E01C19/22

Tank system
11541748 · 2023-01-03 · ·

A tank system for a construction machine includes a fuel tank having an outer tank wall that closes off a tank volume to the outside, a withdrawal tank volume, which is separated by a partition wall from a main tank volume of the tank volume and has a fuel-exchanging connection to the main tank volume, and a fuel withdrawal arrangement having a main fuel pump and a withdrawal line opening into the withdrawal tank volume for conveying fuel by the main fuel pump via the withdrawal line from the withdrawal tank volume to a fuel-consuming system region. The tank system also includes a fuel feed arrangement having an auxiliary fuel pump for conveying fuel from the main tank volume into the withdrawal tank volume.

POWERTRAIN FOR PAVING MACHINE
20220389666 · 2022-12-08 ·

A paving machine is described. The paving machine includes a powertrain with a power unit. The power unit may include a diesel generator and a battery. The powertrain may also include one or more drivetrains. The drivetrains may include a hydraulic drivetrain and an electric drivetrain. The drivetrains may receive power from the power unit for supplying power to actuators of the hydraulic drivetrain and the electric drivetrain. The paving machine may be a curb-forming machine including the battery, the hydraulic drivetrain, and the electric drivetrain. The hydraulic drivetrain of the curb-forming machine may include a cylinder, crawler, steering assembly, and auger, and the electric drivetrain may include a vibrator. The paving machine may also include a number of other types of paving machines. Where the paving machine includes the hydraulic drivetrain, a buffer may be provided to ensure sufficient hydraulic power in response to demand changes.

Three-dimensional bridge deck finisher
11686053 · 2023-06-27 · ·

A bridge paving machine and method for paving a 3D design without vertical profile rails includes converting a desired design into a 3D surface model to account for certain factors known to cause deviations in the paving processes and paving the 3D surface model in the expectation that factors will cause the 3D surface model to deflect into the desired design. An on-board computer system adjusts the 3D surface model in real-time to correct for on-site variables. The on-board computer system receives data from various external sensors, including deflection sensors fixed to girders in the bride structure, and paving machine-based sensors, and uses various predictive models to predict surface deflection based on the sensor data. The 3D surface model is continuously updated based on the predictive models and actual measured deflections.

Three-dimensional bridge deck finisher
11686053 · 2023-06-27 · ·

A bridge paving machine and method for paving a 3D design without vertical profile rails includes converting a desired design into a 3D surface model to account for certain factors known to cause deviations in the paving processes and paving the 3D surface model in the expectation that factors will cause the 3D surface model to deflect into the desired design. An on-board computer system adjusts the 3D surface model in real-time to correct for on-site variables. The on-board computer system receives data from various external sensors, including deflection sensors fixed to girders in the bride structure, and paving machine-based sensors, and uses various predictive models to predict surface deflection based on the sensor data. The 3D surface model is continuously updated based on the predictive models and actual measured deflections.

Mileage and speed estimation

An approach to determining vehicle usage makes use of a sensor that provides a vibration signal associated with the vehicle, and that vibration signal is used to infer usage. Usage can include distance traveled, optionally associated with particular ranges of speed or road type. In a calibration phase, auxiliary measurements, for instance based on GPS signals, are used to determine a relationship between the vibration signal and usage. In a monitoring phase, the determined relationship is used to infer usage from the vibration signal.

Concrete screeding system with floor quality feedback/control
09835610 · 2017-12-05 · ·

A screeding system for use with a screeding machine during screeding of an uncured concrete surface includes a control and a plurality of sensors. The sensors are disposed at the screeding machine, which has a screed head assembly that is movable over uncured concrete to screed the concrete surface. The sensors include elevation sensors that sense an elevation of the screed head assembly relative to a reference plane established at the concrete area. The control processes data captured by said plurality of sensors while the screeding machine is screeding the uncured concrete surface. Responsive to the data processing of captured data, the control estimates a flatness or levelness or quality of the surface of the concrete being screeded. While the screeding machine is screeding the uncured concrete surface, the control generates an output indicative of the estimated flatness or levelness or quality of the surface.

Concrete screeding system with floor quality feedback/control
09835610 · 2017-12-05 · ·

A screeding system for use with a screeding machine during screeding of an uncured concrete surface includes a control and a plurality of sensors. The sensors are disposed at the screeding machine, which has a screed head assembly that is movable over uncured concrete to screed the concrete surface. The sensors include elevation sensors that sense an elevation of the screed head assembly relative to a reference plane established at the concrete area. The control processes data captured by said plurality of sensors while the screeding machine is screeding the uncured concrete surface. Responsive to the data processing of captured data, the control estimates a flatness or levelness or quality of the surface of the concrete being screeded. While the screeding machine is screeding the uncured concrete surface, the control generates an output indicative of the estimated flatness or levelness or quality of the surface.

PAVING SCREED WITH FASTENING DEVICE FOR A HEATING ELEMENT
20170314216 · 2017-11-02 · ·

The disclosure relates to a paving screed for a road paver that comprises a screed plate, a heating element and a fastening device for pressing the heating element onto the screed plate. The fastening device comprises an actuating member and an elastic element. The actuating member is configured to deflect through its operation the elastic element directly or indirectly by a predetermined amount, wherein the elastic element applies a predetermined force directly or indirectly onto the heating element and biases the heating element against the screed plate.

PAVER EXTENSION BRACKET DEVICE
20170298578 · 2017-10-19 ·

A paver extension bracket device automates extension and retraction of a paver platform extension to correspond to and be driven by extension and retraction of a pre-existing laterally extendable paver mechanism. The device includes a bracket configured for coupling to a laterally extending paver mechanism of a paver. A post is coupled to and extends from the bracket such that said post is configured for coupling to a paver platform extension such that the paver platform extension is extended and retracted respectively by extension and retraction of the paver mechanism.

SYSTEM AND METHOD FOR MONITORING A CONDITION OF A PAVING MACHINE
20170287236 · 2017-10-05 · ·

The present disclosure is related to a system and a method for monitoring a condition of a paving machine. The system includes a screed plate and a heating element for heating the screed plate. The system also includes a controller configured to determine a heat-up time for the screed plate and compare the heat-up time to a predetermined time. The controller is further configured to provide a signal indicating that the screed plate needs to be replaced if the heat-up time is less than or equal to the predetermined time.