B24C3/20

SHOT-BLASTING APPARATUS
20170190022 · 2017-07-06 ·

Provided is a shot-blasting apparatus which is capable of efficiently perform dust collection and ventilation of an inside of a projection chamber, even using a dust collector having a small-size and low-cost suction device. The shot-blasting apparatus comprises: a cabinet (10); a plurality of process chambers (13a, 13b) provided inside the cabinet in such a manner that each of the process chambers is capable of housing a workpiece therein and selectively movable between a carry-in-and-out position and a projection position; an air inlet port (19) for introducing external air into each of the process chambers therethrough; and an air outlet port provided at a position opposed to the air inlet port across the process chamber set at the projection position, and linearly communicated with an internal space of the process chamber set at the projection position, wherein, according to suction from the air outlet port, air is caused to flow from the air inlet port into the process chamber set at the projection position, and led to the air outlet port while passing through the process chamber set at the projection position.

SHOT-BLASTING APPARATUS
20170190022 · 2017-07-06 ·

Provided is a shot-blasting apparatus which is capable of efficiently perform dust collection and ventilation of an inside of a projection chamber, even using a dust collector having a small-size and low-cost suction device. The shot-blasting apparatus comprises: a cabinet (10); a plurality of process chambers (13a, 13b) provided inside the cabinet in such a manner that each of the process chambers is capable of housing a workpiece therein and selectively movable between a carry-in-and-out position and a projection position; an air inlet port (19) for introducing external air into each of the process chambers therethrough; and an air outlet port provided at a position opposed to the air inlet port across the process chamber set at the projection position, and linearly communicated with an internal space of the process chamber set at the projection position, wherein, according to suction from the air outlet port, air is caused to flow from the air inlet port into the process chamber set at the projection position, and led to the air outlet port while passing through the process chamber set at the projection position.

Method for cyclically screening a working chamber opening and a screening device for carrying out the method

A method and apparatus for cyclically shielding a work chamber opening (25) when loading and unloading workpieces using a conveyor device (10) that passes through the work chamber opening. A first shielding element (21) is placed at a workpiece loading station (11.1), and a second shielding element (22) is placed behind a second workpiece placement location (11.2), as viewed in the conveying direction. When the first workpiece is loaded into the work chamber (20), the first shielding element (21) is placed at or in the work chamber opening (25) by advancing the conveyor device (10). The first shielding element (21) is then removed from the work chamber opening (25) and placed behind the second shielding element (22). These steps are repeated with subsequent workpiece placement locations (11.2, 11.3, . . . ) of the conveyor device (10) and with respective cross-over changes of the shielding elements (21, 22).

Method for cyclically screening a working chamber opening and a screening device for carrying out the method

A method and apparatus for cyclically shielding a work chamber opening (25) when loading and unloading workpieces using a conveyor device (10) that passes through the work chamber opening. A first shielding element (21) is placed at a workpiece loading station (11.1), and a second shielding element (22) is placed behind a second workpiece placement location (11.2), as viewed in the conveying direction. When the first workpiece is loaded into the work chamber (20), the first shielding element (21) is placed at or in the work chamber opening (25) by advancing the conveyor device (10). The first shielding element (21) is then removed from the work chamber opening (25) and placed behind the second shielding element (22). These steps are repeated with subsequent workpiece placement locations (11.2, 11.3, . . . ) of the conveyor device (10) and with respective cross-over changes of the shielding elements (21, 22).