Patent classifications
C09K8/501
Primary proppant flowback control
Techniques of the present disclosure relate to proppant flowback control using a plug and perf completion. A method comprises disposing a resin in at least one cluster of fractures of a stage; disposing an activator for the resin in the stage; displacing the activator from the wellbore and into the at least one cluster of the stage with a plug attached to a perforating apparatus; setting the plug such that the resin and the activator are contained in the stage; and perforating a subsequent stage.
Thermally responsive lost circulation materials
Methods and compositions for the use of thermally responsive lost circulation materials in subterranean formations are provided. In one embodiment, the methods include introducing a treatment fluid including a base fluid and a thermally responsive lost circulation material including a thermally responsive hydrogel that includes at least one thermoresponsive polymer into a wellbore penetrating at least a portion of a subterranean formation including a loss zone; allowing the thermally responsive lost circulation material to reach a thickening transition temperature; and allowing the treatment fluid to at least partially set in the subterranean formation.
MIXTURE FOR PRE-CEMENTING OPERATION IN WELLBORE
A treatment fluid for performing one or more pre-cementing operations in a wellbore can include a base fluid, a viscosifier, and a crushed glass material. The viscosifier can be dispersed in the base fluid. The crushed glass material can be dispersed in the base fluid for performing one or more cementing operations with respect to the wellbore.
Lost Circulation Materials Comprising Cane Ash
A method for reducing lost circulation in a subterranean formation. The method includes providing a treatment fluid comprising a base fluid and a lost circulation material comprising cane ash. The treatment fluid is introduced into a wellbore within the subterranean formation such that at least a portion of the cane ash bridges openings in the subterranean formation to reduce loss of fluid circulation into the subterranean formation.
Lost Circulation Materials Comprising Brown Mud
A method for reducing lost circulation in a subterranean formation. The method includes providing a treatment fluid comprising a base fluid and a lost circulation material comprising brown mud. The treatment fluid is introduced into a wellbore within the subterranean formation such that at least a portion of the brown mud bridges openings in the subterranean formation to reduce loss of fluid circulation into the subterranean formation.
DILUENT FOR SOLIDS-CONTROL FLUID IN A WELLBORE
A solids-control fluid for controlling flow of solids in a subterranean formation is disclosed herein. The solids-control fluid can include a diluent and a curable resin. The diluent can include a mutual solvent and an ethylene glycol. The curable resin can be dispersed within the diluent for controlling flow of solids in the subterranean formation.
Lost Circulation Materials Comprising Red Mud
A method for reducing lost circulation in a subterranean formation. The method includes providing a treatment fluid comprising a base fluid and a lost circulation material comprising red mud. The treatment fluid is introduced into a wellbore within the subterranean formation such that at least a portion of the red mud bridges openings in the subterranean formation to reduce loss of fluid circulation into the subterranean formation.
COMPOSITIONS OF APHRON SEALING LOST CIRCULATION SPACER
A spacer fluid includes an aphron generating component, a polymer, a lost circulation material, and a weighting agent component.
Wellbore fluids comprising hydrated inorganic oxide materials and associated methods
A hydrated inorganic oxide material capable of elongating from a planar shape to a fiber shape along a thickness direction of the planar shape, wherein the fiber shape is at least about 25 times greater in the thickness direction than the planar shape, and wherein during elongating a radial dimension of the hydrated inorganic oxide material changes by less than about 10% may be useful in a plurality of wellbore operations. For example, a method may include introducing a wellbore fluid comprising an aqueous base fluid and a hydrated inorganic oxide material into a wellbore penetrating a subterranean formation; and swelling the hydrated inorganic oxide material by contacting the hydrated inorganic oxide material with a polar amine compound such that the hydrated inorganic oxide material elongates from a planar shape to a fiber shape along a thickness direction of the planar shape.
Method of treating subterranean formation using shrinkable fibers
A method for treating a subterranean formation utilizing a slurry having a plurality of shrinkable material. The method of treatment may include a diversion treatment during a fracturing operation. The shrinkable material may be adapted to shrink in response to a temperature change. The slurry may be used to perform a plugging of a perforation or fracture in the formation.