C10B43/06

TOWER BOTTOMS COKE CATCHING DEVICE
20230220286 · 2023-07-13 ·

A coke catching apparatus for use in hydrocarbon cracking to assist in the removal of coke and the prevention of coke build up in high coking hydrocarbon processing units. The apparatus includes a grid device for preventing large pieces of coke from entering the outlet of the process refining equipment while allowing small pieces of coke to pass through and be disposed of The coke catching apparatus can be easily disassembled to be removed from the refining process equipment and cleaned.

TOWER BOTTOMS COKE CATCHING DEVICE
20230220286 · 2023-07-13 ·

A coke catching apparatus for use in hydrocarbon cracking to assist in the removal of coke and the prevention of coke build up in high coking hydrocarbon processing units. The apparatus includes a grid device for preventing large pieces of coke from entering the outlet of the process refining equipment while allowing small pieces of coke to pass through and be disposed of The coke catching apparatus can be easily disassembled to be removed from the refining process equipment and cleaned.

Systems and methods for decoking a coker furnace during a delayed coking process

Systems and methods for efficient on-line pigging of a coker furnace without interruption of the delayed coking process, which will save time and money during the delayed coking process. This system can be retrofitted to existing coker furnaces.

Systems and methods for decoking a coker furnace during a delayed coking process

Systems and methods for efficient on-line pigging of a coker furnace without interruption of the delayed coking process, which will save time and money during the delayed coking process. This system can be retrofitted to existing coker furnaces.

Cleaning coke deposits from process equipment

A method for cleaning a coke deposit from an internal surface of a process equipment, comprising removing at least a portion of the coke deposit from the internal surface using a flexible pig comprising a plurality of bristles, without damaging a metal protective layer of the internal surface of the process equipment. A flexible pig for cleaning a coke deposit from an internal surface of a process equipment without damaging a metal protective layer of the internal surface, comprising a flexible body formed of a polymeric material, and a plurality of bristles partially encapsulated by the polymeric material of the flexible body.

Cleaning coke deposits from process equipment

A method for cleaning a coke deposit from an internal surface of a process equipment, comprising removing at least a portion of the coke deposit from the internal surface using a flexible pig comprising a plurality of bristles, without damaging a metal protective layer of the internal surface of the process equipment. A flexible pig for cleaning a coke deposit from an internal surface of a process equipment without damaging a metal protective layer of the internal surface, comprising a flexible body formed of a polymeric material, and a plurality of bristles partially encapsulated by the polymeric material of the flexible body.

Tower bottoms coke catching device

A coke catching apparatus for use in hydrocarbon cracking to assist in the removal of coke and the prevention of coke build up in high coking hydrocarbon processing units. The apparatus includes a grid device for preventing large pieces of coke from entering the outlet of the process refining equipment while allowing small pieces of coke to pass through and be disposed of. The coke catching apparatus can be easily disassembled to be removed from the refining process equipment and cleaned.

SYSTEMS AND METHODS FOR DECOKING A COKER FURNACE DURING A DELAYED COKING PROCESS

Systems and methods for efficient on-line pigging of a coker furnace without interruption of the delayed coking process, which will save time and money during the delayed coking process. This system can be retrofitted to existing coker furnaces.

SYSTEMS AND METHODS FOR DECOKING A COKER FURNACE DURING A DELAYED COKING PROCESS

Systems and methods for efficient on-line pigging of a coker furnace without interruption of the delayed coking process, which will save time and money during the delayed coking process. This system can be retrofitted to existing coker furnaces.

Cleaning Coke Deposits from Process Equipment
20170312796 · 2017-11-02 ·

A method for cleaning a coke deposit from an internal surface of a process equipment, comprising removing at least a portion of the coke deposit from the internal surface using a flexible pig comprising a plurality of bristles, without damaging a metal protective layer of the internal surface of the process equipment. A flexible pig for cleaning a coke deposit from an internal surface of a process equipment without damaging a metal protective layer of the internal surface, comprising a flexible body formed of a polymeric material, and a plurality of bristles partially encapsulated by the polymeric material of the flexible body.