ASSEMBLY AND METHOD FOR INSTALLING A PILE INTO A SEABED
20230046101 · 2023-02-16 ·

The present invention relates to an assembly for installing a pile (2) in a seabed (3), the assembly comprising a vessel (23) comprising a positioning system for keeping the vessel (23) at an installation location relative to the seabed, the positioning tem (5) having a positioning stiffness (7); a pile guiding system configured to guide the pile (2) during installation thereof, the pile guiding system comprising a base (9) provided on the vessel; a first guiding device connected to the base, the first guiding device being configured to accommodate the pile during installation thereof; a resilient member (11) for providing a resilient connection between the vessel (23) and the pile during installation thereof for allowing relative motions between the pile (2) and the vessel (23), the resilient member having a connection stiffness, wherein the resilient member (11) is configured and intended to keep a natural period of a pivoting movement of the pile about the seabed caused by waves during installation thereof longer than a dominant wave period of a wave spectrum at the installation location by providing the resilient connection with a low connection stiffness.

Split crane for installation of wind turbines and other tall structures

The present invention relates to a method for installing a wind turbine or other tall structure at a target location at sea, the method comprising: —providing an installation vessel comprising at least one crane, wherein the crane comprises a lower boom part, a right boom part, and a left boom part, wherein the right boom part and the left boom part are connected to an upper portion of the lower boom part and extend from said upper portion, wherein a space is present between the right and left boom part, —lifting a tall structure part, in particular the nacelle assembly, with the crane, wherein in top view the tall structure part is supported at least partially between the right and left boom part by one or more hoist lines extending from the right and left boom part to the tall structure part.

Split crane for installation of wind turbines and other tall structures

The present invention relates to a method for installing a wind turbine or other tall structure at a target location at sea, the method comprising: —providing an installation vessel comprising at least one crane, wherein the crane comprises a lower boom part, a right boom part, and a left boom part, wherein the right boom part and the left boom part are connected to an upper portion of the lower boom part and extend from said upper portion, wherein a space is present between the right and left boom part, —lifting a tall structure part, in particular the nacelle assembly, with the crane, wherein in top view the tall structure part is supported at least partially between the right and left boom part by one or more hoist lines extending from the right and left boom part to the tall structure part.

FEEDER VESSEL

A feeder vessel for the onshore-to-offshore transport of elongate wind turbine objects with a motion compensating carrier assembly having a motion compensated platform for receiving and retaining the elongate object, and a motion compensation mechanism. The motion compensation mechanism includes extendable actuators which passively compensate motions of the platform out of a neutral position, and winches driving carrier cables such that traction by the respective carrier winch counteracts an extension of at least one of the carrier actuators. The winches are embodied as active motion compensation winches to compensate movements of the platform.

FEEDER VESSEL

A feeder vessel for the onshore-to-offshore transport of elongate wind turbine objects with a motion compensating carrier assembly having a motion compensated platform for receiving and retaining the elongate object, and a motion compensation mechanism. The motion compensation mechanism includes extendable actuators which passively compensate motions of the platform out of a neutral position, and winches driving carrier cables such that traction by the respective carrier winch counteracts an extension of at least one of the carrier actuators. The winches are embodied as active motion compensation winches to compensate movements of the platform.

METHOD OF LOADING/UNLOADING CONTAINERS IN A PORT FACILITY
20180005181 · 2018-01-04 ·

There is the method of loading and unloading containers in a port facility. The facility includes quayside cranes, automated gantries for stacking/unstacking containers, vehicles for transporting containers, communication lanes for vehicles including transit lanes under each quayside crane and parallel circulation lanes situated between the quayside cranes and access lanes to the automated gantries. The method includes managing journeys of the vehicles as a function of the container removal and placement requirements, in particular the allocating to each vehicle of a task and of a destination and the selecting of a provisional parking site for the vehicles in transit in buffer zones provided for this purpose. The vehicles are assigned to provisional parking sites under the cranes and/or in the proximal circulation lane of the cranes, which are used as a buffer zone.

Method of securing and transferring a load between a vessel and an offshore installation and an apparatus therefor
11560277 · 2023-01-24 · ·

The offshore jack-up has a hull and a plurality of moveable legs engageable with the seafloor. The offshore jack-up is arranged to move the legs with respect to the hull to position the hull out of the water. The method comprises moving at least a portion of a vessel underneath the hull of the offshore jack-up or within a cut-out of the hull when the hull is positioned out of the water and the legs engage the seafloor. A stabilizing mechanism mounted on the jack-up is engaged against the vessel. The stabilizing mechanism is pushed down on the vessel to increase the buoyant force acting on the vessel.

GEOTECHNICAL RIG SYSTEMS AND METHODS

This invention relates generally to geotechnical rig systems and methods. In one embodiment, a cone penetration testing system includes, but is not limited to, a frame; at least one rotatable reel; at least one movable roller; and at least one sensor, wherein the at least one movable roller is configured to adjust a bend radius of at least one tube coiled about the at least one rotatable reel based at least partly on data received from the at least one sensor.

GEOTECHNICAL RIG SYSTEMS AND METHODS

This invention relates generally to geotechnical rig systems and methods. In one embodiment, a cone penetration testing system includes, but is not limited to, a frame; at least one rotatable reel; at least one movable roller; and at least one sensor, wherein the at least one movable roller is configured to adjust a bend radius of at least one tube coiled about the at least one rotatable reel based at least partly on data received from the at least one sensor.

Method and apparatus for loading vessels using rotation

A method and apparatus for rapid loading stacks of items aboard vessels which can include rotating palletized items to depalletize the items, and then placing the items on a lifting robot, lifting the robot and items into the hold of a vessel, removing the items from the robot using a load push lift truck, and then using the load push lift truck to stow the items in a stowage location. The empty robot can be removed from the hold of the vessel and put in a position to receive a another depalletized stack of cartons. In one option the robot has a plurality of fork channels for receiving the blades of a load push lift truck along with receiving the blades or a rotating lift truck.