessel including a multiple firing line hoist system, a riser tensioner system arranged in the second firing line, and a suspended riser transfer device. The method including the steps of lowering a riser string in the first firing line, and simultaneously assembling and preparing a riser tensioner system in the second firing line, wherein the riser hang-off assembly displaces the riser string, leaving the top end of the riser string exposed, from the first firing line to the second firing line to be connected to the riser tensioner system.
Articulated operating arm with swivel joint mechanism
Articulated operating arm (100) on which one or more implements are or can be mounted, comprising substantially three articulations (101,102,103) which are pivotally connected to each other, which substantially three articulations comprise a first articulation, a second articulation and a third articulation which is intended for connection to the one or more implements, which second articulation is pivotally connected at a first end to the first articulation an at a second end to the third articulation, wherein the substantially three articulations are rotatable adjacently of each other in order to form a shortened arm, this such that during the rotation a mechanical locking of the third articulation occurs between the second and the first articulations.
METHOD FOR RISER STRING HANDLING AND AN OFFSHORE DRILLING VESSEL
A method for riser string handling on an offshore drilling vessel, the offshore drilling vessel including a multiple firing line hoist system, a riser tensioner system arranged in the second firing line, and a suspended riser transfer device. The method including the steps of lowering a riser string in the first firing line, and simultaneously assembling and preparing a riser tensioner system in the second firing line, wherein the riser hang-off assembly displaces the riser string, leaving the top end of the riser string exposed, from the first firing line to the second firing line to be connected to the riser tensioner system.
METHOD FOR RISER STRING HANDLING AND AN OFFSHORE DRILLING VESSEL
A method for riser string handling on an offshore drilling vessel, the offshore drilling vessel including a multiple firing line hoist system, a riser tensioner system arranged in the second firing line, and a suspended riser transfer device. The method including the steps of lowering a riser string in the first firing line, and simultaneously assembling and preparing a riser tensioner system in the second firing line, wherein the riser hang-off assembly displaces the riser string, leaving the top end of the riser string exposed, from the first firing line to the second firing line to be connected to the riser tensioner system.
OFFSHORE DRILLING VESSEL
An offshore drilling vessel includes a main deck, a moonpool a firing line hoist system having a tower, a BOP transport system and a pivotally supported U-shaped working deck. The U-shaped working deck can be pivoted between an active position, in which it extends in a substantially horizontal direction such that it covers a portion of the moonpool, and a non-active position, in which it extends in a substantially vertical direction such that it provides room for a BOP to be moved by the BOP transport system from a storage position adjacent the moonpool into a launch position above the moonpool, in which launch position the BOP is located between the tower and the working deck.