B66C23/28
Tower crane
The present invention relates to a tower crane, in particular a revolving tower crane, comprising a crane tower composed of a plurality of tower pieces, a main boom arranged at the tower tip, and a counter-boom, wherein at least one main hoist rope is guided over the main boom to take up the load and at least one counter-boom hoist rope is guided over the counter-boom to take up a balance weight.
ENERGY STORAGE SYSTEM AND METHOD
An energy storage system includes a crane and a plurality of blocks, where the crane is operable to move blocks from a lower elevation to a higher elevation (via stacking of the blocks) to store electrical energy as potential energy of the blocks, and then operable to move blocks from a higher elevation to a lower elevation (via unstacking of the blocks) to generate electricity based on the kinetic energy of the block when lowered (e.g., by gravity). The energy storage system can, for example, store electricity generated from solar power as potential energy in the stacked blocks during daytime hours when solar power is available, and can convert the potential energy in the stacked blocks into electricity during nighttime hours when solar energy is not available, and deliver the converted electricity to the power grid.
Energy storage system and method
An energy storage system includes a crane and a plurality of blocks, where the crane is operable to move blocks from a lower elevation to a higher elevation (via stacking of the blocks) to store electrical energy as potential energy of the blocks, and then operable to move blocks from a higher elevation to a lower elevation (via unstacking of the blocks) to generate electricity based on the kinetic energy of the block when lowered (e.g., by gravity). The energy storage system can, for example, store electricity generated from solar power as potential energy in the stacked blocks during daytime hours when solar power is available, and can convert the potential energy in the stacked blocks into electricity during nighttime hours when solar energy is not available, and deliver the converted electricity to the power grid.
Energy storage system and method
An energy storage system includes a crane and a plurality of blocks, where the crane is operable to move blocks from a lower elevation to a higher elevation (via stacking of the blocks) to store electrical energy as potential energy of the blocks, and then operable to move blocks from a higher elevation to a lower elevation (via unstacking of the blocks) to generate electricity based on the kinetic energy of the block when lowered (e.g., by gravity). The energy storage system can, for example, store electricity generated from solar power as potential energy in the stacked blocks during daytime hours when solar power is available, and can convert the potential energy in the stacked blocks into electricity during nighttime hours when solar energy is not available, and deliver the converted electricity to the power grid.
Energy storage system and method
An energy storage system includes a crane and a plurality of blocks, where the crane is operable to move blocks from a lower elevation to a higher elevation (via stacking of the blocks) to store electrical energy as potential energy of the blocks, and then operable to move blocks from a higher elevation to a lower elevation (via unstacking of the blocks) to generate electricity based on the kinetic energy of the block when lowered (e.g., by gravity). The energy storage system can, for example, store electricity generated from solar power as potential energy in the stacked blocks during daytime hours when solar power is available, and can convert the potential energy in the stacked blocks into electricity during nighttime hours when solar energy is not available, and deliver the converted electricity to the power grid.
CRANE AND METHOD FOR INFLUENCING A DEFORMATION OF A JIB SYSTEM OF SAID CRANE
A crane having at least one jib system, a sensor unit for detecting a deformation of the jib system transversely to a load plane, and to an activatable adjustment unit for influencing the deformation of the jib system transversely to the load plane.
Crane and method for influencing a deformation of a jib system of said crane
A crane having at least one jib system, a sensor unit for detecting a deformation of the jib system transversely to a load plane, and to an activatable adjustment unit for influencing the deformation of the jib system transversely to the load plane.
Energy storage system and method
A an energy storage system includes a crane and a plurality of blocks, where the crane is operable to move blocks from a lower elevation to a higher elevation (via stacking of the blocks) to store electrical energy as potential energy of the blocks, and then operable to move blocks from a higher elevation to a lower elevation (via unstacking of the blocks) to generate electricity based on the kinetic energy of the block when lowered (e.g., by gravity). The energy storage system can, for example, store electricity generated from solar power as potential energy in the stacked blocks during daytime hours when solar power is available, and can convert the potential energy in the stacked blocks into electricity during nighttime hours when solar energy is not available, and deliver the converted electricity to the power grid.
Climbing system for a crane
The invention relates to a climbing system (1) for a crane. The system comprises a climbing apparatus (2) for inserting a mast section (3) or for removing a mast section (3) from a tower structure (4) of a crane, and a control unit (5) for controlling the climbing apparatus (2). The system is furthermore characterized in that the system comprises a first sensor (51) for monitoring a state of a connection means of the climbing apparatus (2) and/or the tower structure (4), wherein the first sensor (51) is connected to the control unit (5). A climbing process of a crane can thus be simplified and the safety of the climbing process can be increased.
Boom attach/detach device of crane and boom attach/detach method for crane
A boom attach/detach device includes a boom, an extensible cylinder, and a boom supporting device. At least a part of the boom supporting device is arranged more to a boom front end side than an upper slewing body. When the extensible cylinder conducts extension and contraction operation in a state where coupling between the upper slewing body and the boom by a boom foot pin is cut off, the boom supporting device supports the boom to enable a rear end portion of the boom to move in a boom axis direction. The boom can be attached or detached with ease without a need to use a separate power device from a crane to suppress increases in size, in mass, and in cost of an upper slewing body.