E01D2/04

Temporary support system for road bridge pre-fabricated small box girder-type concealed bent cap, and method of constructing same

A temporary support system for a road bridge pre-fabricated small box girder-type concealed bent cap, and a method of constructing same. The support system comprises a main beam, a main pier support system, and a lateral pier support system; the main beam is arranged on the transverse side of road bridge piers; the main pier support system is disposed on the transverse side of a main pier area and is located under the main beam; the lower end of the main pier support system is fixed to a main pier bearing platform, whereas the upper end is fixed to the main beam; the lateral pier support system is disposed on the transverse side of a lateral pier area and is located below the main beam; and the lower end of the lateral pier support system is fixed to a lateral pier bearing platform, whereas the upper end is fixed to the main beam.

Temporary support system for road bridge pre-fabricated small box girder-type concealed bent cap, and method of constructing same

A temporary support system for a road bridge pre-fabricated small box girder-type concealed bent cap, and a method of constructing same. The support system comprises a main beam, a main pier support system, and a lateral pier support system; the main beam is arranged on the transverse side of road bridge piers; the main pier support system is disposed on the transverse side of a main pier area and is located under the main beam; the lower end of the main pier support system is fixed to a main pier bearing platform, whereas the upper end is fixed to the main beam; the lateral pier support system is disposed on the transverse side of a lateral pier area and is located below the main beam; and the lower end of the lateral pier support system is fixed to a lateral pier bearing platform, whereas the upper end is fixed to the main beam.

STEEL-CONCRETE COMPOSITE WEB AND CONSTRUCTION METHOD THEREOF

Disclosed are a steel-concrete composite web and a construction method thereof, and relate to the field of bridge engineering. The steel-concrete composite web comprises a plurality of prefabricated web segments connected in sequence, wherein each prefabricated web segment comprises a corrugated steel web and a concrete encasement, each concrete encasement is arranged on the inner side of the corresponding corrugated steel web. The right and left edges of adjacent corrugated steel web segments are connected, and a pouring space is formed between adjacent concrete encasements; and each concrete encasement is provided with joint reinforcing rebars used for stretching into the pouring space, first concrete is poured into the pouring space to form a cast-in-place wet joint, and the joint reinforcing rebars are embedded into the cast-in-place wet joint.

STEEL-CONCRETE COMPOSITE WEB AND CONSTRUCTION METHOD THEREOF

Disclosed are a steel-concrete composite web and a construction method thereof, and relate to the field of bridge engineering. The steel-concrete composite web comprises a plurality of prefabricated web segments connected in sequence, wherein each prefabricated web segment comprises a corrugated steel web and a concrete encasement, each concrete encasement is arranged on the inner side of the corresponding corrugated steel web. The right and left edges of adjacent corrugated steel web segments are connected, and a pouring space is formed between adjacent concrete encasements; and each concrete encasement is provided with joint reinforcing rebars used for stretching into the pouring space, first concrete is poured into the pouring space to form a cast-in-place wet joint, and the joint reinforcing rebars are embedded into the cast-in-place wet joint.

METHOD FOR REMOVAL OF TEMPORARY SUPPORT SYSTEM FOR ROAD BRIDGE PRE-FABRICATED SMALL BOX GIRDER-TYPE CONCEALED BENT CAP, AND EQUIPMENT THEREFOR

A method for removal of a temporary support system for a road bridge pre-fabricated small box girder-type concealed bent cap, and equipment therefor. The removal method comprises the following steps: removing cantilever beams; removing lateral pier support systems and loading same onto a truck; removing outer-side main beam sections connected to lateral pier support systems and loading same onto a truck; removing, horizontally displacing, and lowering a main beam middle section connected to the main pier support system; hoisting, lowering, and laying flat a main truss system, and loading same onto a truck; and removing a main pier vertical support system and a pad beam.

Module for a structure

A construction module for a structure, comprising: a formwork member that includes a base, a pair of parallel side walls that extend upwardly from the base, and a pair of parallel end walls. The base, the side walls and the end walls define a cavity for reinforcement and concrete. A reinforcement member includes an upper portion and a lower portion. When the reinforcement member is located in the cavity and concrete fills the cavity, the lower portion of the reinforcement member and the concrete define an elongate beam.

Module for a structure

A construction module for a structure, comprising: a formwork member that includes a base, a pair of parallel side walls that extend upwardly from the base, and a pair of parallel end walls. The base, the side walls and the end walls define a cavity for reinforcement and concrete. A reinforcement member includes an upper portion and a lower portion. When the reinforcement member is located in the cavity and concrete fills the cavity, the lower portion of the reinforcement member and the concrete define an elongate beam.

Method for removal of temporary support system for road bridge pre-fabricated small box girder-type concealed bent cap, and equipment therefor

A method for removal of a temporary support system for a road bridge pre-fabricated small box girder-type concealed bent cap, and equipment therefor. The removal method comprises the following steps: removing cantilever beams; removing lateral pier support systems and loading same onto a truck; removing outer-side main beam sections connected to lateral pier support systems and loading same onto a truck; removing, horizontally displacing, and lowering a main beam middle section connected to the main pier support system; hoisting, lowering, and laying flat a main truss system, and loading same onto a truck; and removing a main pier vertical support system and a pad beam.

Double Production Line and Rapid Prefabrication Process of Segmental Beam

The present application disclosures a double production line and a rapid prefabrication process of a segmental beam. The double production line including two production machine and a track system provided on the construction ground; the production machine includes a fixed end mold, two side molds, a bottom mold trolley, a middle internal mold trolley and two side internal mold trolley; two side molds are positioned on two sides of the fixed end mold respectively, the fixed end mold and two side molds together define a pouring position with an end opening, two openings of the pouring position are arranged facing each other; the track system includes a transverse track and a longitudinal track communicated with each other, two pouring positions are both positioned in the extension path of the transverse track, and the longitudinal track is positioned between two pouring positions.

Double Production Line and Rapid Prefabrication Process of Segmental Beam

The present application disclosures a double production line and a rapid prefabrication process of a segmental beam. The double production line including two production machine and a track system provided on the construction ground; the production machine includes a fixed end mold, two side molds, a bottom mold trolley, a middle internal mold trolley and two side internal mold trolley; two side molds are positioned on two sides of the fixed end mold respectively, the fixed end mold and two side molds together define a pouring position with an end opening, two openings of the pouring position are arranged facing each other; the track system includes a transverse track and a longitudinal track communicated with each other, two pouring positions are both positioned in the extension path of the transverse track, and the longitudinal track is positioned between two pouring positions.