Patent classifications
B28B7/0091
BLADDER CAST SLURRY INFILTRATION
A method of forming a bladder cast ceramic matrix composite (CMC) article including infiltrating a CMC substrate positioned in a cavity of a mold body with a slurry. The CMC substrate includes reinforcement material defining inner spaces. The slurry includes solid particles and a carrier material. During infiltration, the slurry at least partially fills at least a portion of the inner spaces of the CMC substrate. The method also includes inflating at least one bladder that is coupled to the mold body and disposed within the cavity such that a surface of the at least one bladder in an inflated configuration contacts at least one surface of the CMC substrate. The method also includes drying the slurry to remove at least a portion of the carrier material form an infiltrated CMC and deflating the at least one bladder.
Method for producing the molded body
A second mold is placed on a planar surface of a first mold to form a first mold cavity, which is filled with a first material slurry containing a first material powder and the molded slurry is caused to set, thereby forming a first molded part on the planar surface of the first mold. A third mold is placed on the planar surface of the first mold from which the second mold is removed and on which the first molded part is formed, thereby forming a second mold cavity. The second mold cavity is filled with a second material slurry which contains a second material powder different from the first material powder so as to mold the slurry in contact with the first molded part. The molded slurry is caused to set, thereby forming a second molded part on the planar surface of the first mold.
Pre-Stressed Box Culvert and Methods for Assembly Thereof
A pre-stressed concrete box culvert includes a three-sided culvert top section having a pre-stressed top slab, a first sidewall and a second sidewall. The first and the second sidewalls extend orthogonally from opposite ends of the pre-stressed top slab, and the first and the second sidewalls each include a free end that has at least one male or female connector. The pre-stressed concrete box culvert includes a three-sided culvert bottom section having a pre-stressed bottom slab and a third sidewall and a fourth sidewall. The third and the fourth sidewalls extend orthogonally from opposite ends of the pre-stressed bottom slab, and the third and the fourth sidewalls each include a free end that has at least one male or female connector to mate with the at least one corresponding male or female connector arranged at one of the respective free ends of the first and the second sidewalls.
Pre-stressed box culvert and methods for assembly thereof
A pre-stressed concrete box culvert includes a three-sided culvert top section having a pre-stressed top slab, a first sidewall and a second sidewall. The first and the second sidewalls extend orthogonally from opposite ends of the pre-stressed top slab, and the first and the second sidewalls each include a free end that has at least one male or female connector. The pre-stressed concrete box culvert includes a three-sided culvert bottom section having a pre-stressed bottom slab and a third sidewall and a fourth sidewall. The third and the fourth sidewalls extend orthogonally from opposite ends of the pre-stressed bottom slab, and the third and the fourth sidewalls each include a free end that has at least one male or female connector to mate with the at least one corresponding male or female connector arranged at one of the respective free ends of the first and the second sidewalls.
SEMICONDUCTOR MANUFACTURING DEVICE MEMBER, METHOD FOR MANUFACTURING THE SAME, AND FORMING DIE
A semiconductor manufacturing device member according to the present invention includes a ceramic disc with an internal electrode and a ceramic shaft that supports the disc. The disc and the shaft are integrated without having a bonding interface.
Pre-Stressed Box Culvert and Methods for Assembly Thereof
A pre-stressed concrete box culvert includes a three-sided culvert top section having a pre-stressed top slab, a first sidewall and a second sidewall. The first and the second sidewalls extend orthogonally from opposite ends of the pre-stressed top slab, and the first and the second sidewalls each include a free end that has at least one male or female connector. The pre-stressed concrete box culvert includes a three-sided culvert bottom section having a pre-stressed bottom slab and a third sidewall and a fourth sidewall. The third and the fourth sidewalls extend orthogonally from opposite ends of the pre-stressed bottom slab, and the third and the fourth sidewalls each include a free end that has at least one male or female connector to mate with the at least one corresponding male or female connector arranged at one of the respective free ends of the first and the second sidewalls.
Pre-stressed box culvert and methods for assembly thereof
A pre-stressed concrete box culvert includes a three-sided culvert top section having a pre-stressed top slab, a first sidewall and a second sidewall. The first and the second sidewalls extend orthogonally from opposite ends of the pre-stressed top slab, and the first and the second sidewalls each include a free end that has at least one male or female connector. The pre-stressed concrete box culvert includes a three-sided culvert bottom section having a pre-stressed bottom slab and a third sidewall and a fourth sidewall. The third and the fourth sidewalls extend orthogonally from opposite ends of the pre-stressed bottom slab, and the third and the fourth sidewalls each include a free end that has at least one male or female connector to mate with the at least one corresponding male or female connector arranged at one of the respective free ends of the first and the second sidewalls.
Method of manufacturing and assembly of a series of prefabricated prefinished volumetric construction (PPCV) modules
A method of manufacturing a series of prefabricated prefinished volumetric construction (PPCV) modules, including the steps of casting a slab of a new module in the series of modules against an adjoining slab of a previous module in the series of modules; casting opposed walls of the new module on opposed sides of the slab, wherein one of said walls is cast against an adjoining wall of said previous module; casting a roof slab on said opposed walls of the new module, the roof slab being cast against an adjoining roof slab of said previous module; separating the new module from the previous module; repeating steps (a) to (d) for each successive module in the series, wherein the side walls of each module in the series of modules are matched to side walls of neighboring modules in the series of modules.
METHOD OF MANUFACTURING AND ASSEMBLY OF A SERIES OF PREFABRICATED PREFINISHED VOLUMETRIC CONSTRUCTION (PPCV) MODULES
A method of manufacturing a series of prefabricated prefinished volumetric construction (PPCV) modules, including the steps of casting a slab of a new module in the series of modules against an adjoining slab of a previous module in the series of modules; casting opposed walls of the new module on opposed sides of the slab, wherein one of said walls is cast against an adjoining wall of said previous module; casting a roof slab on said opposed walls of the new module, the roof slab being cast against an adjoining roof slab of said previous module; separating the new module from the previous module; repeating steps (a) to (d) for each successive module in the series, wherein the side walls of each module in the series of modules are matched to side walls of neighboring modules in the series of modules.
Consecutive piecewise molding system and method
The present invention is directed to a method for additively fabricating a solid object from a series of components. The method utilizes additive fabrication with a programmed computer operating a machine to produce a solid object based on a three dimensional, computerized rendering of the solid object. Each component is produced from one or more molds which are filled with a fluid material that solidifies into a component that attaches to a previously manufactured component by way of the same process.