Patent classifications
B61L3/221
TRAIN-INFORMATION MANAGEMENT DEVICE AND TRAIN-INFORMATION MANAGEMENT METHOD
A train-information management device mounted on a train, includes: an intra-block position calculator to convert information on a kilometrage that indicates a position of the train into information on a block number and an intra-block position of a plurality of blocks into which a route of the train is divided and that are used when a train position is specified by a train radio system; and an on-board router to communicate the information on the block number and the intra-block position to a ground side by using a system that is different from a system that is used for communication between the ground side and a train side via a radio base station in the train radio system.
SYSTEM AND METHOD FOR VIRTUAL BLOCK STICK CIRCUITS
A system and method for virtual block stick circuits is presented. The present disclosure implements specialized algorithms adapted to determine the true status of a virtual block based on multiple inputs from different perspectives. In one embodiment, the system can use the far house perspective of that virtual track segment and the PTC hazard for the near virtual track segment directly adjacent to the near house uses the near house perspective of that virtual track segment. For the middle virtual track segments, the near house perspectives of the middle virtual track segments are held ‘TRUE’ if they are already ‘TRUE’ when the train first enters the block, using stick circuits for the near house perspective of the middle track circuits. The vital application can then indicate the true state of the virtual track segment as occupied (FALSE), to protect the train from trains that follow.
Wayside to railway vehicle communication method and device
A wayside to railway vehicle communication method including providing a first wayside device with a transmitter device capable of transmitting a data packet message to a railway vehicle travelling along a section of a railway track, through an electric waveform put into a rail of the section, and sending at least one message from the transmitter device to the railway vehicle, wherein the at least one message corresponds to the conversion of the data packet into a modulated electric waveform, the data packet including several data bits providing information relative to a plurality of speed limits the railway vehicle has to respect while travelling along respective portions of the section.
Automatic train stop control system
A method controls a movement of a train to a stop at a stopping position between a first position and a second position. The method determines constraints of a velocity of the train with respect to a position of the train forming a feasible area for a state of the train during the movement, such that an upper curve bounding the feasible area has a zero velocity only at the second position, and a lower curve bounding the feasible region has a zero velocity only at the first position. Next, the method controls the movement of the train subject to the constraints.
System and method for virtual block stick circuits
A system and method for virtual block stick circuits is presented. The present disclosure implements specialized algorithms adapted to determine the true status of a virtual block based on multiple inputs from different perspectives. In one embodiment, the system can use the far house perspective of that virtual track segment and the PTC hazard for the near virtual track segment directly adjacent to the near house uses the near house perspective of that virtual track segment. For the middle virtual track segments, the near house perspectives of the middle virtual track segments are held ‘TRUE’ if they are already ‘TRUE’ when the train first enters the block, using stick circuits for the near house perspective of the middle track circuits. The vital application can then indicate the true state of the virtual track segment as occupied (FALSE), to protect the train from trains that follow.
SYSTEM AND METHOD FOR VIRTUAL BLOCK OPERATIONAL STATUS CONTROL WITH LONG BLOCK TIME DELAY
A system and method for virtual block operational status control with long block time delay is presented. The present disclosure can advantageously increase the capacity and safety of the existing railroad track infrastructure used by the railroads by determining whether a virtual block is healthy or unhealthy. The long block mode can provide a coarse granularity on the presence of a train. In virtual block mode, the system can implement a finer granularity so the virtual aspects of the sub blocks can be realized. The present disclosure provides a long block mode that can provide the system an opportunity to analyze the potential tradeoffs between granularity and reliability by determining which mode (virtual block or long block) is best utilized in a given situation. The system can operate by default in long block mode and ignore the virtual block capabilities until absolutely needed.
SYSTEM AND METHOD FOR VIRTUAL BLOCK STICK CIRCUITS
A system and method for virtual block stick circuits is presented. The present disclosure implements specialized algorithms adapted to determine the true status of a virtual block based on multiple inputs from different perspectives. In one embodiment, the system can use the far house perspective of that virtual track segment and the PTC hazard for the near virtual track segment directly adjacent to the near house uses the near house perspective of that virtual track segment. For the middle virtual track segments, the near house perspectives of the middle virtual track segments are held ‘TRUE’ if they are already ‘TRUE’ when the train first enters the block, using stick circuits for the near house perspective of the middle track circuits. The vital application can then indicate the true state of the virtual track segment as occupied (FALSE), to protect the train from trains that follow.
METHOD, SYSTEM, COMPUTER-READABLE MEDIUM COMPRISING SOFTWARE CODE FOR ESTIMATING PARAMETERS OF RAILWAY TRACK CIRCUITS, AND RELATED TRACK CIRCUIT
Estimating electrical parameters of a track circuit including a transmitter, a receiver, and a track section between the transmitter and receiver. The transmitter outputs, over the track section towards the receiver, a signal including a data packet part, and the signal received by the receiver is decoded to determine the data packet received. Simulated signals are generated, via a predetermined software model including parameters of the track circuit, by varying an actual value input for the model parameters, each signal generated corresponding to actual values input for the parameters. Each simulated signal is compared with the signal received at a receiver until finding a part of a simulated signal that matches a corresponding part of the signal received at a receiver. The actual parameter values corresponding to the simulated signal that match the signal received at the receiver are estimated as the actual parameters of the track circuit.
Railroad virtual track block system
A method of railroad track control includes partitioning a physical track block into a plurality of virtual track blocks, the physical track block defined by first and second insulated joints disposed at corresponding first and second ends of a length of railroad track. The presence of an electrical circuit discontinuity in one of the plurality of virtual track blocks; is detected and in response a corresponding virtual track block position code indicating the presence of the discontinuity in the one of the plurality of virtual track blocks is generated.
Railroad virtual track block system
A method of railroad track control includes partitioning a physical track block into a plurality of virtual track blocks, the physical track block defined by first and second insulated joints disposed at corresponding first and second ends of a length of railroad track. The presence of an electrical circuit discontinuity in one of the plurality of virtual track blocks; is detected and in response a corresponding virtual track block position code indicating the presence of the discontinuity in the one of the plurality of virtual track blocks is generated.