B23K9/028

Work hardened welds and methods for same

A tube assembly includes at least first and second tubes configured for coupling at respective ends. The first and second tubes each include a base material, and a weld interface at the respective end. The weld interface is proximate to an inner diameter and an outer diameter of the first and second tubes, and includes a weld interface segment extending therebetween. A work hardened weld assembly couples the base material of each of the first and second tubes. The work hardened weld assembly includes a weld fusion zone between the weld interfaces of the first and second tubes and the weld interface segments of the first and second tubes. The weld fusion zone is work hardened and at least the weld interface segments of the first and second tubes are work hardened between the work hardened weld fusion zone and the base material of the first and second tubes.

Internal pipeline cooler

An internal heat exchanger (IHEX) for pipeline welding includes a drive system configured to move the IHEX into a position within at least one pipe section near a weld joint location with another pipe section. The IHEX further includes a cooling section including cooling structure configured to selectively cool one or more interior surface portions of the at least one pipe section, and a controller in communication with the cooling structure and configured to activate the cooling section when the IHEX is at the position within the at least one pipe section.

PORTABLE DRILL PIPE HARD BANDING MACHINE
20170314340 · 2017-11-02 ·

A hard banding apparatus for pipes and other drilling tools. The hard banding apparatus has a floating weld box that moves in response to the shape of the item to be welded. The apparatus can include a drive roller assembly and lift mechanisms that lift and move the weld box or housing to a desired height.

Guide device for welding curvilinear pipe surfaces

Guide device for use in the processing, in particular welding, of curved surfaces, in particular pipe surfaces, comprising a flexible elongate body provided with a guide for processing means; tensioning means for tensioning the flexible body around the curved surface; wherein the flexible body is provided along its length with indicators arranged according to a determined pattern, this pattern being such that a determined position along the flexible body can be inferred on the basis of the detection of the indicators.

JOINT UNIT, MAGNETIC ROTATING ARC JOINING METHOD, AND METHOD OF MANUFACTURING JOINT UNIT
20170284570 · 2017-10-05 ·

A joint unit includes a first metal pipe, a second metal pipe, and a joint portion (a region including a joint interface at which the end faces of the first and second metal pipes are joined to each other. At the joint portion, an outer circumferential bead portion protruding toward the outer circumference side and an inner circumferential bead portion protruding toward the inner circumference side are formed. The difference between the width of the outer circumferential bead portion (the width L1 of a grinding portion and the width L2 of the inner circumferential bead portion in a direction from the first metal pipe toward the second metal pipe is equal to or smaller than 40% with respect to the average value of the width L1 of the outer circumferential bead portion and the width L2 of the inner circumferential bead portion.

JOINT UNIT, MAGNETIC ROTATING ARC JOINING METHOD, AND METHOD OF MANUFACTURING JOINT UNIT
20170284570 · 2017-10-05 ·

A joint unit includes a first metal pipe, a second metal pipe, and a joint portion (a region including a joint interface at which the end faces of the first and second metal pipes are joined to each other. At the joint portion, an outer circumferential bead portion protruding toward the outer circumference side and an inner circumferential bead portion protruding toward the inner circumference side are formed. The difference between the width of the outer circumferential bead portion (the width L1 of a grinding portion and the width L2 of the inner circumferential bead portion in a direction from the first metal pipe toward the second metal pipe is equal to or smaller than 40% with respect to the average value of the width L1 of the outer circumferential bead portion and the width L2 of the inner circumferential bead portion.

Radioactive material storage canister

A canister for storing radioactive materials includes a base plate, side wall and a top plate. The top plate includes a top surface with a top edge having a bevel, and with a channel set in from the top edge. The top plate is sealed to the sidewall by a weld formed between the beveled top edge and the top of the side wall. The base plate is sealed to a bottom of the sidewall, so that a sealed vessel is formed.

Radioactive material storage canister

A canister for storing radioactive materials includes a base plate, side wall and a top plate. The top plate includes a top surface with a top edge having a bevel, and with a channel set in from the top edge. The top plate is sealed to the sidewall by a weld formed between the beveled top edge and the top of the side wall. The base plate is sealed to a bottom of the sidewall, so that a sealed vessel is formed.

Tube Transition

A tube transition fitting includes a body having a scalloped end having a raised portion and a depressed portion connected by a continuously sloping transition portion. The fitting is formed having a first wall thickness and a second wall thickness. A tube seat is formed on a surface connected to the body, the surface being adjacent a transition from the first wall thickness to the second wall thickness. A tube transition assembly includes a header portion, the tube transition fitting, and a heat exchange tube, each being connected using one or more simplified and/or heat-optimized connections.

Method for welding thin-walled tubes by means of peak temperature temper welding

A method is disclosed for connecting two components by TIG welding, the components consisting of an air-hardening steel alloy and, for example, of the material T23 or T24. A joint is produced between the components that are to be connected, said joint widening, in particular, from an inside toward an outside. First, a root layer is welded in the region of the inside. Subsequently, a fill layer adjoining the root layer is welded, so that the joint is at least 90% filled. Finally, a cover layer is welded onto the fill layer, whereby the welding parameters are prespecified in such a manner that a temperature in an optimizing temperature range is adjusted on the inside in the region of the root layer.